Appeal 3297632
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
4 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a first floor extension, part garage conversion and new bifold doors to the rear.
Section 02
Decision
The appeal is allowed and planning permission is granted for a first floor extension, part garage conversion and new bifold doors to the rear in accordance with the terms of the application Ref 22/00579/FULLS, dated 1 March 2022, subject to the following conditions:
The development hereby permitted shall begin not later than three years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: 2022/01C and 2022/02.
The materials to be used in the construction of the external surfaces of the extension hereby permitted shall match those used in the existing building.
Section 03
Main issue
The Council’s only reason for refusal of the appeal application relates to the possibility of the development having an adverse impact on protected species. No other objections have been raised. The main issue is therefore the effect of the proposal on protected species.
Section 04
Reasons
Bats are protected species under the Wildlife and Countryside Act 1981 and the Conservation of Habitats and Species Regulations 2017. Government guidance in Circular 06/2005 (the Circular) states that it is essential that the presence or otherwise of protected species, and the extent that they may be affected by the proposed development, is established before planning permission is granted, otherwise all relevant material considerations may not have been addressed in making the decision. The Circular does, however, acknowledge the delay and cost of protected species surveys and therefore advises that these surveys should not be required unless there is a reasonable likelihood of the species being present and affected by the development. The key here is therefore whether there is a reasonable likelihood of bats being present and affected by the proposed development.
No bat survey has been carried out. Natural England’s Bats: advice for making planning decisions provides a list of criteria to use when assessing whether a survey should be required. These include where a building is close to woodland and where it has hanging tiles on south-facing walls and has not been used for several years. The guidance also notes that bats are more likely to be present in areas which have little or no disturbance from artificial lighting.
[site address] is a fairly recently constructed house in a residential estate. It sits close to woodland that could provide foraging and roosting opportunities for bats. There is therefore a high likelihood of bats in the local area and this criterion from the Natural England guidance applies. The chances of bats using the residential estate are, however, somewhat reduced by the presence of street lighting.
The main part of the proposed development is a first floor extension over an integral garage which has concrete roof tiles. These roof tiles are close fitting and must provide very little potential for use by bats. The extension would also require the removal of 2 dormer windows which have hanging tiles on their vertical sections. These are very small areas of tiles, and only 2 sections are south facing, plus the building is not disused. The Natural England criterion regarding tile hanging is therefore not fully met. The much larger areas of tile hanging on a front gable would not be directly affected by the proposal.
Although there is woodland near to No 32, and despite the absence of any expert evidence to support the proposal, it appears to me that the chances of bats using these tiny areas of hanging tiles on this relatively new house in a street lit area are relatively minimal. I conclude that there is not a reasonable likelihood that bats would be affected by the development and that a survey should not be required. The proposal accords with the aims of Policy E5 of the Test Valley Borough Revised Local Plan (RLP) and the Circular, to conserve biodiversity. The Council also refers to RLP policy COM2 but that is a more strategic level policy and I see no direct relevance.
For the reasons set out above, and having regard to all other matters raised, I conclude that the appeal should succeed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 890No official casework-database value to compare
- Extracted decision date · page 1
- 21 September 2022Matches the official casework database
- Extracted site visit dates
- 22 August 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3297632
- Application reference
- 22/00579/FULLS
- Lead case reference
- Not recorded
- Planning authority
- Test Valley Borough Council
- Planning authority code
- E07000093
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 26 April 2022
- Valid date
- 26 April 2022
- Start date
- 11 May 2022
- Planning authority decision date
- 25 April 2022
- Appeal decision date
- 21 September 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 20817
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21