Skip to main content
Official casework recordAllowedCurrent release

Appeal 3297747

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

10 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as “to create a vehicular access by means of ornate period wrought iron electric gates and posts onto [address] and disabled access 1 x T1 Sycamore removed

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted to create a vehicular access by means of ornate period wrought iron electric gates and posts onto [address] and the removal of 1 x T1 Sycamore at [site address] in accordance with the terms of the application, Ref 21/02084/FUL, dated 13 August 2021, subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: [name] – [name]; [name] – Location Plan; and [name] – [name] and Posts.

    No development shall commence until details of the materials to be used in the construction of the external surfaces and gates of the development hereby permitted have been submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved details.

    No site clearance, preparatory work or development shall take place until a scheme for the protection of the retained trees (the tree protection plan) and the appropriate working methods (the arboricultural method statement) in accordance with paragraphs 5.5 and 6.1 of [name] 5837: Trees in relation to design, demolition and construction - Recommendations (or in an equivalent [name] if replaced) shall have been submitted to and approved in writing by the local planning authority. The scheme for the protection of the retained trees shall be carried out as approved. In this condition "retained tree" means an existing tree which is to be retained in accordance with the approved plans and particulars.

    No development shall commence until there shall have been submitted to and approved in writing by the local planning authority a scheme of landscaping. The scheme shall include indications of all existing trees and hedgerows on the land, identify those to be retained and set out measures for their protection throughout the course of the development.

    All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding seasons following the occupation of the buildings or the completion of the development, whichever is the sooner; and any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species.

  2. Section 03

    Procedural Matter

    I have amended the description of development in my decision to that used in the decision notice and appeal form as it more accurately describes the development. The Council has referred in its officer report to the fact that the proposed plans were amended during the processing of the planning application to provide additional detail. I am therefore dealing with the plans that the Council considered when making its decision.

  3. Section 04

    [name]

    The main issues are: • The effect of the development on the character and appearance of the surrounding area with particular regard to the Ossett Conservation Area (CA) including the effect on protected trees; • The need for and benefits of the proposed access; and • The effect of the proposal on ecological interests.

  4. Section 05

    Character and appearance

    The appeal site is a large property set in a spacious garden within the CA. [address] forms a main approach to the historic centre of Ossett. It has a predominantly residential character, and the properties are set back from the road, with trees and mature vegetation. This green approach contrasts with more urban appearance of the roads around the centre and positively contributes to the character and appearance of the CA. The appeal site is currently bounded by a stone wall along the [address] frontage. The trees just behind the line of the boundary wall stand prominently close to the road and provide further enclosure of the site with the canopies particularly of these trees providing a softening of views towards the dwelling on the site. The trees and vegetation are inherently attractive and have a degree of special interest within the CA due to their softening of the built environment.

    The proposal would involve the creation of an access. This would include the construction of walls on either side of the splayed entrance turning in towards the site, matching the materials used in the construction of the existing wall along [address]. The new parts of the wall would terminate with large gate posts with orbs on top which would be 5m back from the highway. The posts would support ornate metal gates.

    The Council accept that historically there would have been an access from [address] serving the property. They have not raised specific concerns regarding the form of the proposed access including the walls and gates. I am also of the view that the design of the access would reflect the scale and appearance of the existing wall. The gates and posts would respect the design qualities of the area. In these respects, the alteration to the [address] frontage would respect the existing built features nearby which is one of the requirements of Wakefield Metropolitan District Council - Local Development Framework, April 2009 (LDF), Policy D9.

    It is specifically shown that one tree currently behind the boundary of the appeal site would need to be removed to enable the construction of the access. That tree is marked ‘T7’ on the submitted [name] (AIS). This tree helps to provide some softening of the site as explained above. It may take some years for that gap within the canopy to be infilled by the adjoining trees and I recognise the Council’s point that removal of a central tree in this way would reveal potentially one-sided growth patterns. If the existing wall was being retained in the way it exists at this time, this gap would be conspicuous and would lead to what would be seen as an unusual gap in branches and foliage above the top of the wall. However, the creation of the access would bring about a very different set of circumstances and the retained trees on either side of that would frame the new opening. In that way, an increase in the gap within the canopy would not look as conspicuous. Together with additional planting as suggested in the AIS, the expansion of the canopy of the trees on either side would bring about a framing of the new entrance which would not look out of place along [address] or the wider CA.

