Appeal 3290296

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

amendment to planning permission 2018/0522 to include alterations to 2 South facing bay windows.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    At the time of my visit, I saw works and demolition had taken place at the site. However, as I cannot be sure these related to the scheme before me, I have assessed it as a proposed development on the basis of the plans before me.

    I have taken the description of development from the application form. Although different to that on the decision notice, no confirmation that a change was agreed has been provided.

    Planning permission was granted1 for extensions and alterations to convert existing single-storey house into two-storey house following partial demolition of existing house. The principal difference from that to the scheme before me is the introduction of 2 additional bay windows to the south elevation. While the whole scheme is part of the appeal before me and therefore to be determined, the earlier permission provides a fallback position. Consequently, I have focussed my attention on the additional elements.

  3. Section 04

    Main Issue

    The main issue of the appeal is the effect of the proposed development on the character and appearance of the area.

  4. Section 05

    Reasons

    [address] is characterised by residential houses of varied design and scale and includes an array of building styles. Nonetheless, I did not see any similarly proportioned front elevation projections or bay window features that extended the full height of the property. 1 2018/0522

    Plans of the building prior to the works being undertaken and approved schemes at the site retained the single storey appearance of the building. First floor accommodation was contained within the roof space using relatively discrete dormers that sit comfortably in the roof, set up from the eaves, and down from the main ridge height. The roofscape and single storey appearance are the only features prominent in the streetscene despite the building being closer to the road than many nearby.

    While the footprint increase would be small, the proposed 2-storey bay window would break the eaves of the main roof. In addition, it would extend the full height of the property, above the dormer windows on the same elevation and would be of a full 2-storey appearance. This would be discordant and jar with the predominately single storey proportions of the property. Although not extending forward of the building line, the 2-storey bay would be the most prominent feature at the property from the street given its height and position.

    The eaves of the additional single storey bay window would align with the main roof and be smaller than the one on the west facing elevation. It would assimilate into the property, be low level and unassuming.

    Nevertheless, the proposed development would unacceptably harm the character and appearance of the area. It would be contrary to the design and character protection aims of Policies CS4 and CS17 of the [name], Policy DM2 of the Elmbridge Local Plan Development Management Plan and the SPD2. It would also fail to accord with the National Planning Policy Framework where it seeks to ensure developments are sympathetic to local character.

  5. Section 06

    Other Matters

    Even if I were to agree with the appellant that there was no harm from the scheme to other issues, this would be a neutral factor and not weigh in favour of the proposal. The previous permission represents a fallback position. However, as this would not have the same 2-storey bay window, it would not result in the same harm as the scheme before me and is not a reason to allow the appeal.

  6. Section 07

    Conclusion

    The proposal conflicts with the development plan when considered as a whole and there are no material considerations, either individually or in combination, that outweighs the identified harm and associated development plan conflict.

    Therefore, for the reasons given above, I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 151No official casework-database value to compare
    Extracted decision date · page 1
    10 February 2022Matches the official casework database
    Extracted site visit dates
    7 February 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3290296
Application reference
2021/2340
Lead case reference
Not recorded
Planning authority
Elmbridge Borough Council
Planning authority code
E07000207

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
4 m²
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
7 January 2022
Valid date
7 January 2022
Start date
13 January 2022
Planning authority decision date
29 October 2021
Appeal decision date
10 February 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
10417
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:25
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21