Skip to main content
Official casework recordAllowedCurrent release

Appeal 3297980

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

an extension to the existing dwelling.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for an extension to the existing dwelling at [site address] , [site address] , Draycott [postcode] , in accordance with the terms of the application, [name]/0122/0076, dated 19 January 2022, subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: Site Location Plan (Ref 034879 2022.01.31); JG/DR/2016/032/01 (Existing & [name] and Elevations).

    The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.

  2. Section 03

    [name]

    The site lies within an area of Green Belt. Therefore, the main issues are: • Whether the proposal is inappropriate development in the Green Belt having regard to the National Planning Policy Framework (the Framework) and any relevant development plan policies.; • The effect of the proposal on the openness of the Green Belt; • If the development is inappropriate, whether any harm by reason of inappropriateness, and any other harm, is clearly outweighed by other considerations so as to amount to the very special circumstances necessary to justify the proposal.

  3. Section 04

    Reasons

    Paragraph 149 of the Framework states that the construction of new buildings within the Green Belt is inappropriate development, but lists certain forms of development which are not regarded as inappropriate. This includes the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building.

    Policy 3 of the [name] (March 2014) (the CS) states that the Council will have regard to the statutory purposes of the Green Belt in considering proposals for development within it. Saved Policy GB4 of the Erewash Borough Saved Policies Document (July 2008) (the EBSPD) permits extensions to dwellings in the Green Belt where they relate well to the existing dwelling, do not result in disproportionate additions over above the size of the dwelling as originally built, and are not harmful to the character or appearance of the Green Belt.

    These policies are not wholly consistent with the approach of the Framework to the Green Belt, in particular as they do not refer to inappropriate development or permitted exceptions to it, and in the application of different criteria for development. Therefore, in accordance with Paragraph 219, I afford limited weight to these policies and have assessed the proposal primarily against the Framework.

    The dwelling in question is a modest, single storey building converted to residential use under permitted development rights, following the granting of prior approval in 2017. The Council emphasises that dwellings formed through the provisions of Schedule 2, Part 3, Class Q of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (the GPDO) are not permitted to extend beyond the footprint of the dwelling per [name].1.(h). The Council argues that the restriction on extending Class Q dwellings is effectively an expression of government policy that such dwellings should not be extended, and that doing so would amount to inappropriate development in the Green Belt.

    I do not share this view. [name].1.(h) prevents extensions from forming part of the development undertaken under permitted development pursuant to Class Q, as subsequently does [name].1.(a) of Schedule 2, Part 1, Class A once the change of use occurs. However, these restrictions within the GPDO do not prevent someone seeking planning permission for an extension to a dwelling, which falls to be assessed against the development plan, having regard to other material considerations, including the Framework.

    Neither of the aforementioned policies restricts the extension of dwellings formed through permitted development rights. Moreover, the Framework tests for exceptions to inappropriate development do not include a restriction on the extension of dwellings formed through the exercise of permitted development rights. In fact, the disproportionate additions test at Paragraph 149 relates to the original building, not dwelling, and to its size, not its use. Therefore, the fact that the dwelling originated through permitted development is not a determinative factor in assessing the proposal against the development plan or the Framework. As a material consideration, the restrictions of the GDPO simply mean that the appellant does not have a potential fall-back position as may occur in other cases, but that does not prevent the proposal from being considered on its planning merits.

    The Framework does not specify what might be a disproportionate addition over and above the size of the original building. Nor do I have any evidence of a definition applied locally by the Council. As such, it is a matter of planning judgement based on the particular circumstances of the case.

    The proposal would extend the simple rectangular footprint of the dwelling, with the walls and pitched roof continuing on the same lines. It would measure some 5.1 metres in length and 4.765 metres in width. The appellant’s volume calculations indicate that the existing dwelling is 219.22 cubic metres and the extension would be 68.37 cubic metres, an increase of some 31.19%.

    However, these calculations appear to overstate the size of the dwelling and extension, based on the measurements on the plans. This aside, although measurements of the existing dwelling’s length are not given, it can be surmised from the submitted plans that the extension would be roughly half of the length of the original dwelling. All other dimensions – width, eaves height and ridge height – would remain as existing. Therefore, it follows that the extension would add something closer to 50% in both footprint and volume.

    Such an increase may seem large; however, the existing dwelling is small in scale, and in absolute terms the extension would be modest in size. The extension would match the shape of the dwelling, and so would not stand out as a separate element; rather, the dwelling would appear as an elongated version of that which already exists. In this context, the proposal would not result in a dwelling which appears extended to a demonstrably large extent, nor would it result in a substantial departure from its original form.

    Given these factors, I am satisfied that the proposal would not amount to a disproportionate addition over and above the size of the original building. Therefore, the proposal would accord with the provisions of the Framework, and no conflict would arise with Policy 3 of the CS or Policy GB4 of the EBSDP.

    The Council also refers to the proposal extending the dwelling into open pastureland beyond residential curtilage of the dwelling, harming openness. However, given my findings that the proposal would not be inappropriate development, the proposal would, by definition, not have an adverse impact on the openness of the Green Belt or the purposes of including land within it.

    As the proposal does not amount to inappropriate development, there is no requirement to assess if there are other considerations that amount to very special circumstances needed to justify it.

  4. Section 05

    Other Matters

    The Council accepted that the design of the extension would be acceptable, and that there would not be any adverse impact on neighbours’ living conditions. On the evidence before me, I have no reasons to disagree in these matters.

  5. Section 06

    Conclusion

    The proposal would not be inappropriate development in the Green Belt, nor would there be harm to the openness of the Green Belt or in other respects. Consequently, there is no conflict with the development plan or the Framework.

    The appeal is therefore allowed, subject to conditions requiring development to be carried out in accordance with the approved plans, to provide certainty, and requiring the use of matching materials, to ensure a satisfactory appearance.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 426No official casework-database value to compare
    Extracted decision date · page 1
    25 October 2022Matches the official casework database
    Extracted site visit dates
    22 September 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3297980
Application reference
ERE/0122/0076
Lead case reference
Not recorded
Planning authority
Erewash Borough Council
Planning authority code
E07000036

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0.1 hectares
Floor space
24 m²
Number of residences
1
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
30 April 2022
Valid date
30 April 2022
Start date
23 June 2022
Planning authority decision date
31 March 2022
Appeal decision date
25 October 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
22459
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21