Skip to main content
Official casework recordDismissedCurrent release

Appeal 3295523

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

11 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the demolition of an existing outbuilding and construction of a new outbuilding.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Appeal Procedure

    The site visit was undertaken by an Appeal Planning Officer whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.

  3. Section 04

    [name]

    The appeal site is within the Green Belt and therefore the main issues are: • whether the proposal constitutes inappropriate development in the Green Belt for the purposes of the National Planning Policy Framework (the Framework) and development plan policies; • the effect of the proposal on the openness of the Green Belt; • the effect of the proposal on the character of the adjacent Ancient Woodland; and, • would the harm by reason of inappropriateness, and any other harm, be clearly outweighed by other considerations so as to amount to the very special circumstances required to justify the proposal.

  4. Section 05

    Reasons for the Recommendation

    The appeal site is a large dwelling set within a very generous and secluded plot that is surrounded by mature vegetation, including Ancient Woodland. In the immediate vicinity of the main dwelling are traditional landscaped gardens and lawns, a patio and a swimming pool. There is a lawn space to the rear of the dwelling which forms a broader part of land that rises towards the northern boundary of the plot. A significant distance to the south of the house is a tennis court with an adjacent modest outbuilding; the surroundings have a more open character formed by mature trees and grassed areas. To the south of the tennis court, the land drops sharply down to the southern boundary of the plot, which is marked by an increased density of vegetation, and which the appellants have indicated is Ancient Woodland.

    The proposed development is an outbuilding that would replace the existing modest outbuilding that is adjacent to the tennis court. The proposal would have an increased footprint and height and would provide both storage and recreational space. There is a Certificate of Lawful Development1 for an outbuilding of the same size and design that could be built close to the appeal dwelling, on the lawn to its north.

  5. Section 06

    Whether there would be inappropriate development in the Green Belt

    Paragraph 147 of the Framework establishes that inappropriate development is, by definition, harmful to the Green Belt and should not be approved except in very special circumstances. Paragraph 149 outlines that the construction of new buildings should be regarded as inappropriate, save for a number of exceptions. One of these is the replacement of a building, provided the new building is in the same use and not materially larger than the one it replaces.

    The existing outbuilding measures approximately 5.28 metres in length by 3.07 metres in width and has a maximum height of 3.6 metres. In contrast the proposed outbuilding would measure approximately 10.8 metres in length by 6.3 metres in width and have a maximum height of 4 metres, representing a size increase of approximately 314%. While the proposal would have the same use as the outbuilding it would replace, its size would be materially larger.

    As such, the proposal would constitute inappropriate development in the Green Belt. It would, therefore, conflict with Policy RE2 of the Waverley Borough Local Plan Part 1: [name] and Sites, adopted February 2018, which seeks to prevent inappropriate development in the Green Belt.

  6. Section 07

    Openness

    Paragraph 137 of the Framework sets out that the fundamental aim of Green Belt policy is to prevent urban sprawl by keeping land permanently open; the essential characteristics of Green Belts are their openness and their permanence. The effect of a development on the openness of the Green Belt has a spatial aspect as well as a visual aspect.

    The existing modest outbuilding would be replaced with a structure that has a materially larger footprint and increased height, and so the proposal would encroach upon the openness of the Green Belt to some extent. Given its significant distance from the main dwelling, the proposal would be viewed against the surrounding mature vegetation and open grassed areas. Its position next to the existing tennis court would reduce its impact on openness to a small degree. Nevertheless, the court’s mesh fence and open paved area more successfully maintains the open appearance of this area than the large and solid built form of the proposed outbuilding.

