Skip to main content
Official casework recordAllowedCurrent release

Appeal 3293445

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

10 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

erection of home office and residential annex in garden.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for erection of home office and residential annex in garden at [site address] in accordance with the terms of the application, Ref 21/02854, dated 24 November 2021, subject to the conditions in the attached schedule.

  2. Section 03

    [name]

    Given the size of the proposed building and the facilities within it, the Council maintains that the proposal should be considered as a new dwelling. However, even if the accommodation provided would allow for independent day-to-day living that does not necessarily mean that the annex would be used separately. The appellant explains that it is intended to be a home office, to provide additional space for family members and possibly a home gym. In any event, the application is expressly for an annex and the appeal should also be dealt with on that basis.

  3. Section 04

    [name]

    These are:- • Whether users of the proposed annex would be at risk of flooding having regard to local and national policies; and • The effect on the integrity of the Thames, Medway and [name] and [name] and Sandwich Bay Special Protection Areas (SPAs).

  4. Section 05

    Flooding

    The proposal would replace an existing garage and would be sited alongside the house at Billmeir on land within [name] 2 and 3a. A ditch runs along the front boundary of the site. The appellant’s flood risk assessment (FRA) of July 2020 refers to risks from the surrounding drainage network following an extreme rainfall event.

    The National Planning Policy Framework establishes that applications for some minor development should not be subject to the sequential or exception tests. According to footnote 56, this includes householder development. The Planning Practice Guidance (PPG) on [name] and [name] indicates that minor development means outbuildings within the curtilage of an existing dwelling. As the annex would be incidental or ancillary to the use of Billmeir, it would fall into this category. The PPG also notes that minor developments are generally unlikely to raise significant flood risk issues.

    The Framework nevertheless confirms that they should still meet the requirements for site specific flood risk assessments. Furthermore, where development takes place in areas of highest risk, it should be made safe for its lifetime without increasing flood risk elsewhere. To that end, the FRA recommends a number of mitigation measures including setting the ground floor level above the maximum predicted flood level, limiting any sleeping accommodation to the upper floor and including an attenuation basin to provide compensatory flood storage. With these in place, the proposed annex would be sufficiently flood resistant and resilient to the level and nature of the flood risk.

    The appellant highlights developments at [address] and [address] that have been permitted by the Council without providing flood mitigation. Requiring it in this case would give rise to an apparent inconsistency. However, given the importance attached in national policy to meeting the challenge of flood risk and for the safety of users, it is more important to implement the recommendations made in the detailed FRA. Without them in place the criteria in paragraph 167 of the Framework would not be met.

    In conclusion, an FRA has been undertaken in accordance with Policy CC4 of the Canterbury District Local Plan. Given that the proposal falls within the definition of “minor infill development” there is no conflict with Policy CC6. Subject to the recommended safety measures being secured, any risks from flooding to users of the annex would be within acceptable limits.

  5. Section 06

    Integrity of the SPAs

    The site is within the zone of influence of the Thames, Medway and [name] and [name] and [name]. However, there is no evidence that pressure on their special character or ecological importance would occur as a result of the proposed annex. As such, there would be no likely significant effect on the SPAs. Given this finding, there is no need to require mitigation by means of a financial contribution or to undertake an appropriate assessment. There would be no conflict with Local Plan Policies SP6 and LB5 as the integrity of the SPAs would not be adversely affected.

  6. Section 07

    Other Matters

    The proposed annex would be in a similar location to the dwellings that are the subject of separate appeals (Refs: APP/J2210/W/21/3280630 & 3287695). However, the design of the building is not the same and this proposal has to be considered on an individual basis.

    The site is within the urban area of Whitstable and the building would fit comfortably into the street scene between Billmeir and [address]. As an adjunct to the existing dwelling the implications for road traffic would be minimal. Using the annex as a home office would be unlikely to be disruptive to adjacent properties. Because of its location within a row of buildings, any consequences for privacy and light at neighbouring dwellings would be insignificant. These concerns, and other points raised, do not amount to objections to the proposal.

  7. Section 08

    Conditions

    In the interests of certainty the plans should be specified. The proposal is for an annex and its use as such should be confirmed. This will address concerns about the future use of the building. The mitigation and resilience measures specified in the FRA should be incorporated to minimise the risks of flooding affecting users of the building.

  8. Section 09

    Conclusion

    The proposed annex would accord with the development plan and there are no other material considerations to the contrary. For the reasons given the proposal is acceptable and the appeal should succeed.

  9. Section 10

    SCHEDULE OF CONDITIONS

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with drawing nos MG/21/11/1, 2 & 3.

    The development hereby permitted shall only be used as an annex for purposes ancillary to, or incidental to, the residential use of the dwelling known as Billmeir and shall not be used as a separate unit of living accommodation.

    The finished floor level of the development hereby permitted shall be a minimum of 16.2m AODN. Any sleeping accommodation shall be at first floor level only.

    No development above foundation level shall take place until details of any internal flood resistance and resilience measures have been submitted to and approved in writing by the local planning authority. The details shall also include confirmation that the occupiers of Billmeir have signed up to the Environment Agency’s early flood warning service and a flood warning and evacuation plan for the development hereby permitted. The approved details and measures shall be implemented prior to the first use of the building and thereafter retained.

    The compensatory floodplain storage shall be provided prior to the first use of the development herby permitted in accordance with the Flood Risk Assessment by Herrington Consulting Limited dated July 2020 and the [name]: Addendum to [name] dated 14 June 2021.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 311No official casework-database value to compare
    Extracted decision date · page 1
    13 December 2022Matches the official casework database
    Extracted site visit dates
    30 November 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3293445
Application reference
21/02854
Lead case reference
Not recorded
Planning authority
Canterbury City Council
Planning authority code
E07000106

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
120 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
21 February 2022
Valid date
21 February 2022
Start date
14 March 2022
Planning authority decision date
31 January 2022
Appeal decision date
13 December 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
25051
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21