Skip to main content
Official casework recordDismissedCurrent release

Appeal 3298770

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

5 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

No verified development description has been extracted from an official decision PDF yet.

  1. Section 02

    Decision

    Appeal A is dismissed, and Appeal B is dismissed.

  2. Section 03

    [name]

    As set out above, there are two appeals on this site. They differ only in the detail of the design of the proposed extensions. The design of the extension for Appeal B has a steeper roof pitch and smaller gap between the eaves and first floor windows than the design in Appeal A. In both instances as part of the extension, the roof would be altered from its hipped form to a gabled roof and the overall roof ridge would increase by 1.2m. I have considered each proposal on its individual merits. However, to avoid duplication I have dealt with the two schemes together, except where otherwise indicated.

  3. Section 04

    Main Issue

    The main issue in both appeals is whether the proposals would preserve or enhance the character or appearance of the [site address] Conservation Area (CA).

  4. Section 05

    Reasons

    The appeal property is a two-storey detached dwelling located on [site address] (the Lane) which is characterised by a variety of residential property styles. This part of the Lane forms a boundary to the CA with the appeal property falling within its boundaries.

    There is an attractive row of terraced properties built in an arts and crafts style to the south of the site that front onto [address]. Otherwise, properties along this part of the Lane appear to be mostly 20th Century housing. Despite the more recent housing, the two-storey scale of properties and generally simple designs are in keeping with the broader architectural vernacular in the CA and do not detract from its significance.

    The appeal property has a two-storey flat roof extension. This is at odds with the predominant mix of hipped and gabled roofs in this part of the Lane and the hipped roof form of the appeal property. Otherwise, it has a pleasing simplicity to its design, with the doors and fenestration creating a balanced frontage and the hipped roof spanning the ground floor bay windows reflecting the hipped roof of the host property. Moreover, two chimney stacks, and stonework on the ground floor, add interest and are features found locally.

    In both appeals, the proposals would result in a significant alteration to the roof by creating a single gabled pitched roof, replacing the hipped roof and flat roof element. The small differences between the eaves and steepness of the roof slope would not materially alter the fundamental increases in bulk and massing that would ensue in both appeals.

    The overall ridge height would be lower than the adjacent detached property on the Lane. However, the appeal property’s ridge would be positioned nearer to the Lane than the ridge of the adjacent property. As such, I find that both proposals would appear unduly bulky. This would be exacerbated by the continuous treatment of the roof slope across the property, rather than being stepped down at the point where the existing garage and bedroom step in from the front façade.

    The loss of the hipped roof would sever the visual connection with the hipped roof above the bay windows. Furthermore, the design for Appeal B would subsume most of the retained chimney stack as it rises through the roof slope, weakening its presence in the street scene.

    The loss of the stone to the front would erode the visual connection with the front wall and elsewhere in the CA. There are examples of fully rendered properties in the immediate locality and in this regard a fully rendered property would not appear incongruous. However, most properties in the CA appeared to be built from stone. Moreover, the existing stone detailing on the host property adds interest. Its loss would not, therefore, be an enhancement.

    The appellant has indicated that they would be willing to retain the use of a stone plinth at the ground floor and this could be secured by a condition. Whilst this would be a positive improvement to the designs, it would not overcome my concerns in relation to the alterations to the roof.

    There is no overriding consistency in the Lane with regards to the gap between the first-floor windows and eaves. Moreover, the increased gap shown in the design in Appeal A is very small, and in the context of this part of the street scene, it would not be harmful. However, this does not overcome or outweigh my concerns regarding the design for both appeals, as set out above.

    Other elements of the two schemes, such as the rear extension do not cause harm. However, for the reasons set out above, the design of both Appeal A and Appeal B would not constitute high quality design and would cause harm to this part of the street scene. They would therefore not preserve or enhance the character or appearance of the CA.

    Heritage assets are irreplaceable and great weight should be given to their conservation. The harm would be localised along this part of the street. As such, the effects would be less than substantial in the context of paragraph 202 of the National Planning Policy Framework (the Framework). In accordance with paragraph 202 I must balance that less than substantial harm against the public benefits of the proposal.

    My attention has been drawn to a separate planning permission granted at the site (21/09947/FU) for an extension and alterations to the appeal property. This includes raising the ridge by 1.2m. As planning permission has been issued for the fallback position, I consider it a strong possibility that it would be implemented were this appeal to fail.

    Although the increase in ridge height compares with both appeals before me, the fallback scheme has a hipped roof with considerably less bulk. This reflects the character of the original dwelling. Moreover, the fallback scheme, maintains the prominence of the chimney stack on the south elevation, due to its detachment from the roof slope. As such, the effects on the street scene and CA from this fallback position would not be as harmful as both proposals before me.

    The increased accommodation proposed in both appeals would have largely personal benefits for the appellant and therefore carry limited weight. The appeal proposal would remove the contrived flat roof of the side extension. However, this would also be the case with the fallback scheme. Moreover, the removal of this detracting feature would be for a roof structure which would be more dominant and cause harm to the CA. Accordingly, there are no public benefits that outweigh the less than substantial harm to the CA, resulting from both appeals.

    Both proposals would thus conflict with the requirements of Policies P10 and P11 of the Council’s Core Strategy (2014), saved Policies GP5, BD6, N19 and BC7 of the Council’s Unitary Development Plan (2006), Policies LE1 and BE1 of the [site address] and Scholes Neighbourhood Plan, the objectives of the [name] Planning Document (2012) and the Framework. These are concerned with, amongst other things, the character and appearance of developments and, where relevant, developments within CA’s.

    For the reasons given above, both Appeal A and Appeal B would conflict with the development plan and there are no material considerations, including the fallback scheme, that would outweigh that conflict.

    I conclude that both Appeal A and Appeal B should not succeed. Mr [planning inspector] INSPECTOR

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 1160No official casework-database value to compare
    Extracted decision date · page 1
    16 August 2022Matches the official casework database
    Extracted site visit dates
    2 August 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3298770
Application reference
21/09946/FU
Lead case reference
Not recorded
Planning authority
Leeds City Council
Planning authority code
E08000035

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Lead

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
484 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Yes
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
12 May 2022
Valid date
12 May 2022
Start date
23 May 2022
Planning authority decision date
6 April 2022
Appeal decision date
16 August 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
19307
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21