    As such, the proposal’s substantial size and visual separation from the main dwelling would harm the openness of the Green Belt, albeit the impact would be somewhat reduced by its relationship with the existing tennis court. 1 [name]: WA/2021/01422

  7. Section 08

    Ancient Woodland

    The proposed outbuilding would be located around 4 metres from the Ancient Woodland boundary. The appeal scheme is materially larger than the existing outbuilding and so there would be a small effect on the character of the Ancient Woodland. This effect, however, would not be harmful as the proposal would clearly relate to the adjacent tennis courts and the sharp drop in the land from the court area to the Ancient Woodland boundary would maintain a sufficient degree of visual separation.

    Given the above, the proposal would not result in harm to the character and appearance of the Ancient Woodland. It would accord with Policy NE2 of the Waverley Borough Local Plan Part 1: [name] and Sites which seeks to maintain and enhance woodland within the Borough.

  8. Section 09

    [name]

    The approved scheme for an outbuilding to the immediate north of the main dwelling, with the same dimensions and design as the proposal, is both a realistic and viable alternative to the appeal scheme. While the appeal and permitted development schemes are similar in design, their respective positions within the plot would have different impacts on the openness of the Green Belt. The permitted development scheme would have a close visual relationship to the main dwelling and would be viewed in the wider domestic context of the house and its landscaped gardens. Its secluded location behind the house would also result in very limited views from the wider grounds.

    As mentioned above, the appeal scheme would be located a significant distance from the main dwelling and within a wider context of mature trees and grass space. The implementation of the appeal scheme, including the removal of the existing outbuilding, would result in an overall reduction in built forms at the site when compared to the erection of the permitted development scheme. However, considerations of openness are not purely related to size and volume but also the visual and spatial context of the development. As such, there would be greater harm to openness from the proposal than the permitted development scheme and so I give this fall-back position modest weight.

    It has been suggested that a condition could be used to remove permitted development rights under Class E under Article 3(1) and Schedule 2, Part 1 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). Class E permits the construction of outbuildings provided they would not be situated on land forwards of a wall forming the principal elevation of the original dwellinghouse. In this instance, this would only apply to a small area of the total plot and so the associated benefits of removing permitted development rights in this area would be limited. Therefore, I give this matter limited weight.

    It has also been suggested that a planning condition could be imposed to prevent both the appeal scheme and the permitted development scheme from being implemented together. As outlined above, the proposal would result in greater harm to openness than the permitted development scheme and so putting a mechanism in place to prevent the implementation of both schemes would not mitigate this harm. As such, I give this matter very limited weight.

    The outbuilding would provide storage and recreational space for the appellants. This is a private benefit which could be achieved through a less harmful scheme. I therefore give this matter modest weight.

  9. Section 10

    Conclusion and Recommendation

    The proposal constitutes inappropriate development in the Green Belt which is, by definition, harmful to the Green Belt. The harm to openness is also added to this harm. The lack of harm identified against the character and appearance of the Ancient Woodland is a neutral matter that does not carry any positive weight. Paragraph 148 of the Framework specifies that substantial weight should be given to any harm to the Green Belt and that very special circumstances will not exist unless the potential harm to the Green Belt is clearly outweighed by other considerations. As mentioned above, the other considerations, even taken in their totality, do not carry significant positive weight and so do not clearly outweigh the harm identified. As such, the very special circumstances that would be needed to justify the proposal do not exist.

    The proposed development would not accord with the development plan, when considered as a whole. Based on the above, and having regard to all matters raised, I recommend that the appeal should be dismissed.

  10. Section 11

    Inspector’s Decision

    I have considered all the submitted evidence and the Appeal Planning Officer’s report and on that basis the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 859No official casework-database value to compare
    Extracted decision date · page 1
    11 November 2022Matches the official casework database
    Extracted site visit dates
    11 October 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3295523
Application reference
WA/2021/02606
Lead case reference
Not recorded
Planning authority
Waverley Borough Council
Planning authority code
E07000216

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
68 m²
Number of residences
1
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
24 March 2022
Valid date
24 March 2022
Start date
27 April 2022
Planning authority decision date
4 January 2022
Appeal decision date
11 November 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
23388
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21