Skip to main content
Official casework recordAllowedCurrent release

Appeal 3297507

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

proposed first floor side and rear extension with front and rear dormer window.

  1. Section 02

    Decision

    The appeal is allowed. Planning permission is granted for proposed first floor side and rear extension with front and rear dormer window at [site address] in accordance with the terms of the application Ref 21/06044/HOU dated 2 December 2021 subject to the following conditions:

    The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.

    The development hereby permitted shall be carried out in accordance with the following approved plans: 21-109-P-01, 21-109-P-04 ([name]) & 21-109-P-04 (Existing and [name] with Site Plan).

  2. Section 03

    Procedural Matters

    The description of the proposal has been altered from the application form to the decision notice. That on the application form adequately describes the proposal although I have omitted wording that is not a description of development. I acknowledge that the proposal includes a hip to gable roof extension.

    At the time of the site visit, I noted that the hip to gable roof conversion had been carried out and that the front and rear dormer windows were under construction. Works that had been carried out appeared broadly in accordance with the plans before me, but for the avoidance of doubt my consideration has been made against the plans.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposal on the character and appearance of the area with particular regard to the proposed set back from the front elevation and splayed wall and roof form on the side extension.

  4. Section 05

    Reasons

    The extension would not incorporate any substantial set back at ground floor level. However, this merely reflects the existing situation at the site where the front elevation of the existing single storey side extension sits closely to the main front elevation of the house.

    The side extension would incorporate a substantial set back from the main front elevation at first floor level and the ridgeline of the extension would sit below that on the main dwelling.

    The side extension would utilise the same splayed building line to the western side of the dwelling as currently utilised by the single storey side extension and given the falling land levels on [address], the existing extension already forms a prominent, well-established feature within the street-scene.

    Taking account of the existing arrangement at the site, and the design features of the extension, the proposal would be subordinate to the existing dwelling and would not significantly imbalance the pair of semi-detached properties such that it would have an adverse impact on their appearance. The proposal would not appear visually incongruous and would not therefore harm the character and appearance of the area.

    Subsequently, the proposal would accord with policies DS1 and DS3 of the [name] (2017) (CS) which amongst other things require proposals which achieve good design and which are appropriate to their context in terms of layout, scale, and details.

    In relation to extensions to the side of a house the SPD1 suggests that two storey extensions will normally require a [site address] metre set back behind the front wall of a house. However, the use of the word normally suggests that this may not be required on all occasions and I therefore do not find conflict with SPD guidance.

  5. Section 06

    Conditions

    The standard commencement condition should not be imposed given that the works appear to have commenced. It is necessary that the development be carried out in accordance with the approved plans for the avoidance of doubt and in the interests of certainty. A condition requiring matching materials is necessary in the interests of the character and appearance of the area.

  6. Section 07

    Conclusion

    Taking all relevant matters into account, the proposal accords with the development plan and there is no indication that a decision should be made other than in accordance with it. The appeal is therefore allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 427No official casework-database value to compare
    Extracted decision date · page 1
    28 October 2022Matches the official casework database
    Extracted site visit dates
    17 October 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3297507
Application reference
21/06044/HOU
Lead case reference
Not recorded
Planning authority
City of Bradford Metropolitan District Council
Planning authority code
E08000032

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
22 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
22 April 2022
Valid date
6 May 2022
Start date
30 August 2022
Planning authority decision date
3 February 2022
Appeal decision date
28 October 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
22670
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21