Appeal 3288943
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the retention of hip to gable, 2 No rear dormers & part single storey and part two storey side extension.
Section 02
Decision
The appeal is allowed and planning permission is granted for a hip to gable, 2 No rear dormers & part single storey and part two storey side extension at [site address] , Bushey, [postcode] in accordance with the terms of the application, Ref 21/0365/HSE, dated 16 February 2021, and the plans submitted with it, subject to the following condition:
Within three months of the date of this decision, the window inserted in the side facing elevation of the dormer over the rear outrigger must be— (i) obscure-glazed, and (ii) non-opening unless the parts of the window which can be opened are more than 1.7 metres above the floor of the room in which the window is installed.
Section 03
[name]
There are two main issues. Firstly, the effect of the flank window in the rear dormer over the outrigger on the living conditions of occupiers of [address] with respect to overlooking and privacy; and secondly, the effect of the rear dormer over the outrigger on the character and appearance of the host dwelling and the surrounding area.
Section 04
Background
The appeal dwelling has a long planning history which is relevant to the consideration of the appeal. Briefly, Lawful Development Certificates (LDCs) were granted for a single storey side extension and a hip to gable extension with rear dormer. Planning permission was then granted for a two storey side extension and a similar hip to gable extension with rear dormer. A further application was submitted for the approved scheme but with the addition of a dormer over the two storey rear outrigger. The Council advised that this would not be supported on visual grounds because the combination of the dormers would appear bulky and take up more than 60% of the roof face, contrary to the Council’ s Planning and [name], [name]: Guidelines for [name] and Alterations, 2006.
However, the Council’s officers suggested to the appellants that an application for an LDC could be submitted for the dormer over the outrigger but that if approved it would need to be constructed prior to the construction of the approved main dormer in order to remain permitted development. An application for an LDC for the dormer over the outrigger was duly made.
Before the LDC was issued, a site visit was carried out which ascertained that the planning permission for the hip to gable extension and main dormer had been implemented and the development was near completion. Moreover, the dormer on the outrigger had been commenced. The LDC was therefore refused because the overall enlargement of the roof space would exceed the 50 cubic metres allowed under permitted development rights.
The application now being appealed was then submitted to regularise the development as built. The Council did not object to minor changes to the previously permitted two storey side extension, hip to gable extension or rear dormer. However, the dormer on the outrigger was deemed unacceptable and the application was refused.
Section 05
Reasons
The appeal dwelling is a traditional, semi-detached house. It is situated at one end of [address] which is a no through road but provides access to [address], a cul-de-sac of newer dwellings. The appeal property lies adjacent to [address]. Although there is a wide gap between the outrigger at the appeal dwelling and the shared boundary with No 7 the extensions, and in particular the dormer on the outrigger, are visible from the garden of No 7, including from the patio area immediately behind the dwelling.
The dormer has a side facing window which is clear glazed and opening. This window directly overlooks the garden and patio at No 7 and has oblique views towards rear windows in that dwelling. This overlooking and the consequent loss of privacy at No 7 materially detracts from the living conditions of occupiers and conflicts with the National Planning Policy Framework (NPPF) and the Council’s Draft Planning and [name], [name]: Guidelines for High Quality Sustainable Development, 2016, which, taken together, expect new development to create places with a high standard of amenity for existing and future users including, amongst other things, ensuring adequate privacy in residential buildings and gardens.
The appellants make clear that they would be willing to accept a condition requiring either the window to be obscure glazed and non-opening or to be relocated to the rear facing elevation of the dormer in order to overcome the issue of overlooking. 2
I do not consider that the re-location of the window could be required through a condition because a new location could introduce different impacts which have not been considered and in any case no design has been proposed.
Had the dormer been built under permitted development it would have been subject to condition B.2(c) of the Town and Country Planning (General Permitted Development) Order 2015, Schedule 2, Part 1, Class B which requires side facing windows to be obscure glazed and non-opening below 1.7m above the floor of the room in which the window is installed. Subject to an amended wording to take into account that the window is in situ, I consider that a similar condition would overcome the overlooking of and loss of privacy to No 7. Although the window serves a small bedroom, currently used as a study, I am further satisfied that the loss of outlook from this room, taken in the context of the dwelling as a whole, would not be materially detrimental to the living conditions of occupiers.
