Appeal 3293990

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

5 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

extension of existing drop kerb (fast track service).

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for extension of existing drop kerb (fast track service) at [site address] in accordance with the terms of the application ref: 465/21 dated 18 November 2021, subject to the following conditions:

    The development to which this permission relates must be begun not later than the expiration of three years, beginning with the date of this decision;

    The development hereby permitted shall not be carried out otherwise than in complete accordance with the following approved plans: Unreferenced Location Plan, ZAAVIA/63CR/203 ([name]), ZAAVIA/63CR/204 ([name]) and ZAAVIA/63CR/206 (Proposed Site Plan).

  2. Section 03

    Main Issue

    The main issue is the impact of the proposal upon pedestrian safety.

  3. Section 04

    Reasons

    The appeal site is a two-storey terraced property within a residential area. The proposed extension of the existing drop kerb to allow for vehicular access would be 2.5 metres in width. This would result in a total width, including the existing drop kerb of 7.39 metres.

    At the time of my site visit I noted that the existing drop kerb at the appeal site is a shared, continuous, drop kerb with 57, 59 and [address] respectively. The Council’s delegated report states that his arrangement encourages vehicles to drive on the footway to avoid other vehicles and that no further extension of the continuous drop kerb should be considered in either direction. It is stated that this would compromise the safety of the existing limited pedestrian amenity.

    At the time of my site visit I noted that adjacent to the boundary of the appeal site there a fixed sign post on the footway which indicates the nearby junction with [address] as well as, slightly further down the road, bollards barrowing the road around the cycle lane. The road is straight and I found that it offered good visibility for all users and the appellant has provided evidence, in the form of crashmap, that there have been no incidents outside the appeal site for the twenty plus years across all casualty and vehicle types with the existing continuous dropped kerb arrangement.

    I find that the existing arrangement of the dropped kerb could already be deemed to limit pedestrian amenity as a result of already allowing vehicles to drive on the footway. Despite this I find that the presence of the sign post on the boundary of the appeal site would in fact prevent and discourage vehicles driving through/over the proposed extension to the dropped kerb itself due to its very close proximity. As a result this I do not find that the additional 2.5m proposed would, in this case, cause further safety issues with regard to pedestrian safety nor would it create an additional conflict point for pedestrians using the footway which would warrant refusal.

    I note comments from [name] that single units in this area should not have more than one space per dwelling, however, the reasoning or policy basis for this is not evidenced or clarified before me within this appeal. Further comments are made regarding drainage, however, the proposal to extend an existing dropped kerb is not one which I find would alter or impact upon the site in terms of existing drainage. There would be no additional hardstanding or surfacing as a result of the proposal me and the Council’s refusal reason is focused upon pedestrian safety which I have discussed above.

    The Council state that the proposal would be contrary to Redbridge Local Plan 2018 (LP) Policy LP22, however, I do not find that the policy is of direct relevance given that the proposal simply seeks to facilitate safe access to an existing property/property frontage. LP Policy LP22 seeks to promote sustainable transport and I do not see that an extended drop kerb would realistically change the site in terms of sustainable transport or vehicle movements. I note comments re: potential subdivision but that is not a current consideration within this appeal before me. I can only assess the proposal on the basis of the submission and not what may or may not be applied for in the future. Similarly LP Policy LP23 relates to cycle and car parking for new development meaning the policy is of limited direct relevance.

    Whilst the starting point for determination is the Local Plan in accordance with S38(6) of the Planning and Compulsory Purchase Act 2004 the National Planning Policy Framework 2021 (the Framework) is a material consideration. The proposal would be consistent with paragraph 110 b) of the Framework which seeks to ensure safe and suitable access can be achieved for all users and paragraph 111 which confirms that development should only be prevented or refused on highways grounds if there would be an unacceptable impact upon highway safety.

  4. Section 05

    Conclusion

    For the reasons outlined above, and taking account all other matters raised, I conclude that the appeal should be allowed subject to conditions.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 115No official casework-database value to compare
    Extracted decision date · page 1
    17 May 2022Matches the official casework database
    Extracted site visit dates
    22 April 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3293990
Application reference
4650/21
Lead case reference
Not recorded
Planning authority
London Borough of Redbridge
Planning authority code
E09000026

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
6 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
1 March 2022
Valid date
1 March 2022
Start date
17 March 2022
Planning authority decision date
23 December 2021
Appeal decision date
17 May 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
15326
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21