Skip to main content
Official casework recordAllowedCurrent release

Appeal 3299547

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

Retrospective: Erection of [name].

  1. Section 02

    Decision

    The appeal is allowed and the planning permission Ref 21/2675/RSP for Retrospective: Erection of [name] at [site address] , Heronsgate [postcode] granted on 22 April 2022, by Three Rivers District Council, is varied by deleting condition 2 and condition 3.

  2. Section 03

    Main Issue

    The main issue is whether condition 2 and condition 3 are necessary or reasonable in the interests of safeguarding the character and appearance of the area.

  3. Section 04

    Reasons

    The approved drawing 001 E shows the installation of planted trellis on top of fencing along the rear elevation and a side elevation of the outbuilding. The latter is adjacent to the boundary of a neighbouring property. These works have not yet been undertaken. However, some new planting has been provided in the form of bamboo plants in planters along the side elevation of the outbuilding which faces the turning circle within Waterfield.

    The side elevation of the outbuilding which is adjacent to the boundary of a neighbouring property is largely screened by the boundary fence. Although parts of this side elevation are visible from the neighbouring property, this is not particularly significant in length, and is partly screened by planting on the neighbour’s side. Nevertheless, it is not uncommon for outbuildings to be visible to some extent from neighbouring properties. Furthermore, because of the limited gap between the outbuilding and boundary fence, I am not convinced that new planting here would be successful. Therefore, I consider the existing arrangement of the outbuilding relative to the boundary of the neighbouring property to be acceptable.

    Notwithstanding the proposed landscaping, there is an existing planting bed which encloses the side elevation of the outbuilding which faces the turning circle and its rear elevation. This planting bed incorporates established landscaping which has been augmented with a mature Holly plant. This existing landscaping, largely screens and assists the outbuilding to assimilate with the verdant character of the area. In particular, in views from communal areas, such as the turning circle.

    The existing planting bed does not form part of the approved scheme and therefore its retention cannot be guaranteed. Despite this, the planting bed has been retained and improved during the construction of the outbuilding. Therefore, there is nothing to suggest that its removal is likely. Even if the existing landscaping was removed, the approved landscaping because of its modest extent would offer limited screening of the outbuilding.

    Consequently, the approved landscaping scheme is not integral to the overall design of the approved development and therefore a condition requiring this is not reasonable or necessary in the interests of safeguarding the character and appearance of the area. As such, the deletion of condition 2 would not be in conflict with Policies CP1 and CP12 of the [name] (adopted October

    (CS) and Policy DM6 of the Development Management Policies Local Development Document (adopted July 2013) (LDD). Amongst other matters, these policies seek to secure high quality design. Condition 3

    Because of its siting, form and external cladding, the approved development is distinctly designed as an outbuilding. Consequently, even if the existing landscaping was not in place, the approved development would be apparent as an outbuilding, irrespective of the colour of its cladding.

    Notwithstanding the above, the extant grey finish on the outbuilding complements its contemporary appearance and is consistent with other features of the host property, including the external paving and garage doors which are also finished in grey. Therefore, the grey finish on the outbuilding is acceptable in the context of the host property and area.

    For the above reasons, condition 3 is not necessary or reasonable in the interests of safeguarding the character and appearance of the area and its removal would not be in conflict with Policies CP1 and CP12 of the CS and Policy DM1 and Appendix 2 of the LDD. Together, these policies seek to secure high quality design.

  4. Section 05

    Other Matters

    I have taken account of the representations made in support of the retention of the disputed conditions. However, for the reasons set out above, these do not alter my findings on the main issue. The allegations and concerns raised in respect of matters which are unrelated to the conditions in dispute do not affect my findings on the main issue.

  5. Section 06

    Conclusion

    For the reasons given above, I conclude that the appeal should succeed. I will vary planning permission (Ref 21/2675/RSP) by deleting disputed condition 2 and condition 3.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 196No official casework-database value to compare
    Extracted decision date · page 1
    3 October 2022Matches the official casework database
    Extracted site visit dates
    31 August 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3299547
Application reference
21/2675/FUL
Lead case reference
Not recorded
Planning authority
Three Rivers District Council
Planning authority code
E07000102

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
4. Grant planning permission for the development subject to conditions to which you object
Appeal reason
Appeal Against Conditions
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0.08 hectares
Floor space
37 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
23 May 2022
Valid date
23 May 2022
Start date
11 July 2022
Planning authority decision date
22 April 2022
Appeal decision date
3 October 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
21381
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21