Skip to main content
Official casework recordAllowedCurrent release

Appeal 3297618

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

2 storey side and rear extension, new sewerage plant and domestic air source system, without complying with a condition attached to planning permission Ref 18/00234/HP, dated 20 August 2018.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for 2 storey side and rear extension, new sewerage plant and domestic air source system, at [site address] , without complying with condition 2 previously attached to planning permission Ref 18/00234/HP, dated 20 August 2018, but subject to the conditions set out in the attached Schedule.

  2. Section 03

    Preliminary Matters

    Planning permission reference 18/00234/HP has been granted for extensions at the property. This included a two storey side and rear extension; raising the ridge of the main roof and installing domestic air source heat system. Development has commenced but at the time of my site visit the building did not accord with the permitted drawings in two respects. Firstly, the twin gables at the rear elevation have been built higher and an additional window has been inserted in each of them. Application reference 21/02885/HP, which is the subject of this appeal, seeks to vary Condition 2 of the original permission by substituting amended drawings to address this. Therefore, the appeal has been dealt with under S73A of the Act. Accordingly, I shall consider only the question of the conditions subject to which planning permission was granted and will not undertake a complete re-consideration of the original application. The amended drawings include extending the area of attic storage that has already been approved but do not propose an additional storey. Secondly, the eaves on the front elevation are higher than those shown on the permitted plan. This change is not shown on the amended plans which are the subject of this appeal and so this matter is not before me.

    The Council have confirmed that the decision notice for 21/02885/HP referred to drawing ‘004 [name] in error and it should have stated ‘004 [name]. I note that the Council delegated report occasionally refers to the side extension, but this already has permission and the application subject to this appeal does not seek changes to the two storey side extension.

    At the time of my site visit, the development was substantially complete. However, interior works were not complete and the dwelling was not occupied.

  3. Section 04

    Main Issue

    Taking into account the above, the main issue for this appeal is the effect of the proposed rear extension, as set out in the amended drawings, on the character and appearance of the host dwelling and the surrounding area.

  4. Section 05

    Reasons

    The appeal site forms part of a small group of dwellings fronting onto [site address] , in a rural location. The dwelling is detached and sits within a substantial plot. It is finished in render with a tile roof. Either side of the site are a couple of large, detached dwellings, set within similarly large plots and finished in render, brick and tile. There is no predominant style in this run of dwellings and the roofs feature a mix of designs, orientations and heights.

    The amended drawings incorporate a rear extension with twin gables, both with a ridge height that matches the main roof ridge. Due to the spaces between dwellings, the rear extension is visible from the front. However, when viewed from the road, due to the perspective and angle of sight, the ridge of each gable appears slightly lower than and hence subordinate to the main roof. The rear extension is therefore not overly dominant. This is regardless of the lack of a physical design break between the main roof ridge and the gable ridges.

    When viewed from the side and rear, the rear extension is of a size and design which results in a visually balanced elevation, in keeping with the overall scale and character of the extended dwelling. Due to the distance to the boundaries the extension is not overbearing for neighbours. I note that a neighbouring dwelling has similar gabled sections to the rear, with ridge heights that match the main ridge.

    The amended design may not accord with every element of the [name] Planning Document (SPD). This was also the case for the original approval, which with the scale of the overall changes and raising of the roof ridge was not considered to be subordinate to the original dwelling. However, as set out in the National Planning Policy Framework, SPDs add further detail and guidance to development plan policies and can be a material consideration, but they are not part of the plan. Regardless of this, I find no significant lack of compliance with the general aims of the SPD which seeks to secure well designed extensions which reflects the character of the existing building and the surrounding area.

    The scale, height and massing of the rear extension is in proportion to the overall dwelling and the plot within which it sits. The extended dwelling is in keeping with the scale and design of the surrounding dwellings. I therefore conclude that the development, as set out in the amended drawings, does not cause unacceptable harm to the character and appearance of the host dwelling and the surrounding area. Consequently, the development complies with Policy SWDP 21 of the South Worcestershire Development Plan, which seeks to ensure that development is of a high quality design which integrates effectively with its surroundings, including in terms of scale, height and massing.