    Additional safeguarding of the root systems of the retained trees would need to be undertaken and the appellant has suggested a cellular confinement system installed via ‘no dig’ techniques. The Council suggests that these systems can lose their effectiveness over time because their surfaces can become impervious. I am not provided with evidence on this matter and am aware that such systems are frequently used in such situations. Furthermore, a condition can be imposed to require further details are submitted of the tree protection measures.

    In relation to the first main issue, the proposed development would not have a harmful effect on the character and appearance of the surrounding area. As such, with respect to my duties under s72(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990 (the Act) this would preserve the character and appearance of the CA. Furthermore, the proposal would respect the character of the locality. As such in these respects the proposal complies with Policies D18 and D9 of the LDF. The proposal therefore would not lead to any harm to the significance of the CA as a designated heritage asset and so there is no need to carry out a balance with the public benefits of the proposal as set out in paragraph 201 of the National Planning Policy Framework (the Framework).

  5. Section 06

    Need and benefits

    The access is required for a member of the appellant’s family who has suffered a major accident that they are still recovering from. This has resulted in mobility impairments.

    The appellant’s evidence is clear that in the longer term further works would be required to create a level, internal access. The precise details of those plans are not in front of me in this appeal and it is not clear that if further planning permission is required for them, that it would be forthcoming. However, the proposal would provide a much easier access directly to the front door of the property which would make the house more accessible. From what I saw when I visited, this would be a substantial improvement over the existing access arrangements for a person with mobility difficulties.

    I therefore find that there is a need for the proposed access that would bring benefits to an occupant of the property. I attach moderate weight to the need for and benefits of the scheme.

  6. Section 07

    [name]

    The first reason for refusal refers to alleged non-compliance with LDF Policy D7 which relates to the protection of trees and woodland as important ecological asset as identified in the Wakefield District Biodiversity Report. I have no evidence with the appeal about the specific ecological value of the tree that is proposed for removal or the ecological benefits of the additional planting through any further landscaping.

    The Council’s reasoning within the Officer report cites criteria 2 as the relevant part of the policy. This, amongst other things, allows for the loss trees only when each of list of criteria are met. My reading of this is that all of these criteria need to be met for the policy exception to be accepted. To that end, it has not been demonstrated that the development cannot be reasonably redesigned or located on an alternative site or that any harm can be reduced to acceptable limits.

    In relation to this main issue, on the basis of the evidence submitted, I cannot reach a firm view about the effect of the proposal on ecological interests. However, LDF Policy D7 is not complied with.

  7. Section 08

    Planning balance

    The proposal is acceptable with respects to the first main issue and complies with the development plan policies referred to by the Council in that respect. However, although the evidence about ecological interests is very limited, the requirements of LDF Policy D7 are not met and that policy is not complied with. The development plan as a whole is therefore not complied with in that limited respect.

    I have had due regard to the public sector equality duty (PSED) set out under s149 of the Equality Act 2010. The proposed access is required to meet the needs of a person who has the ‘protected characteristic’ of disability for the purposes of the PSED. I am satisfied that the need for and benefits of the development would outweigh the harm it would cause to the ecological interests of the site, so long as conditions are imposed to bring the harm down to the minimum level with respect to protection of retained trees and further landscaping taking place. It is necessary and proportionate to grant planning permission on that basis for the access in order to eliminate discrimination against and advance equality of opportunity for the appellant’s family.

  8. Section 09

    Conditions

    I have imposed standard conditions relating to the commencement of development and to require compliance with the submitted plans to define the terms of the permission.

    The Council’s report suggests they are satisfied that the use of good quality materials is proposed, however specific details are not readily apparent. It is necessary for the details to be secured by condition to ensure the character and appearance of the CA is at least preserved.

    While not suggested by the Council, the appellant’s case makes clear they would accept conditions requiring an arboricultural method statement and landscaping of the drive. These conditions are necessary and reasonable to mitigate the effects of the development on the retained trees and of the loss of the sycamore.

  9. Section 10

    Conclusion

    For the reasons given above, and having regard to all other matters raised, I conclude that the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 3574No official casework-database value to compare
    Extracted decision date · page 1
    4 October 2022Matches the official casework database
    Extracted site visit dates
    5 July 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3297747
Application reference
21/02084/FUL
Lead case reference
Not recorded
Planning authority
Wakefield Metropolitan District Council
Planning authority code
E08000036

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
27 April 2022
Valid date
6 June 2022
Start date
20 June 2022
Planning authority decision date
10 February 2022
Appeal decision date
4 October 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
21435
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21