Appeal 3292624
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the installation of trellis above the wooden fence to side and rear.
Section 02
Decision
The appeal is dismissed.
Section 03
Appeal Procedure
The site visit was undertaken by an Appeal Planning Officer whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
Preliminary Matters
In the interests of accuracy and conciseness, the description of development used in the header above is based on that used on the Council’s decision notice which I also note has also been adopted by the appellant on their Appeal form. In addition to the above, I saw at my site visit that the trellis identified in red on the submitted plans had already been erected.
Section 05
Main Issue
The main issue is the effect of the development on the character and appearance of the host dwelling and surrounding area.
Section 06
Reasons for the Recommendation
The appeal property is a modern semi-detached house located on a residential estate of houses similar in character to the appeal property. Between the pairs of semi-detached properties gates are present, with some properties having low sections of trellis fixed above them. The boundary treatment of the rear gardens of the surrounding properties predominantly comprise of close-boarded timber fencing similar in height adding a sense of uniformity. That said, I acknowledge that there are other types of boundary treatments in the area to the property frontages and roadside boundaries.
The trellis that has been erected is above the existing timber fencing at the side and rear of the property and varies in height. The appellant has set out that the combined fence height ranges from around 2.85 metres high to around 3.4 metres high and this appears consistent with what I viewed on site. The trellis is around the height of the bottom of the first-floor windows and is higher than the lean-to structure at the rear of the property.
Given the overall height and extent of the trellis, it starkly contrasts with the existing boundary treatment of the surrounding properties and consequently appears overly prominent, obtrusive and incongruous. As a result, it is harmful to the character and appearance of the appeal property and the wider area.
In coming to that view, I noted that there is some variation in surrounding ground levels which mitigates some of the impact of the height of the trellis. I also acknowledge that there are trellis panels erected on other properties in the area. However, these were at a lower height than the trellis that has been erected at the appeal property. This is particularly evident with the comparison between the appeal proposal and the trellis over the side gate at the adjoining property, [address].
As well as this impact from [address], I am also conscious that the trellis is visible from a number of residential properties as well as further glimpses of the trellis from [address] between Nos. 2 and 4.
[name] saw at my site visit, the appellant has attempted to integrate the trellis with the existing fencing to improve its appearance. Whilst this has had some positive impact, this does not overcome the harm I have found principally as a result of the excessive height of the trellis.
For the reasons outlined above, I find that the development harms the character and appearance of the host dwelling and surrounding area. It therefore conflicts with Policy PG3 of the Birmingham Development Plan 2017 which requires high quality design and development that reinforces a positive sense of place. It would also conflict with saved Paragraphs 3.14C-D of the Birmingham Unitary Development Plan 2005 and the provisions of the ‘[name], [name] 2007 supplementary planning document (SPD) which encourages development that is respectful to its surroundings and that fits comfortably with the character of the area. It would also be at odds with the overarching design aims of the National Planning Policy Framework.
Section 07
Other Matters
The appellant has set out that the trellis provides increased security due to a fear of crime, increased and mutual privacy, and prevents tennis balls going into neighbouring gardens as well as preventing animals entering the garden. I have also had regard to the letters of support from the occupiers of neighbouring properties.
The appellant has drawn my attention to a recent appeal case1 which was related to the erection of a fence where the impact on character and appearance was a main consideration. From the limited information I have, this proposal related to a much lower fence than the proposal before me and as 1 [name]/P4605/D/19/3226112 such this is not comparable. Moreover, each proposal must be considered on its individual merits.
In addition to the above, the appellant has set out a potential fallback position which is essentially that a fence two metres in height could be erected using permitted development rights. Whilst this may well be the case, it would not have the same impact which the appeal proposal has. I can therefore only give this fallback position limited weight.
Taking all of the above factors into account, none of these matters provide for a compelling reason why planning permission should be granted for an otherwise unacceptable development.
Section 08
Conclusion and Recommendation
For the reasons given above and having had regard to all other matters raised, I recommend that the appeal should be dismissed.
Section 09
Inspector’s Decision
I have considered all the submitted evidence and the Appeal Planning Officer’s report and on that basis the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2894No official casework-database value to compare
- Extracted decision date · page 1
- 18 August 2022Matches the official casework database
- Extracted site visit dates
- 2 August 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3292624
- Application reference
- 2021/08017/PA
- Lead case reference
- Not recorded
- Planning authority
- Birmingham City Council
- Planning authority code
- E08000025
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 11 February 2022
- Valid date
- 11 February 2022
- Start date
- 3 March 2022
- Planning authority decision date
- 1 December 2021
- Appeal decision date
- 18 August 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 19479
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21