Appeal 3293873
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the demolition of existing rear extension and new 8m rear extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
Under Article 3(1) and Schedule 2, Part 1, Class A of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (the GPDO) planning permission is granted for the enlargement of a dwellinghouse subject to limitations and conditions.
Where an application is made for a determination as to whether prior approval is required for development which exceeds the limits in paragraph A.1(f) but is allowed by paragraph A.1(g) to Part 1, paragraph A.4(3) provides that the local planning authority may refuse the application where it considers that the proposed development does not comply; or that the developer has provided insufficient information to enable the authority to establish whether the proposed development complies with the conditions, limitations or restrictions that are applicable to such permitted development.
In the case that the development is permitted development, paragraph A.4(7) to Part 1 requires the local planning authority to assess the impact of the proposed development on the amenity of all adjoining premises, taking into account any representations received. I have considered the appeal on that basis.
Section 04
[name]
The main issues are whether the proposed development would be permitted under the GPDO and if so the acceptability of the impact on the amenity of adjoining premises, having particular regard to outlook.
Section 05
Reasons
Development is not permitted by Schedule 2, Part 1, Class A, paragraph (g) (i) of the above Order if the enlarged part of the dwellinghouse would extend beyond a wall forming a rear elevation of the original dwellinghouse by more than 8m in the case of a detached dwellinghouse. The term ‘original’ is defined in the GPDO as that which existed on 1 July 1948 or, if built after that date, as so built.
The Council assert that the existing single storey projection to the rear of the property is an extension that projects from a part of the original house that was set behind the main rear elevation.
I observed during my site visit a variation in the brickwork to the side elevation of the dwelling, indicating to me that the rear wall of the original dwelling could have been altered at some point. I have not been presented with strong evidence to the contrary which demonstrates that the Council’s assertion is incorrect.
Based on the information before me it is therefore reasonable to conclude that the development would result in the enlargement of the dwellinghouse by more than 8m beyond the original rear wall. I therefore conclude that the proposed extension would not be permitted development under the above Order.
As the proposal does not constitute permitted development, it is not necessary for me to assess the impacts on the neighbouring living conditions, or the application of planning policy related to those matters.
Section 06
Conclusion
For the reasons given above, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 3016No official casework-database value to compare
- Extracted decision date · page 1
- 9 December 2022Matches the official casework database
- Extracted site visit dates
- 1 November 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3293873
- Application reference
- 21/03257/HPN
- Lead case reference
- Not recorded
- Planning authority
- Bedford Borough Council
- Planning authority code
- E06000055
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 3. Refused prior approval of permitted development rights
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 28 February 2022
- Valid date
- 28 February 2022
- Start date
- 6 April 2022
- Planning authority decision date
- 24 January 2022
- Appeal decision date
- 9 December 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 24857
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21