Appeal 3291768
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a single storey rear extension to a kitchen and playroom.
Section 02
Decision
The appeal is allowed, and planning permission is granted for a single storey rear extension to a kitchen and playroom at [site address] , Epping, [postcode] , in accordance with the terms of application [name]/EPF//2307/21, dated 20 August 2021, subject to the following conditions: (i) The development hereby permitted shall begin no later than three years from the date of this decision. (ii)The development hereby permitted shall be carried out in accordance with the following approved plans: 21/E/SGR/03.
Section 03
Procedural Matter
The local planning authority (LPA) in its decision notice has referred to policies in the Epping Forest emerging local plan. However, as the plan has yet to be adopted, I can only give such policies limited weight in the decision-making process.
Section 04
[name]
The main issues are the effect of the proposed development upon (i) the living conditions of the occupiers of [address] in respect of outlook and (ii) whether there would remain an acceptable amount of outside amenity space.
Section 05
Outlook
The appeal building is a detached, two storey dwelling located in a residential area. It has amenity space both to the front and rear. Beyond the latter is what I describe as communal open space.
The rear elevation is stepped, creating a recessed area against the boundary with No [address], with a length of some 1.65 metres. In addition, No [address] is set back slightly from, and parallel to, the recessed area.
The proposed development is for a single storey, rear extension which would extend in a straight line beyond the furthest part of the dwelling by about 3 metres. In so doing, it would infill the recess by some 4.56 metres at the mutual boundary with number [address].
A Certificate of Lawful Development has previously been issued for a single storey rear extension of 3 metres in length for that part of the rear elevation which is not recessed1. While the appeal proposal is not submitted on the basis that it is permitted development, it would extend outwards by the same amount at this point. It would also include the incorporation of the recessed area, extending development here by some 4.56 metres.
On my site visit, I was able to note that views from the windows to No [address] look directly down the length of its garden, and which has a south-easterly orientation. There is a wooden boundary fence between the properties of approximately 1.5 to 2 metres high.
While the proposed extension would bring development closer towards No [address], by its single storey height I consider that it would not dominate the outlook for the occupants of the latter dwelling.
Therefore, I conclude that the proposed development would accord with policy DBE9 of the Epping Forest Local Plan and Alterations (1998 and 2006) (LP) which aims to protect the visual impact of development, and with policy CP7 in so far as it aims to protect amenity. Policy CP2 of the LP which aims to protect the quality of the rural and built environment, is not directly relevant. It would conform to paragraph 130 (f) of the National Planning Policy Framework 2021 (the Framework) which requires a high standard of amenity to be achieved for existing and future users. Paragraph 92 of the Framework which promotes social interaction, the prevention of crime and healthy lifestyles is not directly relevant.
Section 06
Private amenity space
The LPA considers that the proposed development would leave outside amenity space to the rear of the dwelling of some 55 m2. It refers to policy DBE8 of the LP which requires new development to provide accessible open space to the rear of dwellings of a reasonably usable size and shape and with an appropriate aspect.
I consider that the dwelling would still retain an adequate amenity area to permit leisure and other usage if the extension is constructed, and which would 1 EPF/1700/21. meet the criteria in policy DBE8. In addition, the dwelling also has a relatively large front amenity area, and adjoining it to the rear is a communal grassed open space.
Therefore, I conclude that the proposed development would not contravene policy DBE8 and would accord with paragraph 130(e) of the Framework which requires an appropriate amount of green space in new development.
Section 07
Other Matters
In its officer report, the LPA considers that the proposed development would set an unacceptable precedent for similar development. However, any such proposals would be considered on their individual planning merits, as has the appeal case before me.
The LPA has also referred to the possible loss of light to No [address], though it has not included this as a reason for refusal. However, when considering the limited height of the proposed development and the southerly facing aspect of the dwellings, I do not consider that there would be any significant loss of sunlight or daylight. On my site visit at approximately 2:30pm, I was able to observe that sunlight was being received on the whole of the rear elevation to No 41 Stewards Green and to note that the proposed extension to the appeal dwelling would be unlikely to change this to any significant degree.
None of the other matters raised alter or outweigh my conclusions on the main issues.
Section 08
Conclusion
The proposal accords with the development plan for the area. Therefore, the appeal should be allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 3544No official casework-database value to compare
- Extracted decision date · page 1
- 24 October 2022Matches the official casework database
- Extracted site visit dates
- 7 October 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3291768
- Application reference
- PL/EPF/2307/21
- Lead case reference
- Not recorded
- Planning authority
- Epping Forest District Council
- Planning authority code
- E07000072
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 26 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 31 January 2022
- Valid date
- 31 January 2022
- Start date
- 9 February 2022
- Planning authority decision date
- 9 November 2021
- Appeal decision date
- 24 October 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 22362
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21