Appeal 3291476
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as ‘to create a ground floor front and rear extension, to convert existing roof into habitable rooms with front and rear small balcony areas. To create a connected home studio for Yoga and fitness in the garden’.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
The Council requested that I enter No 81 and No [address] to judge the proposed development. The occupiers were notified of my site visit. I was able to enter No 81 but there was no-one in at No 85. I saw the outside of No 85 and its rear garden from the appeal site and [address].
Section 04
[name]
The main issues are the effect of the proposed development on: • the character and appearance of the appeal property and the area; and • the living conditions of the existing occupiers of No 81 and No [address], having particular regard to outlook.
Section 05
Character and appearance
The appeal property is a modest sized detached bungalow in a mainly residential area which has a variety of dwelling types and sizes. In this particular section of [address] it is one of a row of five similar, closely spaced bungalows. These are traditional in design, with brick or render elevations and tiled roofs, and are broadly comparable in overall size, scale and massing — in particular, low eaves levels and shallow pitched hipped and gabled main roofs. The appeal property is locally distinctive, as is this group of bungalows.
The proposed alterations and extensions include upwards with a first floor partly in a new roof and an internally linked rear garden outbuilding. The external appearance would have a modern contemporary form of architecture and materials, including render, vertical timber cladding, metal framed fenestration, balconies with glass balustrades and standing seam monopitch roofs. To all intents and purposes it would be a completely new dwelling.
The enlargement of the floor plan would not alter the general building line of the dwelling in relation to the siting and alignment of the adjoining bungalows, some having been extended at ground floor level. The footprint and ground floor level would be no wider than the appeal property.
However, despite the asymmetric roof, the dwelling would be significantly taller to eaves and ridge levels, including along all of one side and most of the other side. The first floor part would stretch across the entire width of the dwelling and in-depth on the plot from front to back at this higher level. As a result, it would be substantially larger than the appeal property in size, scale and massing. Moreover, the design and materials would be a radical departure from the appearance of the appeal property. The dwelling would not, therefore, respect important features of the appeal property or retain any semblance of it.
The dwelling would protrude overtly above the remaining four bungalows and significantly diminish the gaps and spaces immediately either side of it at roof level. The resulting cramped and overly dominant juxtaposition would not be comparable to the limited impact of the small individual side dormer windows at No 79. It would also abruptly interrupt the sequence of built form in these bungalows along [address], especially at roof level.
The front of the dwelling would be relatively close to the back edge of the pavement and the front garden is open plan. Adjoining front gardens have mostly low level planting or boundary features. The dwelling would, therefore, be unduly prominent and intrusive in public views in either direction along [address]. It would stand out in stark contrast to the bungalows and have a significant negative impact on this streetscene in these regards.
In the absence of any firm evidence, the dwelling at No [address] was either built as a large chalet bungalow or to match the appeal property and significantly altered by extensions, including to the roof. It is, though, traditional in appearance and materials with low eaves levels and gabled and hipped roofs. It is at one end of the row of bungalows and has more in common, in terms of scale and massing, with the large bungalow in the plot next to it on the corner of [address] and [address], rather than as a continuation of the row of five smaller bungalows.
There are some dwellings elsewhere in [address] and in the wider area that are originally designed, or have been altered, with a modern contemporary form of architecture and materials, including those that I have been referred to. However, none of these have any meaningful visual or spatial relationship to the appeal site. Most are also viewed in the context of adjoining houses, not bungalows, and some have a sea front aspect. While those areas may be in transition towards a more contemporary form of architecture, this particular part of [address] is not to any significant degree.
While the external alterations recently made to No [address] include white render, metal frame windows and horizontal painted cladding in front gables, these changes are not incompatible or inconsistent with, for instance, the rendered elevations at No 81. Nor do they change the essence of its single storey form and as such it remains in keeping in these respects with the other four bungalows, including the appeal property. The block of flats behind the appeal site is set well back from the appeal property and albeit that it would be taller and bulkier than the dwelling, the upper floor and roof form recedes in views from [address]. There is, therefore, no strong basis for the proposed design innovation and it would not be appropriate in this particular case.
Considering the above, I find that the proposed development would harm the character and appearance of the appeal property and the area. Accordingly, it would not comply with saved Policy HE2 of the Christchurch and East Dorset Local Plan Part 1 [name] 2014 (the CS) or saved Policy H12 of the Borough of Christchurch Local Plan 2001 (the LP). These policies include that development should be compatible with its surroundings and the immediate locality in architectural style, design, scale, bulk, height, materials, visual impact and relationship to nearby properties.
