Appeal 3291944
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a proposed two storey side extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The main issue is the effect of the proposal on the character and appearance of the area.
Section 04
Reasons
[address] is a residential cul-de-sac consisting primarily of two-storey semi-detached dwellings. With some exceptions, dwellings in the road generally have a similar spacing between each semi-detached block. This contributes to the street’s planned pattern, giving it a suburban appearance of relatively low density and reasonable spaciousness.
The proposal would extend the property close to the edge of the plot, where it adjoins [address]. The extension’s ridge and eaves lines are set lower than those of the existing house, with the aim of making it appear subservient to its host.
Nevertheless, as a result of its two-storey height, lack of set back from the existing front elevation and it occupying almost the full width of the gap between the side elevation of the host dwelling and the shared boundary with No 27, the extension would result in a terracing effect. The erosion of the gap between the appeal property and No 27, without any relief in the front elevation of the dwelling, would significantly reduce the spaciousness of the street scene. Furthermore, this would lead to a change in the street’s pattern to one that is denser, with an unrelieved mass of building.
I have no evidence that the occupiers of No 27 currently seek to extend their property. However, were I to allow the appeal, it would be very difficult for the Council to then resist a subsequent proposal to extend that property towards the appeal site. There is therefore a very real prospect of a terracing effect being created, causing significant harm to the street’s overall character.
I saw that other properties in the road have been extended, and my attention has been drawn to the two-storey extensions to 22 and [address]. I do not have the background to these cases before me, but the extension to No 22 appears similar in its width to the appeal proposal. However, I am told that this was approved in 2007 and therefore predates adoption of the current Development Plan in 2015 and 2019. Furthermore, the existence of this extension does not justify perpetuating the harm I have identified, by allowing a further full width two-storey proposal on the appeal site.
With regard to No 28, its position at the head of the cul-de-sac with space to its boundary with [address], means that terracing is less of a concern here. The single storey extensions that the appellant has also referred to, including that at [address], still allow for space between properties at first floor level, and so do not have the same impact as this two-storey proposal.
I therefore conclude that the proposal would harm the character and appearance of the area, contrary to policies DE1 and DE5 of the Torbay Local Plan 2012-2030 (adopted 2015) and Policy TH8 of the Torquay Neighbourhood Plan (adopted 2019) which together require that proposals must relate to the surrounding built environment, be of good quality design and have no adverse effects on the street scene, as does the National Planning Policy Framework.
Section 05
Other Matters
I fully appreciate the significance of the proposal to the needs of the appellant’s family, both now and in the future. However, planning permission runs with the land and is primarily concerned with the public interest, rather than personal circumstances. Although the proposals may result in less reliance by occupiers on the state in the future, I am only able to give limited weight to these matters.
After careful consideration, I do not consider that the benefits to the appellant’s family would overcome the harm identified, particularly for a permanent extension that would remain long after such circumstances may have changed. I have also noted comments made about the Council’s handling of the case, but this has had no bearing on my consideration of the planning merits of the appeal.
Section 06
Conclusion
For the reasons given above, having considered the Development Plan as a whole and all other material considerations, the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2127No official casework-database value to compare
- Extracted decision date · page 1
- 28 March 2022Matches the official casework database
- Extracted site visit dates
- 8 March 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3291944
- Application reference
- P/2020/1274
- Lead case reference
- Not recorded
- Planning authority
- Torbay Council
- Planning authority code
- E06000027
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 32 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 2 February 2022
- Valid date
- 14 February 2022
- Start date
- 15 February 2022
- Planning authority decision date
- 12 January 2022
- Appeal decision date
- 28 March 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 13059
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21