Skip to main content
Official casework recordDismissedCurrent release

Appeal 3293839

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

11 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

loft conversion.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Appeal Procedure

    The site visit was undertaken by an Appeal Planning Officer whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.

  3. Section 04

    [name]

    Following the submission of this appeal the Wyre Forest District Local Plan 2016 – 2036 (LP) was adopted in 2022. The policies within the LP superseded those in the [name] (adopted 2010) and the Site Allocations and Policies Local Plan (adopted 2012). I have been provided with the relevant policies from the LP and both parties have had the opportunity to comment on the change in policy context.

  4. Section 05

    Main Issue

    The main issues are: • whether the proposal would be inappropriate development in the Green Belt having regard to the National Planning Policy Framework (The Framework) and any relevant development plan policies • the effect of the openness of the Green Belt • if the development is inappropriate, whether the harm by reason of inappropriateness, and any other harm, would be clearly outweighed by other considerations so as to amount to the very special circumstances required to justify the proposal.

  5. Section 06

    Whether inappropriate development

    The Framework establishes that new buildings within the Green Belt are inappropriate development subject to a number of exceptions. This includes the exception in paragraph 149 c) for the extension or alteration to a building provided that it does not result in disproportionate additions over and above the size of the original building. The Framework defines ‘original building’ as a building as it existed on 1 July 1948 or, if constructed after 1 July 1948, as it was built originally.

    Policy DM.22 of the LP provides that development will not be permitted within the Green Belt except in very special circumstances or where one of a list of exceptions applies. Criterion iii allows for extensions to existing dwellings, provided that it does not result in disproportionate additions over and above the size of the original dwelling.

    No 12 is a detached bungalow set back from the roadside within spacious grounds. The Council has identified that the property has been considerably extended to the side and rear, including a swimming pool and garage. The appellant does not dispute the Council’s planning history for the site.

    Based on the information before me, the original building would have been a small bungalow and the additions to date have approximately doubled the width of the original dwelling as well as making elements of it considerably deeper. These additions have created a significantly larger dwelling compared to the original.

    The proposed front dormer windows would be set below the ridge and set in from the eaves of the roof. Nevertheless, they would introduce new built form, creating a bulkier roof. The proposed rear dormer window would similarly add new built form at this level. The proposed hip to gable extensions would also add bulk to the roof. The proposed roof lights would be built within the roof slope and would not increase the size of the building. The proposed rear infill would increase the footprint of the dwelling, albeit this would be located between two existing features.

    The proposed additions to the dwelling would be relatively limited in scale but when taking into consideration the comparatively large scale of the extensions that have already been built, the cumulative effect of the proposal would result in disproportionate additions over and above the size of the original dwelling. Consequently, it would be inappropriate development in the Green Belt.

  6. Section 07

    Openness of the Green Belt

    The proposed rear dormer window and extensions to the rear would be screened from public view by the existing dwelling. The front dormer windows proposed and hip to gable additions at either end of the dwelling would introduce new built form and enlarge the dwelling at roof level, visible from the road, but would be within the existing footprint of the dwelling.

    As a result, the proposals would erode both the spatial and visual openness of the Green Belt, however only to a limited degree given their modest scale and the degree of screening.

  7. Section 08

    Other considerations

    The Framework sets out that inappropriate development is, by definition, harmful to the Green Belt and should not be approved except in very special circumstances. Substantial weight must be given to any harm to the Green Belt and very special circumstances will not exist unless the potential harm to the Green Belt by reason of inappropriateness, and any other harm resulting from the proposal, is clearly outweighed by other considerations.

    The appellant has identified a number of dwellings in the local area that are larger than the appeal property, some of which have recently been extended. For the purposes of Green Belt policy, the assessment of whether an extension would be disproportionate is however specific to each individual building and its particular circumstances, not whether the extended dwelling would be similar in scale to neighbouring properties. I have very little information about the other properties and how they came to be the size they are, or why any extensions were considered acceptable. Consequently, I cannot conclude that the circumstances were comparable to the appeal proposal, and these other properties do not therefore weigh in favour of this proposal.

    The proposal would provide opportunities to improve the energy efficiency and reduce the carbon footprint of the dwelling. This would be supported by national policy which seeks to support the transition to a low carbon future. Nevertheless, considering the limited benefits of what could be achieved through the improvements to this single dwelling, I give this limited weight.

  8. Section 09

    Whether very special circumstances exist

    The proposed development would cause harm to the Green Belt by reason of inappropriateness and reduction in openness and I attach substantial weight to those harms.

    The other considerations cited in support of the proposal do not either individually or cumulatively, clearly outweigh the harm to the Green Belt. Consequently, the very special circumstances necessary to justify inappropriate development in the Green Belt do not exist.

    Therefore, the proposal would conflict with LP Policy DM.22 and Green Belt policy set out in paragraphs 147-151 of the Framework.

  9. Section 10

    Conclusion and Recommendation

    Accordingly, the proposal would conflict with both local and national Green Belt policy and there are no material considerations that justify granting permission contrary to the development plan. For the reasons given above, and having had regard to all other matters raised, I recommend that the appeal should be dismissed.

  10. Section 11

    Inspector’s Decision

    I have considered all the submitted evidence and the Appeal Planning Officer’s report and, on that basis, I agree with the recommendation and shall dismiss the appeal.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 133No official casework-database value to compare
    Extracted decision date · page 1
    13 July 2022Matches the official casework database
    Extracted site visit dates
    7 June 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3293839
Application reference
21/0265/HOU
Lead case reference
Not recorded
Planning authority
Wyre Forest District Council
Planning authority code
E07000239

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
40 m²
Number of residences
0
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
25 February 2022
Valid date
25 February 2022
Start date
25 April 2022
Planning authority decision date
3 December 2021
Appeal decision date
13 July 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
17724
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21