Skip to main content
Official casework recordAllowedCurrent release

Appeal 3299008

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a wooden cabin to the side of the property to be used for sleeping accommodation.

  1. Section 02

    Decision

    The appeal is allowed, and planning permission is granted for a wooden cabin to the side of the property to be used for sleeping accommodation at [site address] in accordance with the terms of the application, [name]/2021/75/P, dated 21 May 2021, and the plans numbered 21/217/01, 21/217/02, 21/217/03 and an undated Site Layout Plan.

  2. Section 03

    Procedural Matter

    The development which is the subject of the appeal has already taken place nevertheless I have assessed it on its planning merits irrespective of it having already taken place.

  3. Section 04

    [name]

    The main issues in the appeal are whether the development provides appropriate living conditions for future occupants in terms of facilities, the effect of the proposal on the character and appearance of the area having particular regard to local policy and the effect of the proposal on flood risk.

  4. Section 05

    Living conditions for future occupants

    The appeal site is a semi-detached dwelling with a front, side and rear garden and it is situated on [address] at its junction with [address]. It has off-road parking at the front next to the front garden. It is within a residential area which includes similar dwellings and is within the defined settlement envelope of Rye. It faces north west and is within a flood zone.

    The building for which permission is sought is situated in the side garden of the dwelling behind a close-boarded fence and gate which separate the front garden from the side and rear garden area. The rectangular timber building is about 5.3m wide, about 3.3m deep and has a flattish roof at a height of about 2.65m. It has a patio door and a window to the front and a high-level window to the rear which faces [address]. It is insulated and heated. It is in use as sleeping accommodation incidental to the use of the main residential dwelling.

    An annex or outbuilding within the curtilage of a main residential dwelling can generally be used as sleeping accommodation ancillary to the use of the main dwelling. In this case, the cabin does not have a WC or a bathroom. However, this does not render it unacceptable in planning terms or in real terms for an ‘occupant’ who is using it as sleeping accommodation. Occupants of the appeal site in fact occupy the whole of the planning unit which in this case includes the main house and the cabin. The cabin is sleeping accommodation incidental to the enjoyment of the main dwellinghouse.

    The cabin is not a separate and independent residence and does not need to be equipped with facilities necessary to support day-to-day living needs. In this case, WC and bathroom facilities are a couple of steps away in the main house via a door which is situated on the south-eastern flank wall of no.44. That is an adequate arrangement for this cabin at this site.

    On this issue, I conclude that the development provides acceptable living conditions for occupants of the appeal site. There is no breach of policy OSS 4 of the Rother Local Plan Core Strategy (adopted 2014).

  5. Section 06

    Character and appearance

    The upper part of the building is visible from the streetscene above the fence line. However, the visible part is not extensive or eye-catching. In appearance it does not differ greatly from a contemporary flat-roofed garden shed that might typically be glimpsed in rear gardens in similar residential areas. The cabin does not sit forward of the front building line of no.44. It does not appear dominant, alien or incongruous in the streetscene. 10.Policy DHG10 of the Rother Development and Site Allocations Local Plan states that the creation of an annex will be considered in accordance with a sequential approach starting with whether an extension to the main dwelling might achieve the annex, then whether an existing building in the curtilage might be converted to be an annex. Finally what is envisaged is a new building in the curtilage in close proximity to the main dwelling which shares services with it. From the evidence available to me it is clear that the appellant meets that sequential approach because a) the landlord would not allow an extension, and, b) there is no suitable existing curtilage building that could be converted to use as an annex; as a result the development would be in close proximity to and share facilities with the host dwelling. 11.On this second issue, I conclude that the proposal does not harm the character or appearance of the streetscene and the proposal does not conflict with policy DHG10 of the Development and Site Allocations Local Plan (adopted 2019) or policy OSS4(iii) of the [name] (adopted 2014). Flood risk 12.The cabin is providing sleeping accommodation and it is ground floor accommodation. It is in [name] 3 which is land which has a high probability of flooding, in this case from surface water. The cabin for sleeping is classed in Planning Practice Guidance as a “more vulnerable development”. The Environment Agency has objected to the development. 13.The NPPF advises that inappropriate development in areas at risk of flooding should be avoided by directing development away from areas at highest risk. Policy EN7 in the [name] is permissive of development in an area identified as a flood risk if it submits a site-specific Flood Risk Assessment which demonstrates that the development will be safe, will not increase flood risk elsewhere, and, where possible, will reduce flooding. 14.In this case, no site specific Flood Risk Assessment has been submitted. Nevertheless, a recent Flood Risk Assessment for a site of [address] well within 0.5km of the appeal site and also principally in [name] 3 has been submitted. From the [name] (1:10,000), it is evident that no flooding by any of the identified sources has occurred within 0.5km of the [address] site and so that would include the appeal site. The development is minor development in terms of paragraph 167 of the NPPF and so is not subject to the flood-related sequential test or exception tests in national policy. 15.In addition to the information in the [address] FRA, the building has been raised up on concrete slabs located on permeable gravel, allowing for surface water drainage and a high finished floor level. It has been located where a shed and a greenhouse of similar footprint to the cabin were previously located and where the proposed occupant can gain easiest access to the host dwelling, utilizing existing concrete paving rather than laying any further non-permeable materials. 16.Overall, notwithstanding the lack of a site-specific flood risk assessment, I am satisfied that the spirit of policy EN7 is met and it has been demonstrated that the development is safe and does not increase flood risk elsewhere.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 98No official casework-database value to compare
    Extracted decision date · page 1
    5 September 2022Matches the official casework database
    Extracted site visit dates
    10 August 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3299008
Application reference
RR/2021/75/P
Lead case reference
Not recorded
Planning authority
Rother District Council
Planning authority code
E07000064

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
10 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
16 May 2022
Valid date
16 May 2022
Start date
25 May 2022
Planning authority decision date
1 March 2022
Appeal decision date
5 September 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
20233
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21