Appeal 3288974
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the “demolition of existing low level boundary wall being replaced with 725mm high brick wall with 1500mm high piers at regular intervals infilled with metal railings”.
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The main issue in the appeal is the effect of the proposal on the free flow of traffic and highway safety for pedestrians and other road users.
Section 04
Reasons
The appeal site is a two storey semi-detached dwelling located close to a roundabout that serves [address], [address] and [address]. It is situated between [address] and [address]. It has off-road parking for about 3 vehicles, the entrance for which is via [address], about 20-25m from the roundabout entrance. The off-road parking is facilitated by an existing crossover with dropped curb. There are double yellow lines on [address] outside the appeal site along with a pedestrian footpath.
The proposal would include a remote-controlled sliding electronic gate about 6.5m wide and a wall with intermittent piers (about 1.5m high) and metal railings in between. No alterations to the crossover/dropped curb would be made.
Policy G18 of the Bexley Council Unitary Development Plan`UDP` indicates that the Council will manage the borough’s network of roads according to their function in the hierarchy of roads. In that hierarchy [address] is a [address] which facilities through traffic movements and links to strategic roads. It is a busy highway and bus route. Vehicles often queue back from the roundabout entrance by a significant distance which includes the highway in front of the appeal property.
Although there is a crossover which is used for vehicular access and egress to and from the appeal site, the remote control electronic sliding gate would introduce an additional barrier which has to open when accessing the site. The appellant indicates that the gate takes about 15 seconds to open and can be triggered remotely from inside the approaching vehicle. I have borne this in mind but nevertheless I consider that the proposed development would cause an additional material cause of delay which would prejudice the free flow of traffic on the Lane and potentially interfere with highway safety. Furthermore, a vehicle accessing or leaving the appeal site, depending on road congestion, may have to wait on or partly over the pedestrian footway which would cause a safety hazard.
The appellant has referred to the existence of permitted development rights under the Town and Country Planning (General Permitted Development) Order 2015 which would allow a gate to be erected at the same or a similar location without the need for express planning permission. However, such a gate could not exceed 1 metre in height from ground level. There has to be a realistic prospect of that fallback development under PD rights taking place and on the evidence before me I am not convinced that it would. I am not persuaded that, if the appeal was dismissed, a PD-compliant scheme incorporating a 1m vehicular gate would be erected at the appeal site.
I have borne in mind the added security that the proposal would bring to the occupiers of the dwelling and the policy support for deterring crime. However, those factors do not outweigh the harm I have identified above.
I conclude therefore that the proposal would unduly harm the free flow of traffic and highway safety. It would be contrary to policy G18 of the UDP (adopted 2004) and contrary to policy CS15 of the London Borough of [name] 2012.
Section 05
Conclusion
Having taken into account all representations made, for the reasons given above, I dismiss the appeal. [name].C.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 98No official casework-database value to compare
- Extracted decision date · page 1
- 11 March 2022Matches the official casework database
- Extracted site visit dates
- 1 February 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3288974
- Application reference
- 21/01778/FUL
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Bexley
- Planning authority code
- E09000004
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 14 December 2021
- Valid date
- 23 December 2021
- Start date
- 6 January 2022
- Planning authority decision date
- 30 September 2021
- Appeal decision date
- 11 March 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 12191
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21