Appeal 3288823
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
construction of a dropped kerb following demolition of front boundary wall and installation of an electric car charging point to front of house.
Section 02
Decision
The appeal is allowed and planning permission is granted for construction of a dropped kerb following demolition of front boundary wall and installation of an electric car charging point to front of house at [site address] in accordance with the terms of the application, Ref 21/01365/HOU, dated 19 August 2021, subject to the conditions in the Schedule to this decision.
Section 03
Main Issue
The main issue is the effect on the Stanwell Conservation Area.
Section 04
Reasons
The appeal property is a mid-terraced property on the west side of an island of green space including a war memorial surrounded by roads. The appeal property is set back from that to the north. The front garden is mostly laid to grass apart from a path to the front door. Apart from the gate, an approximately 0.85 metre high brick wall with slightly taller brick piers marks the front boundary.
The Conservation Area lies on either side of the [address]. The appeal site lies in the middle of the Conservation Area with [name] to the south. Opposite the appeal site the large, imposing properties are bounded to the street with high brick walls, but the western and southern portions are more open with low walls.
I have not been provided with a Conservation Area Appraisal or similar document to describe the special architectural or historic interest of the area and thus its significance. From my visit to the Conservation Area, it seems to me that it has a mixed character of large and smaller properties and is made up of residential and commercial uses. There did not appear to me to be any particular building style or character although buildings were generally two or three storeys in height and faced in brick and tiles. The war memorial green provides a focal point, but this was adversely affected by the car parking that was taking place around its perimeter. Therefore, for the purposes of this appeal, these mark the special qualities and thus significance of the Conservation Area.
The National Planning Policy Framework (the Framework) defines the significance of a heritage asset as the value of a heritage asset to this and future generations because of its heritage interest. The national Planning Practice Guidance also notes ([name]: 18a-006-20190723) that ‘significance’ derives not only from a heritage asset’s physical presence, but also from its setting.
Paragraph 199 of the Framework indicates that great weight should be given to the conservation of a heritage asset and this is irrespective of the level of harm that may occur. It is also emphasised that the more important the asset, the greater the weight should be. Paragraph 200 of the Framework indicates that any harm to the significance of a heritage asset, or from development within its setting, should require clear and convincing justification.
Paragraph 219 of the Framework indicates that existing policies in development plans should not be considered out-of-date simply because they were adopted prior to the publication of the Framework. But due weight should be given according to their degree of consistency with the Framework; the closer the policies in the plan the greater the weight that can be given.
The proposal is to demolish the majority of the boundary brick wall across the width of the property to provide a vehicular access way, the grassed area would be hard surfaced to allow parking and an electric vehicle charging point installed on the front of the dwelling.
Policy EN6 of the [name] and Policies Development Plan Document (2009) indicates that the Council will seek to preserve and enhance the character of conservation areas. This policy pre-dates the publication of the Framework and does not include any balancing considerations as set out in paragraphs 201 and 202 of the Framework. Therefore, it seems to me that Policy EN6 is not totally consistent with the policies of the Framework. As it has been agreed that the policies of the Framework provide an appropriate response to judging the effect on heritage assets, I give more weight to the policies of the Framework.
The loss of the existing boundary wall and provision of hardsurfacing of the front garden to facilitate parking would have a harmful detrimental effect on the character and appearance of the Conservation Area as it would increase the urban character. The relocation of the vehicle parking from on the street to on the front garden would have a neutral effect. Consequently, there would be some limited harm to the character and appearance, and thus significance, of the Conservation Area. In the terms of the Framework this harm, which should be judged against its effect on the whole of the Conservation Area, would represent less than substantial harm and would be at the lower end of such harm.
As such, in line with paragraph 202 of the Framework, this harm should be weighed against the public benefits of the proposal. In this case, the proposal would facilitate the provision of an electric vehicle charging point.
Both the Council and local residents have indicated that the property has a double garage to the rear. This is not shown as being within the ‘red line’ of the application site, and in any event, this is located some way from the property making its use less convenient for any occupier.
The Council has described the provision of charging of electric vehicles in such locations as the appeal site as “a future problem”; I disagree. The Government has made it clear that it wishes to encourage the use of electric vehicles and the provision of charging points for electric vehicles at dwellings is part of that. While the benefit of the proposal would primarily be private to the occupiers of the appeal property, it seems to me that there is also a public benefit from facilitating easy charging which would assist in the overall reduction in the number of vehicles using fossil fuels and would assist in improving air quality and reducing emissions, which are public policy aims.
In this case, given the very limited nature of the harm, even giving it special attention and great weight, the public benefits identified outweigh that harm.
Consequently, while the proposal would be contrary to Policy EN6 of the [name], and thus the development plan as a whole, there are material considerations that indicate a different decision to determining the appeal in accordance with the development plan.
Section 05
Conditions
I have considered the conditions put forward by the Council against the requirements of the national Planning Practice Guidance and the Framework. In addition to the standard timescale condition, I have imposed a condition specifying the relevant drawings as this provides certainty.
I have also imposed a condition requiring the provision of the electric charging vehicle point before the first use of the parking space because it is only with the public benefits of this that the development is acceptable.
In the interests of highway safety, I have also imposed two conditions relating to the provision of visibility splays and ensuring that the parking space is used for such purposes. I have also imposed a condition to require the materials to be agreed both to ensure harm to the character and appearance of the Conservation Area is minimised and to ensure that there is no increased risk of flooding as a result of an impermeable surface. This last condition is required as a pre-commencement condition as these matters need to be agreed before development commences. The appellant was given the opportunity to comment on this last condition but did not do so within the timeframe given.
Where necessary and in the interests of clarity and precision I have altered the conditions to better reflect the relevant guidance.
Section 06
Conclusion
For the reasons given above I conclude that the appeal should be allowed.
Section 07
SCHEDULE OF CONDITIONS
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: 202106.01 – Site Location Plan; 202106.02 - Existing & [name] and [name].
No development shall take place on site until details of the materials to be used have been submitted to and approved in writing by the local planning authority. The hard surface shall be made of porous materials or provision made to direct run-off water from the hard surface to a permeable or porous area or surface within the curtilage of the dwellinghouse. The development shall take place in accordance with the approved details.
The development hereby permitted shall not be used for the parking of vehicles until a fast charge socket with a minimum requirement of 7kW mode 3 with Type 2 connector (230v AC 32 Amp single phase dedicated supply) has been installed in accordance with the approved plans and commissioned and shall thereafter be retained.
The development hereby permitted shall not be used for the parking of vehicles until 2.0 metre by 2.0 metre visibility splays have been provided and these visibility splays shall be permanently kept clear of any obstruction over 0.6 metre high.
The development hereby permitted shall not be used for the parking of vehicles until the space has been laid out in accordance with the approved plans. Thereafter the area shall be used for the parking of vehicles and retained as such. End of Schedule
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1304No official casework-database value to compare
- Extracted decision date · page 1
- 22 March 2022Matches the official casework database
- Extracted site visit dates
- 21 February 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3288823
- Application reference
- 21/01365/HOU
- Lead case reference
- Not recorded
- Planning authority
- Spelthorne Borough Council
- Planning authority code
- E07000213
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 20 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 10 December 2021
- Valid date
- 10 December 2021
- Start date
- 29 December 2021
- Planning authority decision date
- 8 October 2021
- Appeal decision date
- 22 March 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 12749
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21