Skip to main content
Official casework recordDismissedCurrent release

Appeal 3297287

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a hip to gable loft conversion with side dormer, rooflights, rear Juliet balcony and elevational alterations.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Appeal Procedure

    The site visit was undertaken by an Appeal Planning Officer whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.

  3. Section 04

    [name]

    There is a degree of variation between the description of development on the application form and that utilised by the Council on their decision notice. In this regard, I noted that the appellant had adopted the Council’s description of development on the appeal form. [name] am satisfied that both descriptions are seeking to describe the development, the above description was taken from the Council’s decision notice and appeal form as it is more descriptive.

  4. Section 05

    Main Issue

    The main issue is the effect of the development on the character and appearance of the host dwelling and the street scene.

  5. Section 06

    Reasons for the Recommendation

    The host dwelling, which is a detached two-storey property that is connected by a garage to the adjacent dwelling, forms part of a group of similarly designed detached and semi-detached dwellings. These properties have steeply pitched hipped roofs with mock Tudor front gable walls. These features of the host and neighbouring dwellings within the group contribute to the prevailing character and appearance of the street scene.

    The development would introduce a tiled clad side dormer to the roofscape which would be set below the ridge line and set back from the front elevation. By virtue of its position and scale, the side dormer would detract and disrupt the uncomplicated roof line of the host dwelling. Whilst the host dwelling has an asymmetrical appearance, the side dormer would add a flat roof and significant bulk to the roofscape that would appear visually discordant and disproportionate in size to the host dwelling. The side dormer would therefore not be a subservient feature to the roofscape and would not be in harmony with the character and appearance of the host dwelling.

    As a result of the above, and owing to the separation distances between dwellings, the side dormer would be a notable and visually prominent addition to the roofscape when viewed from the street. Given that there are no other dormer windows within the views of the host dwelling, the side dormer would therefore be a harmful departure from the prevailing character and appearance of the street scene.

    In coming to the above view, I acknowledge the other developments drawn to my attention by the appellant including side roof dormers in the wider area. With the exception of the developments at [address] and [address], details of the permissions relating to the side dormers have not been provided to me. However, from observations during the site visit and the evidence presented before me, these are either subservient to the dwellings or located within a different design context and setting. For these reasons, the cited examples do not represent the same circumstances to the context of the proposed development.

    The appellant has also directed me towards other extensions and alterations within the similarly designed group of neighbouring dwellings on Gates Green Road. Whilst details of these permissions have not been provided, the evidence before me indicates that these relate to side extensions and solar roof panels. These are therefore distinctly different in nature and design from the side dormer and thus not deemed to be directly comparable. Moreover, each proposal must be considered on its individual merits.

    The development also includes the alteration of the hipped roof at the rear to form a new gable wall, together with roof lights and a Juliet balcony. Whilst the Council has not raised any objections to these elements, I am conscious that concerns have been raised from the occupiers of neighbouring properties, in respect of the scale and proportions of the proposal. However, whilst the non-dormer window elements of the proposal would increase the mass and scale of the host dwelling, I consider that these elements would not give rise to any harm to the character and appearance of the area.

    For the reasons above, the development would cause harm to the character and appearance of the host dwelling and street scene. The development would be contrary to Policies 6 and 37 of the Bromley Local Plan (2019). Collectively, these policies seek a high standard of design where the scale, proportion and form respect the host dwelling and adjacent buildings.

  6. Section 07

    Other Matters

    I have also had regard to the concerns raised in the representations relating to the proposals impact on outlook, privacy and the availability of light. [name] have taken these factors into account in my decision, none of these provide for a further reason to withhold planning permission.

  7. Section 08

    Conclusion and Recommendation

    I sympathise with the appellant’s desire to increase living space without increasing the footprint of the host dwelling. However, the scale and position of the side dormer would harm the character and appearance of the host dwelling and the street scene. The development conflicts with the development plan taken as a whole and there are no other considerations, including the National Planning Policy Framework, that outweigh this conflict. I therefore recommend that the appeal is dismissed.

  8. Section 09

    Inspector’s Decision

    I have considered all the submitted evidence and the Appeal Planning Officer’s report and on that basis the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 2894No official casework-database value to compare
    Extracted decision date · page 1
    30 August 2022Matches the official casework database
    Extracted site visit dates
    9 August 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3297287
Application reference
DC/21/03160/FULL6
Lead case reference
Not recorded
Planning authority
London Borough of Bromley
Planning authority code
E09000006

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
20 April 2022
Valid date
20 April 2022
Start date
18 May 2022
Planning authority decision date
7 March 2022
Appeal decision date
30 August 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
19990
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21