Appeal 3294875

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the erection of a single storey rear extension at first floor level.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the erection of a single storey rear extension at first floor level at [site address] in accordance with the terms of the application, Ref BH2021/04348, dated 18 November 2021, subject to the following conditions:

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.

    The development hereby permitted shall be carried out in accordance with the following approved plans: 2603 01 & 03.

  2. Section 03

    [name]

    I use the Council’s description of development which is more precise than the application form; I note the Appellant also uses this on the appeal form.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposal on the character and appearance of the host property and locality.

  4. Section 05

    Character and appearance

    The appeal property is a single storey dwelling on the north side of [address] North with a ground floor rear extension, and a rear dormer on a gable ended roof. It is on a sizeable rectangular plot. Neighbouring properties immediately to the east, and frequently elsewhere in the street, are two storey dwellings. The style of building on the street is varied in terms of size, design, orientation and building-lines to the front and rear. This is an area where a characteristic is of significant extension and re-modelling works to original homes whilst the street maintains its residential character and generally pleasing appearance through the range of buildings and garden areas. The proposal is as described above.

    The Council expresses the concern that the extension, along with other previous works, would represent overdevelopment of the property at variance from the style and appearance of the original building and out of character with other local buildings. There is some debate, which I will not enter, concerning the planning status of previous works to the property including hip to gable change and rear works; my assessment is of the composite plans before me as determined by the Council.

    The appeal scheme in combination with other works would clearly represent a significant change from the original property. However, purely in terms of massing and volume, bearing in mind the size of the plot and scale of other homes around, I would not class the scheme as overdevelopment. The site and the locality can in practical and visual terms absorb this quantum of built form.

    In terms of the appearance of this massing I am satisfied that the streetscene would not be harmed as front elevations would continue to be unremarkable relative to its wider setting and with a design and scale that would not be visually jarring. It would differ from the original frontage but, as in this case, preservation of past appearance is not always necessary to safeguard the qualities of a streetscene.

    The flat roofed first floor rear extension embodied in the appeal scheme appears from the submitted drawings to be potentially ungainly and well removed from the original pitched roof form. However, the situation on the ground is more ‘forgiving’ than the two-dimensional plans would suggest. I recognise that this would not be the ‘subservient’ style extension one would often seek but more radical re-modelling of a dwelling should not always be ruled out if accommodation can be provided which is benign in aesthetic terms. To my mind this would be one such example. Unlike on the plans, the side elevations would not be open to wide viewing and I have deemed the street frontage to be acceptable as a (changed) pitched roof home. The rear of this stretch of dwellings has a marked flat roofed characteristic and this appeal scheme would not stand out as being appreciably different in that context. Indeed, the works would not project as far into garden space and northwards as the appreciable built form immediately alongside found on the two neighbouring homes; there would be compatible ‘containment’.

    In summary the specific circumstances on this site and in this immediate context satisfy me that character and appearance would be safeguarded were the somewhat unusual appeal scheme to progress.

    Brighton and Hove Local Plan Saved Policy QD14 and Brighton and Hove City Plan Part 2 Policy DM21 are relevant. Taken together and amongst other matters they call for roof alterations and extensions to be well designed in suitable materials and spatially appropriate, all taking account of the character of the area. Given the foregoing I would conclude that the appeal scheme would not run contrary to these policies. 2

  5. Section 06

    Conditions

    The Council suggests the standard commencement condition along with the requirement for materials to match the existing building. I would agree with the latter in the interests of visual amenity. I also agree that there should be a condition that works are to be carried out in accordance with listed, approved, plans; to provide certainty.

  6. Section 07

    Overall conclusion

    For the reasons given above I conclude that the appeal proposal would not have unacceptable effects on the character and appearance of the host property and the locality. Accordingly, the appeal is allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 352No official casework-database value to compare
    Extracted decision date · page 1
    29 July 2022Matches the official casework database
    Extracted site visit dates
    30 June 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3294875
Application reference
BH2021/04348
Lead case reference
Not recorded
Planning authority
Brighton and Hove City Council
Planning authority code
E06000043

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
36 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
15 March 2022
Valid date
21 March 2022
Start date
29 March 2022
Planning authority decision date
28 January 2022
Appeal decision date
29 July 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
18570
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21