Skip to main content
Official casework recordDismissedCurrent release

Appeal 3295781

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the construction of a new 2 storey front and side extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main Issue

    The main issue is the effect of the proposed extension on the character and appearance of the host dwelling and the surrounding area.

  3. Section 04

    Reasons

    The appeal property is a modern two-storey family-sized detached dwelling within a housing development that is being built out. The property lies in a prominent position at the edge of the housing development next to the Peak Forest Tramway, a public bridleway, and on the corner of [address]. Beyond the bridleway is open countryside. The property occupies an ‘L’ shape footprint with a single-storey hipped roof garage set forward of the main body of the dwelling. One half of the original garage has been converted to a home office. A garden wraps around the property to the side and rear.

    Other dwellings within the housing development reflect the characteristics of the appeal property in terms of its scale, massing, design and the use of materials, though some properties have been finished in render. The host dwelling’s garage projects forward of the principal elevation’s building line. However, it is a harmonious subordinate part of the dwelling on the corner of the road.

    The proposed extension would step down from the host dwelling, but it would be of a considerable scale and massing. The proposed eaves and ridge heights strongly influence this. Collectively, the effect would, when allied with its position forward of the principal elevation of the host dwelling and the front elevation’s visual appearance, result in a dominant form of development to the front and side of the host dwelling and next to the bridleway. This would be of a far greater overall scale and massing than the existing single storey element. Furthermore, the proposed extension would introduce built form of a scale and mass into a gap between the dwelling and the bridleway. Gaps are characteristically maintained where parts of the housing development adjoin the bridleway. This would lead to significant harm when viewed from [address] and the bridleway in either direction given the dwelling’s prominent location. As such, I do not consider the proposal, which was amended by the appellant to address Officer concerns, to be well designed or of a high quality that responds positively to the host dwelling or its local environment.

    The appeal scheme seeks to make effective use of land, provide a flexible living space for the occupants, and add further soft landscaping whilst omitting the flank boundary fence. Matching materials and roof pitches are proposed whilst the elevations facing [address] and the bridleway would contain window openings. However, even if these aspects accord with local or national policies, they do not outweigh the appeal scheme’s effect in design terms and the harm that would be caused when the proposed extension is considered in the round.

    I therefore conclude that the proposed extension would conflict with Policies S1 and EQ6 of the [site address] Local Plan (Local Plan), The [site address] Borough Council Design Guide and The Residential Design Supplementary Planning Document (SPD 2). Jointly these seek, among other things, development to be informed by the surrounding built environment and positively contribute to an area’s character in terms of scale, height, layout, appearance and materials and to harmonise with the parent building. The proposal would also not accord with Local Plan Policy S1a as the extension would not represent sustainable development. Given my findings, the proposal would not accord with paragraph 130 of the National Planning Policy Framework (the Framework).

  4. Section 05

    Other Matters

    A representation from [address] is said by the occupiers to be from a person who doesn’t live at [address]. Even so, I have considered the points raised and I do not consider the proposal would result in harm to neighbouring occupants’ living conditions and there would be some modest biodiversity benefit. Furthermore, there would also be a modest improvement to natural surveillance, but these matters alter or outweigh the significant harm that the proposal would cause to the character and appearance of the host building or the surrounding area.

    I note the appellant’s efforts in discussing the proposal with neighbours and the housing developer before submitting the planning application to the Council, and while there have not been any objections on design grounds, I have considered the appeal based on its own planning merits. The alleged lack of engagement by the Council with the appellant does not alter my conclusion.

    Despite the appellant’s willingness to discuss the [address] elevation further to improve it, it is open to the appellant to submit a fresh planning application with any revisions to the Council in the first instance to assess.

  5. Section 06

    Conclusion

    The proposal does not accord with the development plan as a whole and there are no other considerations, including the Framework, that indicate that I should take a different decision other than in accordance with this.

    For the reasons given above, I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 245No official casework-database value to compare
    Extracted decision date · page 1
    13 May 2022Matches the official casework database
    Extracted site visit dates
    27 April 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3295781
Application reference
HPK/2021/0715
Lead case reference
Not recorded
Planning authority
High Peak Borough Council
Planning authority code
E07000037

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
114 m²
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
28 March 2022
Valid date
28 March 2022
Start date
5 April 2022
Planning authority decision date
15 February 2022
Appeal decision date
13 May 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
15194
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21