Appeal 3296805
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
construction of first floor side extension including replacement of existing roof.
Section 02
Decision
The appeal is allowed and planning permission is granted for construction of first floor side extension including replacement of existing roof at [site address] in accordance with the terms of the application, Ref 21/09935/FU, dated 8 December 2021, and the plans submitted with it, subject to the following conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: 201 and 203 E.
No development comprising of the erection, installation or provision of any external walling, roof slate, rainwater good, window or meter cupboard shall take place until details or samples of their material, appearance and colour finish have been submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved details/samples and shall be retained as such.
Section 03
[name]
The main issues are: • The effect of the proposed development upon the character and appearance of the host property and the Far Headingley Conservation Area; and • The effect of the proposed development on the living conditions of the occupants of properties on [name].
Section 04
Character and appearance
[name] comprise of a row of terraced properties with No 1 being situated at one end. A two-storey element of No 1 is lower than the remainder of the terrace and is connected to it by a single storey section. The site is located within the Far Headingley Conservation Area (CA). Defining characteristics of the CA as a whole include the contrast between the tight-knit settlement form of the village core with the later developed and more regular pattern of villas and terraces, the landmark building of [name] and the presence of tree-lined roads and large garden plots. The property, and those which adjoin at [name] and [name] are examples of the houses arranged in the tightly-knit manner and for this reason contribute to the significance of this part of the CA.
Though the proposed first floor extension would raise the existing single storey so that the ridge and eaves of the roof would match that of the two-storey element, the step up in height to the rest of the terrace would remain, emphasised further by the adjoining house having a chimney. The ridges of the existing two storey roof and that which would be formed by the extension would run in opposite directions. These factors would ensure that the host property would remain a subservient part of the wider terrace whilst the roofscape would benefit from variation and the mass being broken up.
Rainwater goods and an external meter cupboard are referenced on the plans and on my visit I noted that the existing property frontage already features, amongst other paraphernalia, pipework, vents and security lighting whilst prominent rainwater goods are a characteristic of several of the terrace and cottage properties in the immediate area. Subject to appropriate final finish choices, which can be controlled via condition, such features, together with matching stone and roofing material, would be acceptable.
I note that trees are located close-by to the development. The Council have stated that trees would not be harmed as a result of the development and I have no substantive evidence before me to indicate otherwise.
I find the extension proposed is acceptably designed, would remain respectful to the host property, neighbouring buildings, local distinctiveness and in turn preserve the character and appearance of the CA. It follows that the development accords with policies P10 and P11 of the Leeds City Core Strategy 2014, as amended (CS) and policies GP5 and BD6 of the Leeds Unitary Development Plan (UDP).
Section 05
Living conditions
The existing garden to the front of 6 [name] has a strong sense of enclosure. This stems principally from the existing [name] properties which form one boundary and the hedge and tree planting along the boundary of the garden farthest from the house frontage.
Given the orientation of the garden, the nature of the boundaries and presence of existing landscape features the garden of No 6 would already be shaded to some degree in the morning. In the afternoon the garden will benefit more from direct sunlight and the proposal would not affect this.
The extent to which the walls of the existing single storey element of the host property on the boundary with No 6 would be raised would be limited. The ridge of the extension would represent a more substantial heightening but as the roof rises the pitch would be sloping away from the garden of No 6.
I therefore find that the proposal would not result in harmful dominating effects on the occupiers of No 6, in the context of the present situation. Effects would be lesser still on the occupiers of Nos 4 and 5 given the increased distance from the development.
A roof window is proposed above a staircase rather than a room which occupants would spend time. Therefore, there would be no significant overlooking or effects upon the privacy of occupiers of [name]. Some increase in noise may result at times should the window be open but in the context of the tight-knit nature of the area some noise from open windows of homes would not be out of character or unduly harmful. The submitted plans show a first floor window in the rear of [name] which is not present but this does not affect my conclusions on living conditions.
No unacceptable harm to the living conditions of the occupants of properties on [name] would result from the development with no conflict with policy P10 of the CS and policy GP5 of the UDP.
Section 06
Other Matters
Bats and other wildlife may be in the area, but I have no substantive evidence before me to suggest that they would be affected or disturbed by the development. I have no reason to conclude that the development could not be adequately drained. There is no particular evidence of development plan policy support for applying any particular space standards.
Whether the Council’s consultation exercises on the planning application were extensive enough has little to do with the planning merits of the case and I have no reason to believe that the statutory requirement has not been fulfilled nor evidence of injustice during the appeal process.
Rights of access onto land or issues of damp penetration are principally private matters to be resolved between the affected parties as would any damage caused to property and the need for phone line diversion. Construction may cause some disruption, but it would be short-term in nature and not significant enough to withhold permission. Regulations, separate from the planning process, relate to boiler flue installation. These matters are, therefore, of little weight in my Decision.
Section 07
Conditions
A plans condition is needed in the interests of clarity. A condition is needed to secure appropriate use of materials in the interests of the character and appearance of the area. I have amended the wording from that suggested by the Council having regard to the commentary of the appellant to agree materials and in the interests of clarity.
Section 08
Conclusion
For the reasons set out above, I conclude that the appeal should be allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 3673No official casework-database value to compare
- Extracted decision date · page 1
- 12 July 2022Matches the official casework database
- Extracted site visit dates
- 21 June 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3296805
- Application reference
- 21/09935/FU
- Lead case reference
- Not recorded
- Planning authority
- Leeds City Council
- Planning authority code
- E08000035
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 18 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- No
- Historic building grant made
- No
- Relates to a conservation area
- Yes
- Flooding is an issue
- No
- Site within an AONB
- No
- Site within an SSSI
- No
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 12 April 2022
- Valid date
- 12 April 2022
- Start date
- 20 April 2022
- Planning authority decision date
- 3 February 2022
- Appeal decision date
- 12 July 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 17673
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21