Appeal 3298203
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the creation of a hard standing driveway and drop kerb access.
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The main issue of this appeal is the effect of the development on the character and appearance of the area.
Section 04
Reasons
The appeal site comprises an area to the front of [site address] and forms part of a larger section of green space that runs along this side of the road. A tree is located to the front of the site and, due to its prominent position, size and maturity, is visible from several locations along the road and in the surrounding area.
In the wider green space, other trees of a similar size and maturity are scattered. These, combined with the tree on the site and the grassed areas of the green space, contribute positively to the verdant character of the area. There is also a sense of openness as houses are set away from the road, in contrast to the terraced houses located close to the pavement on the opposite side of the road.
Whilst the development would occupy a relatively small area, its position would break up the green space with an area of hard surfacing, isolate a section of grass and reduce the overall area of green space. In addition, I can see nothing that would prevent vehicles from being parked on the hardstanding which would negatively affect the area’s sense of openness and erode the verdant character of the area.
The ‘Proposed highway verge and footpath crossing’ plan and the Tree Protection Plan contained within the [name] submitted with the application show differing hardstanding areas and specify different construction methods and materials. Even if the works were limited in depth within the root protection area, due to this inconsistency, I cannot be certain that the development will avoid harm to the tree or that the tree will be adequately protected.
Therefore, I conclude that the development would unacceptably harm the character and appearance of the area, and conflicts with Policy CP6 of the Bath and [name] 2014, Policies D1, D2, D4 and NE6 of the Placemaking Plan for Bath and [name] 2017 and the National Planning Policy Framework. These policies, amongst other things, seek to ensure new development contributes positively to, and enriches, the character of the local area and avoids any adverse impact on trees amenity value. In the decision notice, the Council also refers to [name] D3 and D5. As these relate to urban fabric and building design, I do not consider them to be relevant.
Section 05
Other Matters
As the area of hardstanding which provides access to [address] is located at the end of the green space and is further away from the tree and its roots, it is materially different from the appeal proposals.
I have no evidence before me that demonstrates that any damage has been caused to the tree or its roots from vehicles driving near the tree or over its roots, nor that it would be unlikely to survive on site for many years.
Even if I were to consider that the development would not harm the living conditions of occupiers of [site address] or adjacent properties and would maintain highway safety standards, these would be neutral factors and would not weigh in favour of the development.
Section 06
Conclusion
The proposed development conflicts with the development plan when considered as a whole and there are no material considerations, either individually or in combination, that outweigh the identified harm and associated development plan conflict. Therefore, I conclude that the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 3913No official casework-database value to compare
- Extracted decision date · page 1
- 15 July 2022Matches the official casework database
- Extracted site visit dates
- 5 July 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3298203
- Application reference
- 22/01075/FUL
- Lead case reference
- Not recorded
- Planning authority
- Bath and North East Somerset Council
- Planning authority code
- E06000022
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 4 May 2022
- Valid date
- 4 May 2022
- Start date
- 15 June 2022
- Planning authority decision date
- 3 May 2022
- Appeal decision date
- 15 July 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 17864
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21