Appeal 3295164
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as a single storey rear and side extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary matter
The appellant has not submitted any grounds of appeal. Accordingly, I confirm that, as required by planning law, this appeal has been determined in accordance with the development plan, other than where material considerations dictate otherwise.
In their decision letter the council refers to policies SP2, DMD1 and DMD6 of the London Borough of Barking & Dagenham’s Draft Local Plan (Regulation 19 [name], October 2020). However, these policies have been superseded by policies SP2, DMD1 and DMD6 of the London Borough of Barking & Dagenham’s Draft Local Plan (Regulation 19 [name], Autumn
([name]). In relation to the determination of this appeal the content of the updated draft policies has not materially changed and are consistent with the adopted development plan policies.
Section 04
Main Issue
The main issue is the effect of the proposal on the character and appearance of the existing dwelling, the street scene and the [name].
Section 05
Reasons
The Becontree Estate is a residential area, which was developed between 1921 and 1934 as part of the Homes for Heros initiative following the First World War. The estate is primarily characterised by uniformly sited and designed terraced and semi-detached two storey houses with uncluttered front elevations under fully hipped roofs, with chimneys.
The buildings are separated from each other by generous sized gaps and the individual dwellings have varied sized rear gardens. Some of these gaps have been partially filled with a combination of single and two storey extensions, which are generally set back from the front building lines of the host dwellings.
The dwellings sit back from the highway behind modest sized front gardens. Some of the front gardens are soft landscaped and enclosed by low hedges, fences and walls. Others now have vehicle crossovers and are hard surfaced. The corner dwellings occupy particularly wide plots which respect the front building lines of the houses in the adjoining roads. This adds to the sense of uniformity and to the spacious suburban character and appearance of the estate.
The appeal dwelling occupies a wide plot in a prominent corner position adjacent to the junction of [address] and [address]. The appeal dwelling’s side elevation aligns with the front building lines of the dwellings on the west side of [address] and the width of its side garden mirrors that of the dwelling directly opposite at [address].
The appeal dwelling comprises one of pair of modest sized and symmetrically designed semi-detached houses. They both have flat and uncluttered elevations under a fully hipped roof. The exterior walls of the appeal dwelling are rendered and painted white, above a black painted plinth. The adjoining dwelling is clad with dark painted timber boarding above a black painted plinth. It has a part single/part two storey side/rear extension. The first floor element of the side extension is set back from the front elevation of the original dwelling and its walls are rendered and painted white.
Collectively and amongst other things paragraph 130 of the National Planning Policy Framework (the Framework), policies D1, D4 & D8 of the London Plan, policies CP2 & CP3 of the Barking & Dagenham Local Development Framework (LDF) Core strategy 2010 (CS) and policy BP11 of the LDF Borough Wide Development Plan Document (DPD), require new development to be designed to a high quality and to reinforce local distinctiveness within the public realm. New development should respect and strengthen local character and provide a strong sense of place. It should be suitably designed within the context of its setting and relate appropriately to the surrounding area. DPD policy BP2 seeks to preserve, reinstate and enhance the distinctive and historic features of the [name].
The Council’s Residential Extensions and Alterations Supplementary Planning Document 2012 (SPD), advises that extensions should be sympathetic and should not unbalance the original dwelling. Extensions should respect the existing roof, fenestration and external materials and side extensions should reflect the existing house type and the type of plot. The character of semi-detached houses is partly derived from the symmetry of the pair of dwellings. As such, extensions should appear subordinate to the host dwelling.
In relation to the consideration of the appeal proposal, policies SP2, DMD1 and DMD6 of the London Borough of Barking & Dagenham’s Draft Local Plan (Regulation 19 [name], Autumn 2021) ([name]), are consistent with the above policies and advice. Draft LP Policy DMD6 states that residential extensions should be sympathetic and subordinate to the host dwelling in relation to scale, form, materials and detailing.
The vast majority of gardens to the sides of corner plots have been retained. Those that have been developed with extensions and outbuildings or enclosed by high fencing have had an enclosing impact on the street scene and have blended into the street scene with varying degrees of success. This has been dependant on the size of any retained gaps and the size, proportions, form and design of the outbuildings and extensions concerned. Rather than set a precedent they serve to reinforce the need to assess each proposal on its planning merits and in light of the prevailing planning policies.
The front section of the land to the side of the appeal site has been hard surfaced and is used for parking. The remainder has been enclosed by tall fencing. This has had an urbanising and enclosing impact on the street scene, although the sense of space is retained above the fencing.
The flank wall of the proposed extension would be two metres from the boundary with the highway and the wide flank wall and roofs of the proposed extension would be clearly visible above the side boundary fence. Where it adjoins the existing dwelling the proposed extension would have a shallow mono-pitched pitched roof and to the rear of the host dwelling would have an almost flat roof. There would be no openings in the flank elevation and on the front elevation there would be a single window which would have different proportions of those of the existing windows on the front elevation.
Due to its combined width, depth and roof design the relationship between the existing rear conservatory and the proposed rear extension would be visually awkward, poorly proportioned and designed.
As a result of these factors the proposed extension would appear squat, utilitarian and uncharacteristically deep and wide. It would fail to respect the existing house type and would be neither sympathetic nor subordinate in relation to the scale, form, materials and detailing of the host dwelling. The proposed extension would materially detract from the character and appearance of the host dwelling and the pair of semi-detached dwellings. It would also have a enclosing impact on the area around the street junction and would fail to respect local character or relate appropriately to the surrounding area.
Overall, the harm that would be caused by the proposal would outweigh the benefits for the appellant and their family that would result from the additional living accommodation. This harm could not be satisfactorily overcome by the imposition of conditions.
I conclude that the proposal would unacceptably harm the character and appearance of the host dwelling, the street scene and the [name]. It would therefore conflict with London Plan Policies D1, D4 & D8, [name] CP2 & CP3, [name] BP2 BP11, the SPD, [name] SP2, DMD1 & DMD6 and paragraph 130 of the Framework.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1220No official casework-database value to compare
- Extracted decision date · page 1
- 14 September 2022Matches the official casework database
- Extracted site visit dates
- 8 September 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3295164
- Application reference
- 21/02158/HSE
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Barking and Dagenham Council
- Planning authority code
- E09000002
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 40 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 19 March 2022
- Valid date
- 18 April 2022
- Start date
- 4 May 2022
- Planning authority decision date
- 24 January 2022
- Appeal decision date
- 14 September 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 20586
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21