Skip to main content
Official casework recordDismissedCurrent release

Appeal 3291726

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

erection of part two storey part single storey side extension.

  1. Section 02

    Decisions

    The appeal is dismissed. Appeal B Ref: APP/P4225/D/22/3291727

    The appeal is allowed and planning permission is granted for erection of two storey side extension and single storey wrap around extension at [site address] in accordance with the terms of the application, Ref 21/01698/HOUS, dated 2 December 2021, and the plans submitted with it, subject to the conditions set out in the attached schedule.

  2. Section 03

    Procedural Matters

    As the two appeals are essentially for very similar proposals I have linked them and determined the two together in one decision letter.

    The application relating to Appeal A had an inaccurate description of development on the application form as it did not record the fact that part of Appeal Decisions APP/P4225/D/22/3291726, APP/P4225/D/22/3291727 the side extension was single storey at front and rear. I have therefore taken the description for Appeal A from the Council’s decision notice and the appeal form.

  3. Section 04

    Main Issue

    The main issue in respect of both appeals is the effect of the proposed developments on the character and appearance of the host building and its surroundings on [address].

  4. Section 05

    Reasons

    [address] where the appeal site is located is characterised by large, mainly two storey detached and semi-detached houses constructed in brick or render under tiled roofs. The houses are set back from the road in generously sized plots but are built in a variety of styles. No 23 is characterised by hipped roofs and has had a number of extensions made to it. The neighbouring dwelling at No [address] is a single storey bungalow and as such is one of the exceptions to the two storey form prevailing in this part of [address].

    The proposals in Appeal A and B both would involve the construction of a part two storey part single storey side extension in the existing gap between Nos 23 and 25. The difference between the proposals in A and B is that in Appeal B the side extension at first floor would be narrower, set further in from the side boundary with the single storey extension wrapping around it to the rear, side and front. Both proposals in Appeal A and B would be set down at the ridge and set back and it is not a matter of dispute between the parties that the design of either side extension would be subservient to the main house.

    It has been put to me that both Appeal A and Appeal B extensions would result in closing the gap between No 23 and [address] and a loss of spaciousness as a result. I acknowledge that there is an attractive treed backdrop at a higher level behind the properties on this side of [address] but, given the proposed set down at the ridge, the hipped roof to the side extension and existing hipped roof to No 25, a significant element of this green treed backdrop would remain clearly visible from the street. The extent of this would be enhanced as a result of the Appeal B proposal given the increased gap at first floor level over the proposal in Appeal A.

    The visual relationship of the proposed side extension (and particularly the Appeal B version) to the main house, the neighbouring bungalow and the streetscene would be assisted by the fact that it would be set well back in the plot behind the frontage of the main house and well back from the frontage of the bungalow at No 25. As a result there would be no terracing effect and the feeling of spaciousness on the frontage would be maintained. In the approach from the north on [address] the extension would be largely screened from view as a result of the setback and in the approach from the south the extension would be partially screened by No 25 again because of the setback.

    I have been invited to conclude that the resultant dwelling would be of excessive width across the frontage and would virtually fill the entire plot width which would not be in keeping with the character of the Avenue. However, from my observations on the site visit I am not persuaded that this assessment of character is accurate. [name] 31 and 33 at the top of the cul-de-sac are Appeal Decisions APP/P4225/D/22/3291726, APP/P4225/D/22/3291727 properties at least as wide as that proposed at No 23. Moreover, in respect of the appeal property, the design of both the existing property and in its extended form, being divided into bays of varying depths, adds interest to the frontage and means that the frontage width has less impact than a flat fronted property of similar size such as No 31.

    Furthermore, in a significant number of cases the houses in [address], both detached and semi-detached, extend almost to the side boundaries either in their original forms or as extended. Again, because the Appeal B proposal increases the setback of the first floor from the side boundary to 2 metres rather than 1metre, this version of the side extension would be preferable to that in Appeal A. The total gap between No 23 and the neighbouring bungalow at first floor in the Appeal B proposal would be around 3.4 metres and at ground floor around 2.4 metres. Although the Council quotes a lesser distance, I took the opportunity to confirm the measurements on my site visit. These measurements of 3.4 metres at first floor and 2.4 metres at ground level would be sufficient side separation and the relationship between No 23 and No 25 would be better than in other cases in the Avenue because of the generous set back from the frontage that is proposed. I am therefore not persuaded by the Council’s argument that the relationship of the extension with its neighbour at No 25 in Appeal B would be dominant and visually awkward.

    The policies from the [name] (RCS) of relevance in this case are Policy P3 on improving design which requires development to have regard to the scale, density, massing, height and layout of surrounding buildings and areas and contribute positively to townscape by being well-proportioned. Policy DM1 of the RCS similarly requires all development including extensions to be to a high quality design taking the opportunity to enhance the quality of the area. Comparing the two appeal proposals against these policy objectives the proposal in Appeal A would have a greater degree of harm given that the side extension in that case would be closer to the side boundary at first floor level. Even though the difference would only be one metre, in the context this would be significant and it is reasonable to conclude that the proposal in Appeal B would better meet the RCS policy objectives and those of the National Planning Policy Framework seeking a high standard of design.

    Although the Council has referred to the Guidelines & Standards for Residential Development Supplementary Planning Document (SPD) which it has adopted to assist the design of residential development, including extensions, the only directly relevant requirements are at paragraphs 5.1 and 5.12. Paragraph 5.1 states that extensions should be designed to be in keeping with the host property and generally should be subservient to it and paragraph 5.12 relates to avoiding a terracing effect. The criteria in the SPD would therefore be met by either design.

  5. Section 06

    Conclusion and Conditions

    I have considered the matters before me in respect of both Appeals and, for the reasons given above, I conclude that Appeal A should be dismissed due to the proposal having reduced side separation and the consequent harm to character and appearance as well as the failure to take the opportunity to enhance the quality of the area. However, as the Appeal B proposal better meets the policy objectives the appeal should be allowed and permission Appeal Decisions APP/P4225/D/22/3291726, APP/P4225/D/22/3291727 granted for the two storey side extension with wrap around single storey extension subject to the conditions set out in the schedule of conditions below.

    The Council suggested standard conditions, which I have considered in the light of the advice in the Framework and Planning Practice Guidance. A condition requiring development to be carried out in accordance with the submitted plans is necessary in the interest of certainty. The Council also proposed the standard matching materials condition. This is necessary to ensure the character of the house and surrounding area is protected. The Highway Authority in its consultation response proposed that the new driveway should be constructed to meet sustainable drainage requirements. However, this is already clearly indicated as a requirement on the proposed plans and, as the extensions must be carried out in accordance with the approved plans, I consider that this is sufficient and any failure to ensure the driveway met sustainable drainage requirements could be enforced against.

    The development hereby permitted shall begin not later than three years from the date of approval.

    The development hereby permitted shall be carried out in accordance with the following approved plans: SHF/001B and SHF/002P.

    The materials to be used in the construction of the external surfaces of the extensions hereby permitted shall match those used in the existing dwelling.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 566No official casework-database value to compare
    Extracted decision date · page 1
    15 March 2022Matches the official casework database
    Extracted site visit dates
    24 February 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3291726
Application reference
21/00795/HOUS
Lead case reference
Not recorded
Planning authority
Rochdale Metropolitan Borough Council
Planning authority code
E08000005

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Lead

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
52 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
31 January 2022
Valid date
31 January 2022
Start date
7 February 2022
Planning authority decision date
26 November 2021
Appeal decision date
15 March 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
12332
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21