Skip to main content
Official casework recordDismissedCurrent release

Appeal 3298285

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a two storey side extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    Following the Council’s decision on the appeal application, the Tewkesbury Borough Plan 2011-2031 (TBP) has been adopted (June 2022). As a result, Policy RES10 of the adopted TBP replaces the Saved Policy HOU8 of the Tewkesbury Borough Local Plan to 2011 which was referred to in the Council’s decision notice. Both parties have been given the opportunity to provide further comments on the adopted policy.

  3. Section 04

    Main Issue

    The main issue of this appeal is the effect of the development on the character and appearance of the area.

  4. Section 05

    Reasons

    The appeal site comprises a two storey detached house, located on the corner where [address] splits into two sections. The substantial mature hedge, located on the side boundary of the site, is a prominent feature in the streetscene that helps to softened the appearance of the area.

    The area is predominantly characterised by detached and semi-detached properties set back from the pavement behind modest gardens and/or parking areas whilst brick walls, hedging and wooden fencing are the prevalent side and rear boundary treatments.

    The development would extend the host dwelling uncharacteristically up to the side boundary with the pavement at first floor level. It would replace considerably lower and smaller in bulk single storey car port and remove a section of the hedge. Whilst the design and materials of the extension are similar to that of the host dwelling, the significant increase in the bulk would dominate the property.

    Due to the site’s corner location, combined with the scale, bulk and positioning of the extension up to the edge of the pavement, the development would result in a blank, two storey side elevation becoming a prominent feature in the streetscene, visible from several parts of [address].

    Whilst other properties in the area have been extended, these additions are set back from the front elevations and/or with lower ridge and eaves heights than the host dwellings. As none of these examples include two storey extensions positioned directly at the edge of the pavement or located in a prominent part of the streetscene, they are not directly comparable with the appeal proposals.

    Other hedges nearby may have been removed due to their condition. However, there is no compelling evidence that the hedge on the appeal site is in poor health or that is has affected the car port. Any proposed landscaping would take time to mature and, given the scale and position of the development, it would be unlikely to effectively screen the extension.

    I conclude that the development would unacceptably harm the character and appearance of the area and the host dwelling. Therefore, the development would be contrary to Policy SD4 of the Gloucester, Cheltenham and [name] 2011-2031 and RES10 of the TBP which requires, amongst other things, that development, including extensions, should be appropriate to the character and appearance of the existing dwelling and its surrounding area.

  5. Section 06

    Other Matters

    I do acknowledge that the hedge may be difficult to maintain and its removal beneficial in providing additional space for the occupiers of the property. Whilst the removal of part of the hedge may provide more space for those using the pavement, as the development retains the remainder of the hedge, any benefit to pedestrians would be minimal. These matters, individually or combined, do not outweigh the harm I have identified above.

    Even if I were to consider that the development would not harm the living conditions of occupiers of neighbouring properties, the plot is of sufficient size to accommodate the development and parking, these would be neutral factors and would not weigh in favour of the development.

  6. Section 07

    Conclusion

    The proposed development conflicts with the development plan when considered as a whole and there are no material considerations, either individually or in combination, that outweigh the identified harm and associated development plan conflict. Therefore, I conclude that the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 3913No official casework-database value to compare
    Extracted decision date · page 1
    21 July 2022Matches the official casework database
    Extracted site visit dates
    12 July 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3298285
Application reference
22/00131/FUL
Lead case reference
Not recorded
Planning authority
Tewkesbury Borough Council
Planning authority code
E07000083

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
27 m²
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
5 May 2022
Valid date
5 May 2022
Start date
12 May 2022
Planning authority decision date
8 April 2022
Appeal decision date
21 July 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
18169
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21