Skip to main content
Official casework recordAllowedCurrent release

Appeal 3298887

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

rear first floor extension to provide additional bedroom and accommodation.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for rear first floor extension to provide additional bedroom and accommodation at [address], Wyddial, Hertfordshire [postcode] in accordance with the terms of the application, Ref 3/22/0391/HH, dated 22 April 2022, subject to the following

  2. Section 03

    conditions:

    The development hereby permitted shall be begun before the expiration of three years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: [name] 01 and [name] 02 [name].

    No development shall commence until details of the external materials have been submitted to and agreed in writing by the local planning authority (including timber cladding, slate, fenestration and rainwater goods). Thereafter the works shall be carried out in full accordance with the approved details and the development shall be maintained as approved.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposal on the character and appearance of the host property and area.

  4. Section 05

    Reasons

    The host property is a detached two storey dwelling located in a rural area and constructed from brick under a slate tiled roof with its principal elevation close to [address]. The property benefits from an existing double storey rear gable extension set on top of a single storey rendered extension spanning the full width of the rear elevation.

    In this case there is no doubt that the size and scale proposed would cumulatively result in significant extensions and alterations to the original property. This includes from a pair of large outbuildings within close proximity to the dwelling1. That said there is no size limit imposed by the development plan policies before me and this is a rural property set within large grounds and surrounded by open agricultural fields, trees and in an area of similar rural properties.

    The first floor gables have been designed to sit below the base of the existing chimney and their depth would be no greater than the existing gable. The depth would also not be as ‘wide’ as the flank of the main dwelling and the scale, form and mass would appear as a less important addition and therefore subservient. Visually, from the prominent approach down the hill from the west I observed that the existing view to the rear of the dwelling was of the rendered side wall and roof of the existing rear first floor extension. This would be replaced by a more sympathetic view of slate roof and timber cladding, the details of which could be agreed by condition. Such materials would be entirely reflective of local distinctiveness and character and the cladding would help to visually distinguish the extension from the main building.

    The rear floor to ceiling windows whilst undoubtedly a requirement of more contemporary living standards are not entirely uncharacteristic of such detached rural properties, are appropriately scaled and would not appear visually incongruous. Any views of the glazing and the gable projections from the closest footpath to the rear would be across a large agricultural field and with the roof of the dwelling in the background. As such the eye would not be unacceptably drawn to the proposal from its rural surroundings.

    These judgements involve a degree of subjectivity and although I acknowledge the council’s concerns that the proposal would result in large cumulative extensions, overall there would be no significant or materially harmful impact from that increase in any public views. There would be no harmful or unacceptable erosion of the character or appearance of this rural property, its rural setting or the agrarian landscape within which it sits.

    For these reasons, the proposal would not cause harm to the character and appearance of the host property or the area. It would not conflict with Policies GBR2, HOU11 and DES4 of the East Hertfordshire District Plan 2018 which, when taken as a whole and amongst other things require such development to be of a high standard of design, that extensions are appropriate to the character and appearance and setting of the site and/or surrounding area in terms of a number of typical design considerations, reflect local distinctiveness and are generally subservient to the dwelling.

  5. Section 06

    Other Matters

    The Council’s delegated report appears to question the lawfulness of the existing extensions I have referred to above and in the footnote below. However, no substantive details are provided as to the significance of this for the appeal and within the context of a Householder appeal it is not within my remit to determine whether such development is lawful. Given the nature of the proposal before me and amongst other considerations, this would be a matter solely between the council and the appellant to address. On the 1 LPA ref: 3/16/1010/HH, 3/16/0949/PNHH and 3/16/0122/HH. evidence before me I see no reason why it should affect my determination of this appeal or in this particular case, be a consideration that should prevent me allowing the appeal and granting planning permission. I have not therefore considered it necessary to have regard to it any further.

  6. Section 07

    Conclusion

    The proposal would be in accordance with the development plan, when read as a whole. There are no material considerations, including the National Planning Policy Framework which indicate a decision should be made other than in accordance with it.

    I have considered the conditions put forward by the Council. Aside from the standard time limit condition, a condition is required to ensure compliance with the approved plans as this provides clarity. I note the suggestion with regard to matching materials but the approved plans refer to ‘[name], it is therefore necessary for the parties to agree the details of this material, along with the other materials to be used in the construction of the external surfaces.

    The appeal is allowed subject to the conditions above.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 2520No official casework-database value to compare
    Extracted decision date · page 1
    18 October 2022Matches the official casework database
    Extracted site visit dates
    7 September 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3298887
Application reference
3/22/0391/HH
Lead case reference
Not recorded
Planning authority
East Hertfordshire District Council
Planning authority code
E07000242

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
48 m²
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
13 May 2022
Valid date
13 May 2022
Start date
25 May 2022
Planning authority decision date
22 April 2022
Appeal decision date
18 October 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
22117
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21