Appeal 3294159
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the installation an air source heat pump.
Section 02
Decision
The appeal is allowed and planning permission is granted for the installation of an air source heat pump at [site address] in accordance with the terms of application reference SMD/2021/0440, dated 15 December 2021, subject to the conditions set out in the Schedule at the end of my decision.
Section 03
Procedural Matters
The description of the appeal proposal given on the submitted planning application form involves elements which are not development. Therefore, I have shortened it to align with the description given on the Decision Notice which better describes the proposal.
Section 04
Main Issue
The impact to neighbouring living conditions having regard to noise.
Section 05
Reasons
The Council considered the application for planning permission leading to this appeal on the premise the proposal does not comply with the [name] (MCS) technical noise standards for permitted development.
Drawing on submitted plan document MCS 020 the Council comment in their officer report that a background noise level of 40dB(A) has been assumed. The air source heat pump (ASHP) proposed exceeds background noise levels by 9.5 dB(A) which is 7.5dB(A) above the prescribed MCS threshold level of 42dB(A).
They go on to calculate that noise arising from the ASHP would cause sound levels inside the nearest bedroom of the neighbouring property of around 34 dB(A). This being 4dB(A) above the prescribed maximum night time bedroom levels of 30dB(A) as set out in [name] 8233:2014 (BS). A key concern being the resultant impact of that would cause neighbouring occupiers potential sleep disturbance issues in a quiet village location, where lower background noise levels than those specified may be apparent.
In response, the appellant submits there is a misunderstanding from the Council in that the ASHP would not generate continuous noise throughout the night. Nonetheless, I do not discount noise emissions would not occur during the night when domestic need demand arises, particularly in colder months.
That said, the appellant also argues that the existing oil filled boiler is noisier in operation than the replacement system proposed. That assertion is made based on measurements taken from the external vent to the boiler being in the order of some 78.6dB(A).
Even though there is no detailed noise assessment available, I do not find the appellant’s measurements to be an unrealistic approximation of the likely external noise levels emitted by the current oil boiler heating system. That is mainly because older oil based domestic heating technology is often noisier in operation.
Likewise, it is important to note that any reduction below 78.6 dB(A) downwards to the estimated 49.5dB(A) of the proposed ASHP would still constitute a beneficial reduction in overall operating noise levels. I therefore give substantial weight to the circumstances regarding the existing boiler system being noisier when in operation compared to the ASHP proposed.
Whilst the appeal property lies within a small rural village and a cul de sac, I could see at my site visit that it is not far from a nearby school. As a result, it is conceivable that there would be some elevated background noise at various times of the day.
The appellant refers me to six other air source heat pumps installed in [address] since 2013 and that there have been no complaints to those. He also identifies ASHPs on nearby dwellings with stated noise levels of 48.4dB(A) not causing any complaint. That noise level figure is not challenged by the Council as being inaccurate.
Moreover, planning permission for ASHP’s is also referred to by the Council as being consented under application references 13/00848/FUL and SMD/2013/0913. Though further technical details are not elaborated upon, they do not suggest those installations have been subject to significant noise complaints since their installation and long established subsequent use. Indeed, there is positive support for the scheme believed to be from the occupier of no.23, as a further indication of whether a local sensitivity to any known noise problems is apparent.
Bringing all of the above points together, a noise level of 4dB(A) above the BS threshold would be marginal in nature. In any event, the proposed ASHP has a strong likelihood to offer a significant improvement by way of reduced noise levels during its operation in the day and at night compared to the existing domestic heating system.
I appreciate that distance, timings and duration effects could have been made clearer by way of a noise assessment but none has been evidenced as being formally requested. Overall, I find that the likelihood of overall reduced noise level benefits to be credible in this case.
Accordingly, I do not find resultant noise impacts would erode from existing living conditions by an unacceptable degree. The appeal development complies with Policies SS1, SD2 and SD3 of the Staffordshire Moorlands Local Plan 2020 which all combined promote sustainable forms of development including renewable and low carbon energy generation as well as the protection of living conditions from harm. It accords with the objectives of the National Planning Policy Framework replicating those aims.
Section 06
Conditions
I have attached standard conditions relating to the time limit for implementation and linking the appeal decision to the plan information provided.
Section 07
Conclusion
For the reasons set out above the appeal succeeds.
Section 08
Schedule of conditions
The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
The development hereby approved shall be carried out in accordance with the following plans/documents: Site Location Plan Scale 1:1250; drawing titled ‘[name], [name] 1’; and plan document MCS 020.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1926No official casework-database value to compare
- Extracted site visit dates
- 12 July 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3294159
- Application reference
- SMD/2021/0440
- Lead case reference
- Not recorded
- Planning authority
- Staffordshire Moorlands District Council
- Planning authority code
- E07000198
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 1 m²
- Number of residences
- 1
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 3 March 2022
- Valid date
- 9 March 2022
- Start date
- 7 June 2022
- Planning authority decision date
- 15 December 2021
- Appeal decision date
- 27 July 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 18406
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21