Appeal 3294444
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
to raise the roof line of the existing bungalow to form bedrooms and a 2 storey extension to the rear.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary matter
The appellant has submitted a set of amended plans with the appeal, which his agent has circulated for comment. A set of neighbour responses is also provided. The appeal is, however, proceeding by the [name] method, as outlined in [name] of the Procedural Guide – Planning Appeals – England. This method does not allow for any further representations either by the Council or by neighbours and the informal round of consultations carried out by the appellant is not an adequate substitute for public consultation by a local authority. The introduction of these new, amended plans would therefore be prejudicial to participation in the appeal process. I must base this decision on the application plans considered by the Council.
Section 04
Main issues
The main issues are the effects of the proposal on: (i) the character and appearance of [address]; and (ii) living conditions at neighbouring properties, in terms of outlook and privacy.
Section 05
Character and appearance
[address] as a whole contains both houses and bungalows, No 56 sits within a section of the street which is lined on both sides by low bungalows of fairly uniform design, all with hipped roofs at the front. No 56 is typical in this respect. The proposal would raise the roof, convert the front roof hip to a gable and add 2 large, blank dormer features to the side roof slopes in order to provide upper floor accommodation. It would also add a 1.5 storey gabled extension at the back – not a full 2 storey extension as stated above because the eaves level would be kept low - with a covered first floor balcony at the back.
The existing bungalows, though simple in form and architecture, are not without charm. Together they form an attractive group, with a character that various extensions and alterations have largely left intact. These changes have included the conversion of roofspaces and some 1.5 storey rear extensions, as at No 58 next door.
Although the proposed small increase in roof height and the rear extension on their own would not be notable in the street scene, the front gable and blank side dormers would be overly bulky and awkward. I saw no other similar features on this group of bungalows. These aspects of the proposal would be seriously out of character with the existing bungalows and would disrupt the harmony of the street scene. The Council also mentions the loss of the existing chimney, but many of the other bungalows here do not have chimneys so I see no objection to that minor aspect of the proposal.
I conclude that, mainly due to the proposed front gable and dormers, the proposal as a whole would unacceptably harm the character and appearance of this part of [address]. It therefore conflicts with the aims of Core Policy 57 of the [name] (CS), the Council’s design guidance [name], the National Planning Policy Framework and the National Design Guide, to secure a high standard of design which enhances local distinctiveness and responds positively to the existing townscape.
Section 06
Living conditions
The proposed rear extension, including the covered balcony, would stretch well to the rear of the bungalow at No 54 next door, which has a side facing glazed projection near the back that would look directly out onto the extension at very close range. In the absence of any information about whether this serves a habitable room I have to assume that it does. The side wall and roof of the proposed rear extension would be highly dominant and intrusive on the outlook from this glazing. It would furthermore also dominate, to a lesser but still significant extent, views from the area of garden immediately to the rear of No 54. I therefore find that the proposal would be unduly overbearing on the outlook from No 54.
The rear extension would project slightly further than the existing rear extension to No 58. That bungalow does not have any side facing windows to be affected, however, and the amount of additional depth is not significant, so that the proposal would not be overbearing on any views from that property.
Some sideways views from the proposed balcony would be limited by a roof overhang, but the balcony would still provide close range views of much of the neighbouring gardens from an elevated position. A degree of mutual overlooking is normal within urban areas, but balconies like this provide wider ranging and more intrusive views than ordinary windows. I find that the proposed balcony would unduly harm the privacy of the next door neighbours at Nos 54 and 58.
I conclude that the proposal would unacceptably harm living conditions at neighbouring properties, in terms of outlook and privacy. It therefore also conflicts with the aim of CS Core Policy 57 to ensure a high standard of design in regard to the impact on the amenities of existing occupants.
I have considered all other matters raised. In particular, I note that the construction of the extension would bring some minor benefits to the local economy and that the project could improve the energy efficiency of the bungalow. The new front gable window would add some additional natural surveillance of the street, bringing a marginal benefit in terms of public safety and security. These other points are not of sufficient importance to outweigh my findings in regard to the main issue, however.
Section 07
Conclusion
For the reasons set out above, I conclude that the appeal should not succeed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 890No official casework-database value to compare
- Extracted decision date · page 1
- 21 September 2022Matches the official casework database
- Extracted site visit dates
- 22 August 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3294444
- Application reference
- PL/2021/10613
- Lead case reference
- Not recorded
- Planning authority
- Wiltshire Council
- Planning authority code
- E06000054
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 8 March 2022
- Valid date
- 23 March 2022
- Start date
- 19 April 2022
- Planning authority decision date
- 12 January 2022
- Appeal decision date
- 21 September 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 20798
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21