Appeal 3293389
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
‘Erection of a boundary fence fronting the public highway’.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
The description of development was amended following submission of the application. It was ‘Erection of a 1650mm high timber fence fronting the public highway’. I have utilised the amended description of the development, which better reflects the materials and design of the fence proposed.
Section 04
[name]
The main issue is the effect of the proposal on the character and appearance of the site and surrounding area.
Section 05
Reasons
The appeal site is a detached 1980’s dwelling within a small cul-de-sac in a suburban area. The appeal site has a relatively shallow and wide rear garden, conversant with its size and era of construction. The rear garden bounds [address], to the west. [address] is also a predominantly residential road, which has a formal junction with [address], a main road, and which eventually splits in various directions and is met by a network of footpaths and single-track roads. [address] transitions into a semi-rural character at a relatively short distance from [address].
[address] has a strong verdant and sylvan character by virtue of the landscaped front gardens, hedged boundary treatments and mature trees along its route. The rear boundary hedge of the appeal site and its neighbouring properties make an important contribution to the strong verdant character at the junction with [address], as they are all bounded by a single, high, mature hedge.
The appeal proposal would replace part of the existing long line of hedge with a wire chain link fence to the rear boundary of the appeal property. Some unspecified landscape planting would be planted within the site, leaving the chain-link hedge exposed to [address] for an extended period of time. This would erode the verdant character at a prominent point in [address] and would be out of keeping with the surrounding boundary treatments, which are predominantly hedged only or feature a low-level fence or wall with hedging behind.
The materials of the appeal proposal would appear discordantly urban or institutional utilitarian in the context of the semi-rural character of [address].
Whilst a nearby property has erected some close-board timber fencing to the rear boundary fronting [address], the hedge and tree behind it are clearly visible, and the materials used are natural and more appropriate to the character of the road. Nonetheless, this close-board fencing has also eroded the verdant character of the area and the cumulative loss of the hedgerow along the rear of the properties would have a significant detrimental effect on the area.
As such, the appeal proposal would cause substantial harm to the character and appearance of the surrounding area, which could not be overcome by a landscaping condition.
The Appellant’s argue that the chain link fence is important for the security of themselves and their property, and for the privacy of the family’s children. Their grounds of appeal refer to a person’s ‘inalienable right to security’. Article 5 of the Human Rights Act 1998 (as amended) (HRA) refers to the right to liberty and security; however, this is a limited right and relates to the protecting of freedom from unreasonable detention rather than personal safety and security of property. The Bill of Rights was introduced to Parliament in June 2022 and will repeal and replace the HRA; however, it will retain all the Convention Rights from the [name] on Human Rights (ECHR) and is yet to become law.
The Appellant’s right to a family life under Article 8 sets out the right to respect for private and family life, his home and his correspondence. This is also a limited right and interference with this right in accordance with the law as is necessary in a democratic society is lawful. In this case, the interference with the Appellant’s home in preventing the erection of a boundary treatment which would cause harm to the character and appearance of the surrounding area would be a proportionate interference in securing the rights and freedoms of others in accordance with planning law and policy.
In any case, the hedge which bounds the rear of the site is mature, predominantly evergreen and well-established. It provides a good standard of privacy for the appeal site, which would not be matched by the appeal proposal. Security could be further enhanced without the harm identified above.
Therefore, the proposal is contrary to policies TD1 and NE2 of the Local Plan Part 1, adopted in 2018 and saved policies D1, D4 and D7 of the Local Plan, adopted in 2002, and policy FNP1 of the Farnham Neighbourhood Plan, made in 2013, as well as the National Planning Policy Framework (the Framework). These policies seek, amongst other things, development of a high-quality design which is sympathetic to the character of its surroundings.
Section 06
Conclusion
For the reasons stated above, I find that the appeal proposal is contrary to the relevant policies of the Development Plan. No other considerations indicate that the appeal should be determined other than in accordance with the development plan. The appeal is accordingly dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 254No official casework-database value to compare
- Extracted decision date · page 1
- 31 August 2022Matches the official casework database
- Extracted site visit dates
- 15 June 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3293389
- Application reference
- WA/2021/01045
- Lead case reference
- Not recorded
- Planning authority
- Waverley Borough Council
- Planning authority code
- E07000216
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 0 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 21 February 2022
- Valid date
- 21 February 2022
- Start date
- 2 March 2022
- Planning authority decision date
- 30 November 2021
- Appeal decision date
- 31 August 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 20031
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21