Appeal 3292536
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as ‘2.4m crossover to allow off-street parking on front driveway. Required to allow the use of a fully electric vehicle.’
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
I have used the description given on the original application form.
Section 04
Main Issue
The main issue is the effect of the proposed development on highway safety.
Section 05
Reasons
The area is predominantly residential in character, containing terraced, semi-detached and detached dwellings. Properties have a mix of front garden treatments, with a variety of landscaped and paved frontages. The appeal property is a semi-detached dwelling, which is set back from the highway behind a paved frontage. Vehicular access is available to the rear of the site via a private track.
[address] West is a busy classified road, with a 30mph speed limit. The road is relatively straight in the vicinity of the appeal property and on-street parking to the front of the property is unrestricted.
There is not enough information before me to confirm whether vehicles would be able to manoeuvre within the site and exit in a forward gear. In any event, should 2 cars be parked side by side then this would prevent vehicles from turning on site and vehicles would have to reverse onto the highway. Even taking into consideration the relatively straight road, visibility for vehicles reversing out of the appeal site would be obscured by on-street parking.
Although vehicles could reverse into the site, this cannot be guaranteed. It would also require manoeuvring within the road, which would interrupt the free flow of traffic. Given the busy road conditions this would increase the risk of accidents. Regardless of whether vehicles exit the site in a forward or reverse gear and having regard to speed restrictions, visibility would be obstructed by vehicles parked on the highway, which would lead to conditions which would be prejudicial to highway safety.
Whilst the width of the site and lack of front boundary treatment, means that vehicles exiting the site would have a clear view of the pavement. Vehicles entering the site from the highway, whether in reverse or forward gear, would have visibility of the pavement and pedestrians obscured by on-street parking. Consequently, the proposed development would cause an additional hazard to pedestrians.
Although parallel parking on the roadside may disrupt traffic flows, this is a very different manoeuvre and would not require vehicles to traverse the pavement. Parallel parked vehicles would also have greater visibility of traffic on the highway. I do not consider that the proposal would lessen the intensity of vehicular movements compared with on-street parking or reduce interruptions to the highway network.
I agree with both parties that there would be no conflict with parts a, b and h of Policy DMD 46 of Improving Enfield Development Management Document 2014 (DMD). In respect to part g, there is limited evidence before me to demonstrate why the rear access could not facilitate electric vehicle charging and provide a safer alternative. However, the submission of such evidence would not alter my decision. It is acknowledged that the proposal would enable the appellant to conveniently charge an electric vehicle on their driveway. Such technology is supported by local and national planning policies. Nevertheless, I do not consider that this benefit outweighs the harm that I have identified.
Although the proposal would result in the loss of an existing on-street parking space, this would be replaced by parking to the front of the dwelling, which would mitigate this loss.
Limited information has been submitted on the extent that the road is used by bus services. Regardless of whether the road is a bus route or not, my findings regarding highway safety still stand.
[name] noted on my site visit that there are properties near the appeal site that have off-road parking to the front, there is limited information before me on the status of these driveways. However, some of these properties have wider plots, where there is more room to manoeuvre on site. The continuous presence of vehicular crossovers also restricts on-street parking and visibility is therefore better in these examples. Nevertheless, the presence of existing driveways does not justify the harm that I have identified to highway safety.
Overall, I conclude that the proposed development would be harmful to highway and pedestrian safety. The proposal would be contrary to [name] 24 and 30 of The Enfield Plan Core Strategy 2010-2025 adopted in 2010 and Policy DMD 46 of the DMD, which requires that developments do not have an adverse impact on road safety. Furthermore, it would be contrary to the Council’s Revised Technical Standards for [name] (excluding Heavy Duty Crossovers) dated 2013, which seeks to minimise any adverse impact on road safety and congestion.
In addition, the proposed development would fail to comply with the National Planning Policy Framework 2021, which seeks to resist development where there would be an unacceptable impact on highway safety.
Section 06
Other Matters
I note the letter of support from a third party. However, there is no evidence of a notable concern regarding passing on the road at present. In any event, the removal of one on-street parking space would have limited impact in an area where on-street parking is prevalent.
Section 07
Conclusion
For the reasons given above, having regard to the development plan as a whole and all other relevant material considerations, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 5777No official casework-database value to compare
- Extracted decision date · page 1
- 1 March 2023Matches the official casework database
- Extracted site visit dates
- 14 February 2023 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3292536
- Application reference
- 21/04492/HOU
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Enfield
- Planning authority code
- E09000010
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 10 February 2022
- Valid date
- 10 February 2022
- Start date
- 15 March 2022
- Planning authority decision date
- 2 February 2022
- Appeal decision date
- 1 March 2023
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 29010
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21