Skip to main content
Official casework recordDismissedCurrent release

Appeal 3290812

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

No verified development description has been extracted from an official decision PDF yet.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main issue

    The main issue is the effect of the development on the character and appearance of the surrounding area.

  3. Section 04

    Reasons

    The appeal site lies in the countryside, and is of a rectangular shape, being part of a former large field since subdivided into plots or enclosures. The hedge which once grew on the field’s lengthy highway frontage has been ripped up and removed in its entirety, although some tree stumps are still apparent in the ground.

    A timber rail fence has been constructed along the frontage, and this is punctuated by several accesses onto the highway, including the one subject of this appeal. The fence is separated from the highway by a newly formed green sward, and the embryo of a replacement hedge is evident alongside the fence.

    Contrary to the indication given in the application form the works of forming the access have commenced. The appellant, in effect, seeks retrospective permission for the formation of the access onto the classified B road, and for the creation of a vehicular crossover in permanent materials.

    I have noted the references to the planning history of the adjoining land, including a recently dismissed appeal.1 This indicates to me that various consents have been sought for the development of the larger field in piecemeal 1 APP/L3815/W/20/3261808 dated 28 April 2021. fashion, but no permissions, as I understand it, have been forthcoming. This piecemeal approach is continued with this appeal which in effect asks me to consider the development in isolation from the use and development of the larger field.

    I noted during my visit that several plots or enclosures have been formed by the use of fencing of a type more usually seen as means of enclosures on suburban residential estates. I saw too that at least two caravans were sited on the larger field. As already mentioned, several accesses onto the B road are evident.

    The works as a whole have given rise to significant alterations to the previously pleasant rural scene and to my mind constitutes a visual intrusion. The works subject of this appeal have contributed in part to the harmful changes in the local scene.

    I therefore conclude that the development has and would contribute to a significant and harmful erosion of the rural qualities of its surroundings. Accordingly, a clear conflict arises with those provisions of policies 45 & 48 of the Chichester Local Plan which seek, amongst other things, to ensure that development proposals respect the local landscape character and do not result in an adverse impact on the tranquil and rural character of the area.

  4. Section 05

    Other matters

    I note that the Highway Authority did not object since the submission of a revised plan satisfied it that lateral visibilities were acceptable. However, I see no signs that the issue of multiple accesses onto a busy road had been considered. I describe the road as busy on the basis of what I saw during my site visit, which was conducted during the morning rush hour. Although not forming a reason for refusal, the consideration of this particular access point in isolation represents a symptom of the consequences of what I consider to be unacceptable piecemeal development.

    The permission sought is for operational development and not in respect of the change of use of the land. I note the Council’s concerns and comments as to the proposed use, but in the absence of any further detailed information on useage, I make no comment on this aspect.

    I have taken account of all other matters raised in the representations including the views of the Parish Council, who call for a more comprehensive approach to be adopted to development proposals affecting the larger field. The Council’s views are broadly consistent with mine. No other matter raised outweighs those considerations which led me to my conclusions.

  5. Section 06

    Conclusion

    For the reasons set out above, the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 2949No official casework-database value to compare
    Extracted decision date · page 1
    30 June 2022Matches the official casework database
    Extracted site visit dates
    7 June 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3290812
Application reference
EWB/21/03279/FUL
Lead case reference
Not recorded
Planning authority
Chichester District Council
Planning authority code
E07000225

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Other minor developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0.405 hectares
Floor space
24 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
16 January 2022
Valid date
24 February 2022
Start date
8 March 2022
Planning authority decision date
14 January 2022
Appeal decision date
30 June 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
17138
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21