Appeal 3289791
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as ‘Demolish a poor quality extension at the rear and build a new two-storey rear extension, a new dormer extension, and a small bike store at the front of the property. Replace the existing timber sash windows with new double glazed units, removing the uncharacteristic red paint from the brickwork at the front of the property, new landscaping to the front and rear garden, including removing existing front garden wall and gates and building a new garden wall with new entrance gate at the front of the property.’
Section 02
Decision
The appeal is dismissed insofar as it relates to the rear extension and the dormer roof extension. The appeal is allowed and planning permission is granted for the insertion of rooflights in the front roofslope, the removal of paint, the replacement of existing windows and the changes to the front garden landscaping at [site address] in accordance with the terms of the application Ref 2021/2283, dated 22 July 2021 subject to the conditions in the schedule attached to this decision.
Section 03
Main issues
The main issues in this appeal are the effect of the proposed development on:- • the character and appearance of the dwelling and the [address] and Mapledene Conservation Area (CA); • the living conditions of neighbouring occupiers with regard to outlook.
Section 04
Character and appearance
The development plan includes policy LP1 of the Hackney Local Plan 2033 (2020) which seeks to ensure that all development is of the highest quality and policy LP3 which seeks to ensure that development preserves or enhances the character and appearance of Conservation Areas.
The appeal dwelling is a three storey mid terraced, Victorian house of a similar design to others on this side of [site address] and like those, is set back from the road behind a front garden with steps leading up to the front door. The uniformity of proportion, scale and detail of the front elevations of these dwellings contributes strongly to the character and appearance of the CA. On the rear elevation, whilst some of the dwellings have had alterations at ground floor level and to their roofs, at upper ground and first floor levels they retain a strong degree of uniformity which contributes positively to the CA.
As the proposed rear dormer would occupy most of the width of the roof on the rear elevation and would be only slightly set down from the ridge, it would not accord with the Council’s guidance in its ‘[name] and Alterations’ Supplementary Planning Document (2009) (SPD). It would be unduly bulky and disproportionate to the scale of the dwelling. Although there are a few other dwellings in the terrace that have rear roof dormers, those are generally significantly smaller than that proposed here. No 14 has a large side dormer and in the terrace to the rear, on [address], there are some large dormers but I am unaware of the planning status of those. 52 [site address] has a large, approved dormer but that is in a separate terrace and is not seen within the context of the appeal dwelling. Those examples do not, therefore set a precedent for an exception to the Council’s SPD in this case. The proposed dormer would significantly disrupt the largely unbroken and uniform roofscape of the dwelling and the terrace.
An existing flat roofed extension at lower ground floor level across the width of the rear elevation, would be demolished and replaced with a contemporary style extension. Set back from that, a smaller flat roofed extension is also proposed at upper ground floor level. The height of the lower ground floor element, which includes a glazed ‘clerestory’ element would obscure part of an original upper ground floor window opening and would result in an overly bulky extension. The upper ground floor extension would involve the removal of another original window opening and the proposed flat roof design and timber panel would be uncharacteristic of the rear elevation at upper ground floor level of the dwelling and the terrace, detracting from its uniformity. [name] noted a timber structure at first floor level on another dwelling, I have not been told of any approvals in the terrace for such extensions and that does not provide justification for this proposal.
I conclude then that the proposed dormer and rear extension would fail to preserve the character and appearance of the CA, contrary to development plan policies LP1 and LP3. Whilst the harm to the CA would be less than substantial, the public benefit cited by the appellant of improving the appearance of the house, together with the private benefit of additional space and an improved layout, could be achieved through a more appropriate extension and are insufficient to outweigh the wider harm that would be caused by this proposal.
The proposal also includes a new front garden wall, entrance gates, landscaping and bike and refuse storage. Front gardens on this side of the street are varied. The appeal dwelling has an existing vehicular access, hard paving and railings alongside the steps. Although some of the other dwellings in the street also have railings, it seems to me that they would not have been an original feature of this terrace. However, as the proposed railings would replace the existing modern style railings, they would represent an improvement to the property. The proposed bike store would be set at lower ground floor level and would not be clearly seen from the street, with its planted roof providing some enhancement.
I conclude that the proposed garden alterations would not harm the character and appearance of the dwelling and would preserve and enhance the character and appearance of the CA, in accordance with development plan policies LP1 and LP3. As suggested in the Council’s officer’s report, a condition for full details of the hard and soft landscaping works, including the provision of permeable paving and details of the railings, is necessary in the to ensure satisfactory drainage and in the interests of the CA.
The Council has raised no objection to the front roof lights, the removal of paint from the front elevation or the proposed window replacements and I am satisfied that those parts of the proposal are also acceptable. As suggested in the Council’s officer’s report, a condition requiring details of the methodology for undertaking paint removal, including a sample panel, is necessary to ensure that the underlying brickwork is not damaged. A condition requiring details of windows, also suggested in the Council’s officer’s report, is necessary in the interests of the CA.
Section 05
Living conditions
As the proposed lower ground floor extension would not project significantly beyond the neighbouring extensions and the proposed first floor extension would be very modest in its projection and would be set some 1m from the nearest neighbouring window, the extension would not result in a significant loss of outlook when seen from neighbouring windows. As such, the living conditions of neighbouring occupiers would not be significantly harmed and the proposal would accord in this respect with development plan policy LP2 which seeks to ensure that developments do not result in significant adverse impacts for neighbouring occupiers.
Section 06
Conditions
In addition to the conditions referred to above, together with the standard commencement condition, a condition is necessary requiring that the development is carried out in accordance with the approved plans insofar as they relate to the approved parts of the proposal, in order to provide certainty.
Section 07
Conclusion
For the reasons stated above, I shall issue a split decision. The appeal should be dismissed insofar as it relates to the dormer window and the rear extension. The appeal should be allowed insofar as it relates to the garden alterations, the front roof lights, the removal of paint from the front elevation and the replacement windows.
Section 08
Schedule of conditions
The development hereby permitted shall begin not later than three years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans insofar as they relate to the approved elements only: GA000; GA200; GA201; GA202; GA203; GA204; GA205; GA207; GA208; GA209; GA211; GA212; Design, Access and Heritage Statement.
The gardens alterations hereby authorised shall not commence until details of both hard and soft landscape works have been submitted to and approved in writing by the local planning authority. Those details shall include:- detailed drawings for the railings, boundary wall and gates, together with proposed materials; planting plans for soft landscaped areas; hard surfacing materials, including the provision of permeable paving; details of materials for the bike/refuse storage unit. The landscaping works shall be carried out in accordance with the approved details in accordance with an agreed implementation programme. The completed scheme shall be maintained in accordance with the approved details.
The paint removal hereby authorised shall not commence until details of the methodology for undertaking paint removal, including a sample panel, have been submitted to and approved in writing by the local planning authority. Development shall be carried out in accordance with the approved details and sample.
The window replacements hereby authorised shall not commence until details of the replacement windows, including drawings at a scale of 1:20, have been submitted to and approved in writing by the local planning authority. Development shall be carried out in accordance with the approved details. End of conditions.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 227No official casework-database value to compare
- Extracted decision date · page 1
- 7 March 2022Matches the official casework database
- Extracted site visit dates
- 9 February 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3289791
- Application reference
- 2021/2283
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Hackney
- Planning authority code
- E09000012
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 30 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Split Decision
- Decision category
- Split decision
- Received date
- 23 December 2021
- Valid date
- 23 December 2021
- Start date
- 12 January 2022
- Planning authority decision date
- 1 October 2021
- Appeal decision date
- 7 March 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 11843
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21