  5. Section 06

    Other Matters

    As set out above, I consider the amended scheme to be acceptable in and of itself. However, the previously approved scheme is a fallback position, under which the Council have already accepted the principle of significant alterations and extensions, including raising the height of the main roof ridge. The amended rear extension has ridges higher than the original dwelling, but they are no higher than the main ridge that has already been approved.

    The concern of neighbours regarding overlooking from the additional windows in the top of the rear gables is noted. However, both the original dwelling and the previously approved development included rear facing windows at first floor. Due to the distances and orientation, the additional windows are not considered to afford any significantly different overlooking, despite being at a higher level. In this regard I agree with the Council, who stated they had no concerns in terms of loss of privacy from the gable windows.

    Planning permission has been granted for the Air Source Heat Pump. I am informed by the Council that the condition relating to the Pump has been discharged in so far as it relates to the submission of details.

  6. Section 07

    Conditions

    This appeal grants a new planning permission. The guidance in the Planning Practice Guidance makes clear that decision notices for the grant of planning permission under section 73A should also restate the conditions imposed on earlier permissions that continue to have effect. The Council has confirmed that details relating to some conditions imposed on the original planning permission have been submitted and approved. However, I do not have those details before me and it is not for me to determine whether the development has been carried out in accordance with such details. [name] do not have sufficient information about the current status of the conditions originally imposed I shall reimpose all those conditions that I consider remain relevant. In the event that some have in fact been discharged, that is a matter which can be addressed by the parties.

    As the external walls and roof have already been substantially completed, it is not necessary to impose a condition requiring commencement within a set period or to secure the submission of details of the materials. It is necessary to specify the amended list of approved drawings as this provides certainty and defines the permission.

  7. Section 08

    Conclusion

    For the reasons given above and taking into account the development plan as a whole and all other relevant material considerations, I conclude that the appeal should be allowed. I will grant a new planning permission with the original condition 2 substituted, and now becoming condition 1. I will reimpose the undisputed conditions, which remain reasonable and necessary.

  8. Section 09

    Schedule of Conditions

    The development hereby approved shall be carried out in accordance with the information provided on the application form and the following plans, drawings and documents: • Site Location Plan 1:1250 • 010 – Proposed Block Plan 1:500 • 003 [name] – [name] • 004 [name] – [name] • [name] (January 2018)

    Prior to its installation on site, full details of the domestic air source heat pump hereby approved, including its siting, technical specification and noise rating, shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved details.

    The development hereby permitted shall not be occupied/first used until full details of all foul and surface water drainage systems to serve the development have been submitted to and approved in writing by the Local Planning Authority. The approved drainage works shall be implemented in accordance with the approved details before the first occupation/use of the development hereby permitted and shall be retained thereafter.

    The development hereby permitted shall be carried out in accordance with the recommendations contained within Section 5 and Appendix 4 of the [name] report by Countryside Consultants Ltd dated 26th June 2018 submitted with application 18/00234/HP. On completion of the mitigation and enhancement measures a brief letter of compliance shall be submitted to the local planning authority by the licensed ecologist for confirmation they have been carried out as approved.

    Before the first occupation of the extended dwelling hereby permitted the side facing windows at upper floor shall be fitted with [name] 4 obscured glazing or equivalent and shall be permanently retained in that condition thereafter. *** End of Conditions ***

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 2237No official casework-database value to compare
    Extracted decision date · page 1
    13 July 2022Matches the official casework database
    Extracted site visit dates
    14 June 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3297618
Application reference
21/02885/HP
Lead case reference
Not recorded
Planning authority
Wychavon District Council
Planning authority code
E07000238

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
2. Refused permission to vary or remove a condition(s)
Appeal reason
Appeal Against Conditions
Type detail
Planning Appeals - Other
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
26 April 2022
Valid date
27 April 2022
Start date
3 May 2022
Planning authority decision date
1 February 2022
Appeal decision date
13 July 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
17734
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21