Appeal 3299324
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
Replacement of the old masonry front boundary wall with new wall, including facing brick, piers and infill metal railing and gates.
Section 02
Decision
The appeal is dismissed.
Section 03
Procedural Matter
At the time of my site visit, I saw that the development of the new wall, piers, railings and gates had commenced and appeared to be substantially completed, although the stone capping to the piers indicated on the submitted plans were absent. I also note that the application has been submitted retrospectively and this is acknowledged by both parties. I have dealt with the appeal on that basis.
Section 04
[name]
The main issue is the effect of the appeal proposal on highway safety, with particular regard to use of the appeal property’s junction with the B3065 ([address]).
Section 05
Reasons
The development has introduced a brick wall and piers, with railings, a pedestrian gate and double vehicular gateway. The gateway is set back from the road, with a curved wall providing the boundary which meets the edge of the pavement. From the documents before me, I am able to see that the wall which was previously in situ was significantly lower, with no railings or piers along the length of the boundary.
[address] is an arterial road serving the local area and consists of primarily residential properties in the immediate vicinity. The appeal site occupies a wide elevation along the road, located adjacent to neighbouring properties of similar sizes and plot widths. The adjoining boundary treatments consist of a low wall with hedge to the north, and a taller painted wall to the south.
The appeal site is located on the western side of the road where it begins to bend travelling northbound, with a smaller road ([address]) creating a junction on this bend off to the north-east. There is also a small gated lane close to this junction, running off the bend towards the south-east ([address]). The appeal site is located in a position where the road is gently falling downhill, before rising again gently from the bend.
There is disagreement between the main parties as to whether the height of the wall at the access between the appeal site and [address] can adequately provide suitable visibility. In addition, the parties do not agree on the stopping sight distances that should be used to calculate the visibility splay at the junction, and therefore, whether appropriate visibility can be achieved. As a result there is dispute whether the development would meet with the advice in local and national planning policy.
Visibility on to the north-east of the site is poor largely due to its orientation with the highway, the bend in the road and the height of the wall as it meets the pavement. I have not been provided with any details of proposed visibility splays which indicate that sufficient sightlines could be achieved when leaving the site in a forward gear, or to demonstrate that a reduced visibility splay can be achieved and is acceptable.
The appellant has provided evidence of research into traffic speeds and the correspondence with the Council’s Highways Officer, however there is no evidence to suggest that there would be space sufficient to provide adequate visibility to drivers at the point of crossing the pavement from the appeal property, and the point of entering [address].
I note the CrashMap data provided to demonstrate the limited number of incidents along the road and near to the appeal site. Additionally, the appellant has confirmed that stopping distances of modern cars are improving. Nonetheless, as I have not been provided with any evidence to suggest that the splays as required could be achieved, and therefore I am not persuaded that the necessary visibility splays could be secured and maintained in perpetuity in both directions.
Policy PP35 of the Local Plan1 confirms that new development will be required to provide safe access to the highway. The Council’s SPD2 states that visibility at site accesses must ensure that there is adequate inter-visibility between vehicles, taking into account traffic speeds, volumes and road configurations. In addition, it states that visibility splay should be kept clear of obstruction above 0.6m in height as measured from the adjoining highway level. The wall as constructed directly conflicts with this height restriction and contributes to the inadequate visibility to vehicles exiting the site. I have considered this appeal on its own merits and concluded that it would cause harm for the reasons set out above.
For the above reasons, on the basis of the evidence before me and taking into account the benefits of the proposal, I conclude on this issue that the proposal would result in hazardous conflicts between users and thus dangerous 1 Poole Local Plan (November 2018) 2 Parking Standards Supplementary Planning Document, BCP Council (January 2021) manoeuvres which would have a harmful effect on highway safety. As such, it would conflict with Policy PP35 of the Local Plan and the guidance on visibility at accesses within the Council’s SPD.
Section 06
Other Matters
Whilst there has been correspondence between the appellant and the Council regarding speeds, stopping distances and the classification of the road, there does not appear to be any agreement on the findings or methodologies. [name] accept that the road may not be a ‘primary’ route or trunk road, I was able to see at my site visit that there was a relatively steady flow of traffic in both directions along [address]. The appellant has confirmed that the links between [name] with the Sandbanks peninsula result in increased traffic during peak tourist months and I accept that this could result in reduced traffic speeds. I also accept that the proposal serves an existing dwelling, and that there would be no additional impact to the highway network as a result of increased traffic. Notwithstanding these points, this does not overcome the harm I have identified above.
Section 07
Conclusions
For the reasons set out above and having regard to all other matters raised I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 171No official casework-database value to compare
- Extracted decision date · page 1
- 10 October 2022Matches the official casework database
- Extracted site visit dates
- 15 August 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3299324
- Application reference
- APP/21/01815/F
- Lead case reference
- Not recorded
- Planning authority
- Bournemouth, Christchurch and Poole
- Planning authority code
- E06000058
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 0 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 20 May 2022
- Valid date
- 20 May 2022
- Start date
- 6 July 2022
- Planning authority decision date
- 4 May 2022
- Appeal decision date
- 10 October 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 21739
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21