Skip to main content
Official casework recordAllowedCurrent release

Appeal 3292938

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

part two/part single rear extension, loft conversion and façade modifications.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for part two/part single rear extension, loft conversion and façade modifications at [site address] , Esher [postcode] in accordance with the terms of the application, Ref 2021/4076, dated 25 November 2021, subject to the following conditions:

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.

    The development hereby permitted shall be carried out in accordance with the approved plans. HA/20RD/01 A01, HA/20RD/02 A01 HA/20RD/03 A02, HA/20RD/04 A02

    The flat roof to the extension hereby permitted shall not at any time be used as a balcony, roof garden or similar amenity area.

    Prior to the first occupation of the development hereby permitted the first floor windows in the side elevations of the development hereby permitted shall be glazed with obscure glass that accords with level three obscurity as shown on the pilkington textured glass privacy levels (other glass suppliers are available) and only openable above a height of 1.7m above the internal floor level of the room to which it serves. These windows shall be retained as such thereafter.

  2. Section 03

    Main Issue

    The main issue is the effect on the living conditions of neighbouring occupiers with particular regard to any overbearing effect on [address].

  3. Section 04

    Reasons

    Along the side elevation closest to no. 22, the proposed extension would project around 3.2m, and would be two storeys in height with a pitched roof above. Both houses at no. 20 and 22 are set away from the boundary, and this would not change, resulting in some separation between the extension and the adjacent property.

    The windows at no. 22 closest to the proposed addition are bay windows to the rear which have their main aspect across the garden, and windows to the side elevation which face towards the side of no. 20. This neighbouring dwelling is a large property with a generous garden and benefits from a number of other windows from which the extensions would be unlikely to be readily apparent.

    Therefore, considering the separation and depth of the proposed extension along with the arrangement of the neighbouring dwelling and its plot, the proposed two storey extension would not have an unacceptably overbearing effect.

    Furthermore, taking into account the detailed evidence by professionals, I am satisfied that acceptable levels of daylight and sunlight would be achieved in the neighbouring property and its garden. Additionally, the proposed rear windows would not result in a significant increase in overlooking over and above that which currently exists from first floor rear windows.

    Consequently, the proposed development would result in an acceptable effect on the living conditions of neighbouring occupiers with particular regard to any overbearing effect on [address]. Therefore, in this respect, the proposed development would be in accordance with Policy DM2 of the Elmbridge Local Plan Development Management Plan April 2015 which requires that new development should protect the amenity of adjoining occupiers, amongst other things. As well as the advice in the Elmbridge Local Plan Design and Character Supplementary Planning Document April 2012 which provides advice on achieving good design, including considering amenity issues.

  4. Section 05

    Other Matters

    I have no indication that other properties on the Eastern side of [address] are proposing similar additions. In any case, if they were, these would be judged on their individual merits.

  5. Section 06

    Conditions

    I have had regard to the planning conditions that have been suggested by the Council and considered them against the tests in the National Planning Policy Framework (2021) and the advice in the Planning Practice Guidance. I have made such amendments as necessary to comply with those documents.

    I am attaching the standard implementation condition, and in the interests of certainty a condition to define the plans with which the scheme should accord. A condition requiring that materials should match the existing is in order to protect the character and appearance of the area. Also, conditions that the roof must not be used as a balcony or similar and that first floor side windows should be obscure glazed and only open above 1.7m is required in the interests of the living conditions of neighbouring occupiers.

    The evidence before me shows that the site has a low risk of flooding from rivers and seas and it is outside the area at a high risk of flooding from surface water. Taking into account the scale and nature of the development I am satisfied that it would not increase the overall and local risk of flooding. Consequently, a condition to secure flood mitigation measures is not required.

  6. Section 07

    Conclusion

    For the reasons given above I conclude that the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 357No official casework-database value to compare
    Extracted decision date · page 1
    26 April 2022Matches the official casework database
    Extracted site visit dates
    20 April 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3292938
Application reference
2021/4076
Lead case reference
Not recorded
Planning authority
Elmbridge Borough Council
Planning authority code
E07000207

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
0 m²
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
16 February 2022
Valid date
16 February 2022
Start date
4 March 2022
Planning authority decision date
31 January 2022
Appeal decision date
26 April 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
14331
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21