Appeal 3297724
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a two storey side and rear extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
The application described the proposal as a two storey side and rear extension. The proposal also includes a single storey rear extension and rear dormer. The proposal is clear from the submitted drawings and the appeal has been determined on the basis of the drawings.
At the time the Council decision was made and the appeal was submitted, the Tewkesbury Borough Local Plan 2011-2031 (LP) was at an advanced stage of examination but had not been adopted. Emerging plans within it were given due consideration. The LP was subsequently adopted on 8 June 2022. The courts have confirmed that Inspectors need to make their decisions on the basis of the development plan in place at the time of their decision, which is now the recently adopted LP. The Council and the appellant have had the opportunity to comment on this.
The application was refused on the basis of Policies SD4 and SD14 of the Gloucester, Cheltenham, and [name] 2011-2031 (2017) (JCS); Saved Policy HOU8 of the Tewkesbury Borough Local Plan to 2011 (March 2006); and Policy RES10 of the Tewkesbury Borough Local Plan 2011 – 2031 [name] (October 2019).
Policies SD4 and SD14 remain as part of the JCS. Saved Policy HOU8 has been replaced by Policy RES10 of the now adopted LP. There have been no changes to Policy RES10 between the emerging version and the version in the adopted LP. Therefore, the relevant policies against which this appeal will be determined are SD4 and 14 of the JCS and RES10 of the LP.
Section 04
[name]
The main issues are the effect of the proposed development on: • The character and appearance of the host dwelling and the surrounding area; and • The living conditions of the occupants of 10 and [address], with regard to outlook and light.
Section 05
Character and appearance
[address] consists of predominantly semi-detached dwellings with hipped roofs. A range of dwellings have been altered and extended but the street retains a relatively high level of consistency in term of design and layout. The appeal site and its attached neighbour currently form a balanced pair which reflect the prevailing character and appearance of the surroundings and contributes positively to the streetscene.
The proposed two storey extension would be significantly set back from the front elevation, with eaves higher than the existing eaves, and would include a shallow mansard style roof. None of these elements are characteristic of the predominant form and layout of the street. The angle of the hip on the main roof would be altered making it at odds with the rest of the street, as well as resulting in the host pair of dwellings becoming visually unbalanced. Taken together, these factors mean that the form and layout of the proposed two storey extension fails to reflect or complement the design of the host dwelling and the rest of the street. As such it would be an incongruous element within the streetscene and would not respect the character and appearance of the surrounding development.
The dormer and single storey extension would only be visible from the rear. The dormer incorporates yet another roof form which adds to the visual clutter and impacts negatively on the character and appearance of the host dwelling. The relatively modest scale and form of the single storey rear extension mean it would not have a negative impact on the host dwelling.
The materials would be suitable and notwithstanding the issues with design and location, the overall scale would not be excessive, given the size of the dwelling and its plot. However, this does not overcome the issues identified.
There are examples of other two storey side extensions in the area, including those to which the appellant has drawn my attention. Details of these are not before me, but I viewed the examples during my site visit. I have also considered the plan extracts provided and note there are significant differences between the designs of the examples and the design of the proposal. Unlike the proposal, the example extensions incorporate roof forms and extension layouts which respect and complement the host dwellings and result is built form which sits comfortably in the streetscene. In any event, each case must be considered on its own merits and impacts and direct parallels are not easily drawn.
I conclude that the proposed development would cause significant harm to the character and appearance of the host dwelling and the surrounding area. Consequently, the development would not comply with Policies SD4 of the JCS and Policy RES10 of the LP, which together, amongst other things, seek to ensure that development is well designed and respects the character and appearance of surrounding development. Furthermore, it would not accord with the National Planning Policy Framework (the Framework) which seeks to achieve well-designed places.
Section 06
Living conditions
Due to a combination of the two storey height, projection beyond the existing rear elevation, and proximity to the boundary, the two storey extension would be an unacceptably dominant and visually oppressive feature. It would have an enclosing and overbearing effect on the outlook from both the rear garden and rear facing habitable rooms of No 10 and No 14 and the side facing windows of No 10. In addition, the two storey extension would result in a reduction in the amount of light reaching the side windows at No 10 and the single storey extension would result in some additional shadowing of the garden at No 14.
Taken together, these impacts would cause unacceptable harm to the living conditions of the occupants of 10 and [address], with regard to outlook and light. Consequently, the development would not comply with Policies SD14 of the JCS and Policy RES10 of the LP, which together, amongst other things, seek to ensure that development does not have an unacceptable impact on the amenity of neighbouring property.
Section 07
Conclusion
For the reasons given above and taking into account the development plan as a whole and all other relevant material considerations, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2237No official casework-database value to compare
- Extracted decision date · page 1
- 13 July 2022Matches the official casework database
- Extracted site visit dates
- 5 July 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3297724
- Application reference
- 22/00247/FUL
- Lead case reference
- Not recorded
- Planning authority
- Tewkesbury Borough Council
- Planning authority code
- E07000083
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 57 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 27 April 2022
- Valid date
- 27 April 2022
- Start date
- 5 May 2022
- Planning authority decision date
- 26 April 2022
- Appeal decision date
- 13 July 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 17735
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21