Appeal 3293534
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as a ‘first floor side extension, repositioning of front entrance door, downlighting to front elevation, first floor landing window’.
Section 02
Decision
The appeal is allowed insofar as it relates to the repositioning of the front entrance door, front porch and canopy and first floor landing window only and planning permission is granted for the repositioning of the front entrance door, front porch and canopy and first floor landing window at [site address] , Chigwell, [postcode] in accordance with the terms of the application [name]/1972/21, dated 6 May 2021, subject to the following conditions:-
The development hereby permitted shall begin not later than three years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans insofar as they relate to the porch/canopy and first floor landing window only: [name]. 1 [name] - [name] and Sections; [name]. 2 [name] - [name] and Existing and [name] and [name]; [name]. 3 [name] - Existing and [name].
The materials used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.
The appeal is dismissed insofar as it relates to the first floor side extension.
Section 03
Preliminary matters
The Council’s decision describes the proposal as a ‘first floor side extension, repositioning of front entrance door, front porch and canopy and first floor landing window.’ It is clear from the plans that this describes the proposal more accurately and I have therefore considered the appeal on this basis.
The Council’s decision refers to policy DM9 in the Epping Forest District Local Plan [name] 2017 (LPSV) which concerns design quality and residential amenity. I have noted that the LPSV has been submitted for examination, that the hearings have taken place and that the Inspector has issued interim advice on the necessary actions to enable soundness to be addressed. I have also noted that at 24 March 2022 the Inspector’s report on the main modifications consultation had not been published. I have not been told of any significant changes that would affect policy DM9 insofar as it relates to this appeal. As such, it can be given substantial weight for the purposes of this appeal in accordance with the National Planning Policy Framework.
Section 04
Main issues
The main issues in this appeal are the effect of the proposed development on:- • the character and appearance of the street scene; • the living conditions of the neighbouring occupiers at no [address] with regard to outlook.
Section 05
Character and appearance
The development plan includes policy DBE10 in the Epping Forest District Local Plan (1998) (LP) which seeks to ensure, amongst other things, that extensions complement the street scene. LPSV policy DM9 seeks to ensure that proposals have regard to design quality. Those policies are consistent in those respects with national policy in the Framework which has a similar objective. The appeal site comprises a modern detached house on a small, leafy estate of properties of varying sizes built in a cottage style and set on a winding road with varying building lines and different ground levels, giving it an informal character. It is clear that some dwellings have been extended. In contrast to the wider fronted dwellings to either side, the appeal dwelling has a boxy appearance with a main gabled roof, a main entrance in a side elevation and a single storey side addition.
The proposed side extension would extend over the existing, side addition close to the boundary with the neighbouring dwelling at no 3, resulting in a two storey side projection. It would have a hipped roof and would be set back behind a double garage block which serves the dwelling and its neighbour. As it would be set back slightly from the main front wall of the dwelling and the new ridge would be set down from the main ridge, it would be sufficiently subordinate to the original dwelling. When seen from the street, it would widen the front elevation resulting in a less boxy appearance which would be a visual improvement. It would be similar in width to the adjacent dwelling at no 5 and would not be significantly greater than that of the dwelling at no 3. Although it would reduce the open gap with no 3, a generous gap would remain and it would not appear at all cramped in this informal street scene.
The proposed development also includes a small porch with a hipped roof canopy across most of the width of the main part of the dwelling and the formation of a new landing window in the side elevation facing no 5. The Council has not raised any objection to those elements and as the design of the porch/canopy would reflect a similar front projection at no 5 and the new window would be in a similar style to the existing windows, these would also be acceptable.
In terms of character and appearance then, I agree with the Council’s officer’s report that the proposal would not represent overdevelopment. It would be of an acceptable siting, size, scale and design that would complement the character and appearance of the street scene. It would therefore accord with development plan policy DBE10 and with LPSV policy DM9.
Section 06
Living conditions
LP policy DBE9 seeks to ensure, amongst other things, that extensions do not result in an excessive loss of residential amenity for neighbouring occupiers in terms of visual impact. LPSV policy DM9 also seeks to ensure that proposals take account of neighbours’ amenity. Those policies are consistent in those respects with national policy in the Framework which requires that proposals do not undermine the quality of life.
The Council’s officer’s report raised no objection in this regard to the proposal and noted that there is a good separation distance between the proposed side extension and the flank elevation of no 3 (6m according to the appellant). However, I noted at my visit that no 3 and its garden are sited at a significantly lower ground level than the appeal site. I also saw that it has a raised sitting out area adjacent to the shared boundary which was not referred to the report.
The existing single storey side extension at the appeal site is less than 0.5m from the side boundary and extends along the length of that sitting out area and beyond. As a result of its single storey height, it is not overly dominant when seen from the sitting out area. However, the proposed first floor extension would introduce a large expanse of brickwork in very close proximity to this sitting out area which, given its height and siting, would be oppressive and unduly overbearing in the outlook of the neighbouring occupiers when using that area despite the partial screening afforded by a large oak tree and planting along the boundary. As this is the main sitting out area for the property, it would result in significant harm to the living conditions of the neighbouring occupiers and it would therefore be contrary to development plan policy DBE9 and to LPSV policy DM9 in this respect.
Section 07
Conclusion and conditions
As the porch/canopy and new landing window are clearly separate elements from the side extension, I shall issue a split decision. In addition to the standard commencement condition, a condition is necessary requiring that the development is carried out in accordance with the approved plans (insofar as it relates to those elements only), in order to provide certainty. A condition requiring matching external materials is necessary in the interests of the character and appearance of the street scene.
For the reasons given above, I conclude that the appeal should be allowed, insofar as it relates to the porch/canopy and new landing window only. Insofar as it relates to the side extension, given the significant harm that would arise in terms of living conditions, the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 227No official casework-database value to compare
- Extracted decision date · page 1
- 6 May 2022Matches the official casework database
- Extracted site visit dates
- 13 April 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3293534
- Application reference
- EPF/1972/21
- Lead case reference
- Not recorded
- Planning authority
- Epping Forest District Council
- Planning authority code
- E07000072
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 32 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Split Decision
- Decision category
- Split decision
- Received date
- 22 February 2022
- Valid date
- 22 February 2022
- Start date
- 15 March 2022
- Planning authority decision date
- 9 December 2021
- Appeal decision date
- 6 May 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 14838
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21