Appeal 3294511
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the removal of conservatory and outhouse and in their place erection of two-storey extension.
Section 02
Decision
The appeal is allowed and planning permission is granted for the removal of conservatory and outhouse and in their place erection of two-storey extension at [site address] , [address], Patching, Worthing, [postcode] in accordance with the terms of the application [name]/21/05392/HOUS, dated 25 October 2021, subject to the conditions set out in the attached Schedule.
Section 03
Preliminary matters
The comprehensive officer report deals with several matters of significance including the principle of development1; the proposal’s compliance with local policy designed to avoid the loss of small to medium sized dwellings; the effect on neighbouring living conditions; impact on dark night skies, and ecology. The NPA considers in these respects that subject to appropriate mitigation, the proposal would be acceptable. I have no reason to disagree with the NPA’s assessment on these issues, and therefore I need not consider them further.
Section 04
Main issue
Having regard to the above, and the thrust of the NPA’s sole reason for refusal, the main issue is the effect of the proposal on the character and appearance of the host property and its surroundings.
Section 05
Reasons
The appeal property is one of a pair of semi-detached dwellings, and another pair is sited closely to the east. The dwelling, on rising ground, is reached by a track which runs through a sizeable group of buildings, which appear to include farm buildings, commercial workshops and other dwellings. Close to the appeal 1 Having regard to the property’s location outside a designated settlement boundary property’s boundaries are several sets of stables, including a commercial livery. To the west of the appeal property, but removed from it, a public right of way (PROW) runs north-south, through gated or stiled paddocks.
A full description of the property and its attached neighbour is provided in the Design and [name], and this is largely repeated in the officer report. The pair was built as farm workers cottages at the turn of the 19/20th century. They are not designated as local heritage assets, but the NPA, notwithstanding the more recent ground floor additions to both properties, consider them to comprise reasonably good examples of [name] character cottages found within the Park.
I share the NPA’s view that some features make the cottages attractive, including the balanced disposition of prominent gables, chimneys, materials and roof shapes. However, the original appearance and distinction of the pair has been considerably devalued over time in particular by the substantial, ill-fitting additions at the front and side, and the introduction of inappropriate fenestration materials.
I view the removal of the conservatory at the side of the dwelling as a considerable benefit of the scheme and the outbuilding’s removal as proposed would reduce the level of local clutter.
To my mind, the extension’s design pays particular regard to and respects the original features of the host property. The reduced ridge height, proposed gable treatment, and the ‘T’ shape of the extension would in my view ensure that it would be read as an acceptably designed proportionate addition, and not perceived as creating a terracing effect as feared by the NPA. Whilst noting the NPA’s comments on symmetry, that quality has already been significantly eroded by the more modern additions.
The proposed gable in the west elevation and its associated well-proportioned fenestration would act as an attractive, well-designed replacement for the extant conservatory.
I walked part of the PROW to the west, and noted that views of the dwelling are partially curtailed by the presence of intervening buildings. From those vantage points where the extension would be clearly seen, I strongly suspect that it would be perceived by most people as entirely acceptable in terms of scale and design.
The Framework2 provides that great weight should be given to conserving and enhancing landscape and scenic beauty in National Parks, and that the scale and extent of development within the Parks should be limited. I am satisfied that the scale of the proposed development is so modest and limited that it would not harm the scenic beauty of the Park, whose landscape would therefore be conserved.
I conclude that the proposed development would sit acceptably in its visual and spatial context without harming the character and appearance of the host property or its surroundings. Accordingly, I find no conflict with those provisions of policies SD4, SD5 and SD31 of the South Downs Local Plan 2014- 2 National Planning Policy Framework 2 2033, and policy PLACES 5 of the Patching Neighbourhood Development Plan (2018) directed to ensuring that development, including house extensions, is of a high quality of design and that the Parks landscape is conserved.
Section 06
Conditions
I shall impose the standard conditions in respect of materials and the approved plan references in the interests of visual amenity and certainty. The NPA has suggested 3 additional conditions in relation to [name], [name] mitigation and [name]. I consider all three to be necessary and relevant, and are therefore imposed, albeit in a slightly modified manner, for the same reasons as provided by the NPA.
Section 07
Other matters
I have taken account of all other matters raised in the representations but none outweighs those considerations which led me to my conclusions.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2949No official casework-database value to compare
- Extracted decision date · page 1
- 26 July 2022Matches the official casework database
- Extracted site visit dates
- 7 June 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3294511
- Application reference
- SDNP/21/05392/HOUS
- Lead case reference
- Not recorded
- Planning authority
- South Downs
- Planning authority code
- E26000010
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 64 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 9 March 2022
- Valid date
- 9 March 2022
- Start date
- 21 March 2022
- Planning authority decision date
- 22 December 2021
- Appeal decision date
- 26 July 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 18362
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21