Appeal 3291288
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
10 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as “Two storey rear extension, first floor extension over living room and raising of roof”.
Section 02
Decision
The appeal is dismissed.
Section 03
Appeal Procedure
The site visit was undertaken by an Appeal Planning Officer whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
[name]
The main issues are: • whether the proposal would be inappropriate in the Green Belt for the purposes of the development plan and the National Planning Policy Framework (2021) (the Framework); • the effect of the proposal on the openness of the Green Belt; • the effect of the proposal on biodiversity; and • if the proposal would be inappropriate development, whether the harm by reason of inappropriateness, and any other harm, is clearly outweighed by other considerations so as to amount to the very special circumstances necessary to justify it;
Section 05
Inappropriate Development
Paragraph 147 of the Framework states that inappropriate development is, by definition, harmful to the Green Belt and should not be approved except in very special circumstances. Paragraph 149 states that the construction of new buildings should be regarded as inappropriate in the Green Belt, with the exception of, among other things, the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building. The Framework defines ‘original building’ as the building as it existed on 1 July 1948 or, if constructed after this date, as it was built originally. Policies GB2 and GB13 of the Chiltern District Local Plan (the Local Plan) and the [name] and Householder Development Supplementary Planning Document (SPD) are consistent with the policy provided in the Framework. Policy GB13 also requires extensions to be subordinate to the size and scale of the original dwelling.
The property is a modest dwelling consisting of a ground-floor, and a first-floor habitable space in the roof. The site is located on [address], set behind fencing and vegetation, in an area where buildings are generally few and far between. The property has been extended in the past, and according to the Council, this has amounted to a 300% increase in the floor area from the original building. The Council also suggests that these extensions in combination with the current proposal would equate to a 450% total increase. The appellant has not disputed these figures. There is no strict definition provided in the Framework or local policy for what constitutes a disproportionate addition. However, the two-storey extension to the rear, the first-floor extension, and the raising of the roof would nevertheless significantly increase the size of the property in visual terms, and with regard to the overall floor space, far beyond the original building.
The proposal, in combination with the previous extensions, would represent disproportionate additions over and above the size of the original building, and would fail to appear subordinate to the size and scale of the original dwelling. Accordingly, the development would result in harm to the Green Belt. Paragraph 148 of The Framework instructs that substantial weight should be given to any harm to the Green Belt, and that ‘very special circumstances’ will not exist unless the potential harm to the Green Belt by reason of inappropriateness, and any other harm resulting from the proposal, is clearly outweighed by other considerations.
Section 06
Openness
The front of the property is adjacent to the road, and together with the southern side, is generally enclosed by vegetation. The area to the rear of the site is much more spacious, and open fields spread out to the northeast. Although the development would be largely obscured from public views, and the rear extension would occupy an area of existing hard surfacing, in extending the property as proposed, the development would invariably have an effect on the openness of the Green Belt. However, despite representing a significant addition to the property from what it was originally, the effect on openness would be limited, given the scale of the development relative to the surrounding area.
Although the harm would be limited, the proposal would nevertheless be detrimental to the openness of the Green Belt.
Section 07
Biodiversity
It is important that proposals likely to affect biodiversity contain adequate information to effectively evaluate the impacts. Policy CS24 of the [name] for Chiltern District (November 2011) (the [name]) seeks to ensure ecological interests are safeguarded and that biodiversity is protected. The Council have indicated that the site is within an area likely to contain bats. As it is currently unclear whether or not bats would be affected by the works proposed to the roof, a survey providing further information would be necessary. It is not necessary for local policy to specifically require surveys for them to be appropriate in certain instances. A survey would be required to ascertain whether certain methods of mitigation would be appropriate, and the installation of bat or bird boxes would not therefore effectively secure the conservation or enhancement of biodiversity with the information currently provided.
For these reasons, the proposal would fail to ensure biodiversity is conserved. It would therefore be contrary to Policy CS24 of the [name]. It would also fail to align with the Framework and its aim to minimise impacts on biodiversity.
Section 08
[name]
The proposal would provide a more usable space within the property by improving the layout, and would better serve the appellant’s family and the particular needs of their child. Careful consideration has been given to these circumstances, however, given that they are largely personal benefits they hold limited weight. The development would also offer some visual improvements to the property as a whole. However, these improvements would be minor, and are therefore given limited weight. The repairs required to the property could be achieved by means other than the proposal.
The Council have not found harm with respect to the character and appearance of the area, and there is no reason to suggest a different view should be reached in this appeal. Policy CS20 of the [name] for Chiltern District (November 2011) largely pertains to the design of development and is not therefore directly relevant to the issues that have been identified.
Section 09
Conclusion and Recommendation
The proposal would be inappropriate development in the Green Belt and would be detrimental to openness. It would also fail to ensure biodiversity is conserved. It would therefore conflict with the Framework, and the aims of Policies GB2 and GB13 of the Local Plan, Policy CS24 of the [name], and the SPD. The other considerations do not clearly outweigh these harms, and the very special circumstances necessary to justify the development do not therefore exist. Based on the above, and having regard to all matters raised, I recommend that the appeal should be dismissed.
Section 10
Inspector’s Decision
I have considered all the submitted evidence and the Appeal Planning Officer’s report and on that basis the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 859No official casework-database value to compare
- Extracted decision date · page 1
- 14 July 2022Matches the official casework database
- Extracted site visit dates
- 17 May 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3291288
- Application reference
- PL/21/3917/FA
- Lead case reference
- Not recorded
- Planning authority
- Buckinghamshire Council - Chiltern Area *
- Planning authority code
- E07000005
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 105 m²
- Number of residences
- 0
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 24 January 2022
- Valid date
- 24 January 2022
- Start date
- 23 March 2022
- Planning authority decision date
- 1 December 2021
- Appeal decision date
- 14 July 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 17783
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21