It would also conflict with objectives of the National Planning Policy Framework (the Framework) to achieve well-designed places with development that is sympathetic to local character, including the surrounding built environment, and maintains a strong sense of place with building types and materials that create distinctive places to live (paragraphs 130 c) and d)). Living conditions No [address]
A side kitchen window faces the appeal property which at this point has a flat roof, with the pitched roof behind sloping away from No 81. This allows an appreciable view from this window over or past the appeal property towards its open rear garden or upwards of the sky. Although the facing side elevation of the dwelling would be no closer to No 81, it would be significantly longer at the rear and taller to eaves and ridge than the appeal property. The substantial expanse of additional built form in such close proximity would unduly restrict views from this habitable room window.
Despite the inset arrangement of the tallest part of the dwelling in relation to No 81, its significantly greater overall height, scale and massing in the side and rear elevations, and its projection in depth past the rear elevation of No 81, would come to a corner point immediately next to part of the rear garden of No
Although this garden is reasonably large, the dwelling would nonetheless have a looming visual and spatial presence. This would have an unduly overbearing effect and detract from the use of the rear garden of No 81. No [address]
A double pane side window faces the appeal property. I have not been informed about the use of this room and was not able to determine this, but there was no apparent evidence that it is not a habitable room. On this basis, while the side of the dwelling would be no closer to this window than the appeal property, and there would be a wider separation distance to the dwelling (than in relation to No 81), the substantial expanse of taller and longer side elevation in such close proximity would nonetheless unduly restrict upward views from this window.
The rear elevation of the dwelling would be aligned with the rear elevation of No 85. However, the increased height, scale and massing of this closest corner part would be observed from the much lower rear garden level of No 85. This closest corner of the dwelling would, therefore, also have a looming visual and spatial presence. This too would have an unduly overbearing effect and detract from the use of the smaller rear garden of No 85.
In addition, the facing side elevation of the link to the outbuilding, and this building, would be significantly taller than a usual 1.8m or 2m boundary fence or wall. It would be at this height along the entire rear garden boundary with No 85. This would have a significant overbearing effect. It would, therefore, detract from the use of the rear garden of No 85 and also restrict upward views from the nearest rear facing patio doors to a habitable room.
Considering the above, I find that the proposed development would harm the living conditions of the existing occupiers of No 81 and No [address], having particular regard to outlook. Accordingly, it would not comply with CS Policy HE2 or LP Policy H12. These policies include that development should be compatible in its relationship to nearby properties and minimise disturbance to the amenity of existing occupiers. It would also conflict with aims of the Framework to create places with a high standard of amenity for existing users (paragraph 130 f)).
Section 06
Other Matters
[address], its gates and piers are a [name] listed building (the LB). While the LB has a visual presence in [address], the setting in the direction of the appeal site has been significantly eroded by this modern road and the development along it. Whereas to the sides and rear of the LB is a large open garden space bordered by a copse which makes a positive contribution to its setting. The proposal would not, therefore, affect the special architectural or historic interest of the LB by virtue of development in its setting. Consequently, there would be no harm to, or loss of, the significance of these designated heritage assets and the development would preserve the LB and its setting.
The dwelling would be innately visually attractive as a result of good architecture, high quality in design and enhance the living conditions of future occupiers. There would be satisfactory car and cycle parking, a safe and suitable means of access, no unacceptable traffic generation, no adverse effect on ecology and no flood risk. The absence of harm in these respects, and compliance with the Council’s development plan and the Framework, are neutral factors in my decision.
No public objection to the proposal, including from the Town Council, does not mean the absence of material planning harm. I have considered the appeal and this particular proposal on its individual planning merits.
Section 07
Planning Balance and Conclusion
The proposal would not accord with the development plan overall. There are no other material considerations, including the provisions of the Framework, which outweigh this finding.
Consequently, for the reasons given above I conclude that the appeal should not succeed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 122No official casework-database value to compare
- Extracted decision date · page 1
- 8 June 2022Matches the official casework database
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3291476
- Application reference
- 8/21/0599/HOU
- Lead case reference
- Not recorded
- Planning authority
- Bournemouth, Christchurch and Poole
- Planning authority code
- E06000058
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 26 January 2022
- Valid date
- 26 January 2022
- Start date
- 8 February 2022
- Planning authority decision date
- 10 November 2021
- Appeal decision date
- 8 June 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 16141
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21