Skip to main content
Official casework recordDismissedCurrent release

Appeal 3297040

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as an “orangerie”.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main Issue

    The main issue is the effect of the proposed development upon the character and appearance of the host property and the area.

  3. Section 04

    Reasons

    [address] is a residential development located within an area which is suburban in overall character. Though the area comprises of a range of residential estates, it is appreciable that the different estates and streets have their own distinguishing design features. Consistent with this, [address] has distinctive design elements which create a cohesion to the development but also sets it apart from neighbouring streets.

    The proposal would include a flat roof that Middlesbrough’s Urban Design Supplementary Planning Document (SPD) advises would not normally be acceptable, although the Council indicate that they could be where incorporated into a high quality design solution. However, in this case, though the general appearance of the development can be drawn from the plans, they lack the necessary detail to demonstrate, clearly and precisely, the finished appearance of the extension. Detail on the treatments to be given to junction points of the roof lantern with the remains of the roof, the roof to the elevations including the extent of and approaches to fascia boarding, for example, are absent.

    Unsympathetic approaches to finer detail can significantly detract from the design of a proposal. [address], exhibits a cohesive and visually attractive character which in part stems from specific approaches to design detailing and No 4 contributes towards this. I note the suggestions that the Council may be insisting that flat roof extensions have parapet wall details. Whether or not that is the case, and irrespective of the effect that may have on views out through roof windows or the living conditions of neighbours, the proposal before me does not display detailing befitting the quality of [address].

    Policies CS5 and DC1 of the [name] 2008 (CS), require development proposals to demonstrate a high quality of design, that they would integrate well into the immediate and wider context and ensure an enhancement of the built environment. This is reflective of advice within the National Planning Policy Framework (NPPF) which, at paragraph 130, states that planning decisions should ensure that development adds to the overall quality of the area, developments are visually attractive as a result of good architecture and are sympathetic to local character. I cannot conclude that the proposal would deliver the high standard of design necessary to be sympathetic to the host property or successfully assimilate into the area and in turn I find the proposal contrary to these policies and content within the NPPF.

  4. Section 05

    Other Matters

    It may be that some extensions of this nature and scale may not require planning permission. This could lead to inconsistency whereby those extensions for which planning permission is sought are required to accord with the Council’s design requirements with no such requirement for those which do not. However, in this instance an application was submitted and the appeal must be determined in accordance with the development plan unless material considerations indicate otherwise.

  5. Section 06

    Conclusion

    For the reasons given, the proposal would conflict with the development plan taken as a whole. There have been no material considerations put to me that would be worthy of sufficient weight to indicate a decision otherwise than in accordance with it. Therefore, the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 3673No official casework-database value to compare
    Extracted decision date · page 1
    20 June 2022Matches the official casework database
    Extracted site visit dates
    7 June 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3297040
Application reference
22/0108/FUL
Lead case reference
Not recorded
Planning authority
Middlesbrough Council *
Planning authority code
E06000002

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
15 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
14 April 2022
Valid date
14 April 2022
Start date
20 April 2022
Planning authority decision date
4 April 2022
Appeal decision date
20 June 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
16650
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21