It is concluded on the first main issue that, subject to a planning condition as reasoned above, the flank window in the rear dormer over the outrigger would have no materially detrimental effect on the living conditions of occupiers of [address] with respect to overlooking and privacy. In consequence, it would comply with Policy CS22 of the [name] (CS), adopted 2013, Policy SADM30 of the Site Allocations and Development Management Policies Plan (SADMPP), adopted 2016, the NPPF and the Council’s Planning and [name] insofar as they seek to preserve living conditions. This is expected to be achieved through ensuring that new development is designed to have a limited impact, so as to protect the amenity of occupiers and ensure adequate privacy for neighbours.
Turning to character and appearance, the unauthorised dormer over the outrigger is a large and bulky structure which, if allowed to remain, would through its scale and size dominate and detract from the roof slope of the outrigger and the appearance of the host dwelling. Nevertheless, it is substantially hidden from the street and, owing to its position in relation to surrounding dwellings, is seen obliquely and at a distance from windows in nearby properties. It is lower than the dormer on the main roof slope and although joined to it this limits its impact and provides a degree of separation. It is constructed to a high standard and in matching materials which further limits its effect. It would be seen most clearly from the garden at No 7 but the separation distance would ensure it was not overbearing.
Overall, I consider that the dormer over the rear outrigger would not meet the high standards of design expected of new development by the development plan or the NPPF. Nevertheless, the consequences of this shortfall are largely restricted to the host building and have a limited effect on the surrounding area with respect to character and appearance or visual amenity.
It is concluded on the second main issue that the dormer over the outrigger would have a detrimental effect on the character and appearance of the host dwelling and the surrounding area which would conflict with Policy CS22 of the CS, Policy SADM30 of the SADMPP, the NPPF and the Council’s Design Guide which, taken together, seek to ensure that new development achieves a high quality of design that is visually attractive, sympathises with local character and respects, enhances or improves the visual amenity of the area. 3
The presumption in favour of sustainable development set out in the NPPF makes clear that where a planning application conflicts with an up-to-date development plan, permission should not usually be granted. Decisions that depart from an up-to-date development plan may be made, but only if material considerations in a particular case indicate that the plan should not be followed.
I have therefore considered whether any other material considerations apply in this case. Firstly, it is clear that there is no realistic fallback in terms of permitted development rights since this would involve substantial demolition of not just the disputed dormer but, in addition, the permitted dormer and possibly the hip to gable extension prior to any rebuilding. There is little real prospect of this. 18.Nevertheless, it is clear from the evidence that it was the Council who advised the appellants that a dormer on the outrigger, similar to the one constructed, could be achieved through permitted development. Moreover, the appellants made the necessary application for an LDC and are understood to have been advised by the Council that a decision granting an LDC was imminent. This, together with the other planning history, convinces me that it was not the appellants’ intention to construct an extension that was unauthorised. On the contrary, they appear to have entered into constructive dialogue with the Council and followed the advice they were given. Their error was in failing to understand the importance of the sequence of the construction of the various elements. This resulted in the outrigger dormer falling outside the compass of the permitted development rights. 19.Whilst it is a developer’s responsibility to understand what is required, I find that, although finely balanced, the particular circumstances of this case, weighed against the limited harm identified, would amount to the material planning considerations necessary to indicate that the development plan should not be followed and the appeal should be allowed.
The Council does not suggest any conditions and I agree that as the development has been completed none is necessary, apart from the condition requiring the side facing window in the dormer over the outrigger to be obscure glazed and non-openable, so as to make the development acceptable in planning terms. A strict timetable for compliance with this condition is necessary because as permission is being granted retrospectively it is not possible to use a negatively worded condition to secure the implementation of the obscure glazed, non-opening window before the development is first occupied. I consider that a period of 3 months would be reasonable for compliance. The condition will ensure that the existing window can be enforced against if the requirements are not met. 21.For the reasons set out above and having regard to all other matters raised, including third party concerns regarding loss of light to a utility room, I conclude that the appeal should be allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2972No official casework-database value to compare
- Extracted decision date · page 1
- 21 February 2022Matches the official casework database
- Extracted site visit dates
- 8 February 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3288943
- Application reference
- 21/0365/HSE
- Lead case reference
- Not recorded
- Planning authority
- Hertsmere Borough Council
- Planning authority code
- E07000098
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 135 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 13 December 2021
- Valid date
- 13 December 2021
- Start date
- 30 December 2021
- Planning authority decision date
- 21 September 2021
- Appeal decision date
- 21 February 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 10973
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:25
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21