Skip to main content
Official casework recordDismissedCurrent release

Appeal 3299734

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

front wall, pillars, and gate (retrospective).

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    [name]

    I have dealt with the appeal based on the submitted plans, which ostensibly align with a wall, pillars and gate that I saw had been installed to the front of the appeal site.

  3. Section 04

    [name]

    The main issues are (i) the effect of the proposal on the character and appearance of the area; and (ii) the effect of the proposal on pedestrian and highway safety.

  4. Section 05

    Character and Appearance

    The appeal site includes a detached dwelling within a ribbon of buildings which line one side of [address] between open fields. The nearby buildings are typically set back from the street behind areas of parking or soft landscaping, and face towards further open land beyond hedgerow to the opposite side of [address] which the Council indicates is designated as Green Belt. Treatments to the front of the sites vary, but the majority are either open; or are defined by relatively low walls, fences and railings and/or by mature soft landscaping. As a result, there is a general feeling of verdant openness to the front of the buildings which complements and provides a sense of transition to the open land opposite. While this part of [address] is on a bus route and carries 2 lanes of traffic, I nevertheless find that these factors contribute a semi-rural character to the area overall.

    The appeal proposes a brick wall topped by railings and a set of black metal gates between brick pillars. I acknowledge that there is diversity in the nature of boundary treatments nearby, but the appeal development is notably higher than the gates, walls or fences that I saw in the vicinity, and results in gates with fairly close-set bars and a large expanse of solid wall spanning the width of the site. The appellant has highlighted examples of high hedges that are present nearby, including hedges to the neighbouring dwellings which are of similar or greater height than the development, as well as the dense hedge along the opposite site of [address]. However, the need for access to dwellings means that hedges do not typically extend across the full width of plots, and the soft and natural quality of these features serves in any case to enhance the appearance of the area, reinforcing its verdant, semi-rural character.

    In contrast, the height of the proposed development together with the materials results in an uncharacteristically formal and harsh visual barrier along the frontage of the appeal site, albeit one through which there are still some views of the dwelling. As well as resulting in an unusual degree of enclosure and giving the site the appearance of being set apart and segregated from its surroundings, this significantly diminishes the open and semi-rural character of this part of [address] and erodes the setting to the open land within the Green Belt opposite. In my judgement, the development stands out as a large and obtrusive feature in the street scene, and detracts from the character and appearance of the area.

    The appellant indicates that the boundary was formerly marked by fencing and hedge. However, the photograph provided suggests that the fence was much lower than the wall and gates now proposed. While the hedge may have been taller and denser, it did not extend across the full width of the site, and in my view its softer, natural appearance would provide for a more sympathetic boundary than the appeal development.

    The appellant has also commented that walls and gates become a more prominent fixture as you travel further south along [address]. However, these are some distance from the appeal dwelling beyond open fields and are not visible in the same street view, and I have not in any event been directed to any examples of comparable height to the appeal proposal. I do not therefore find these features to be a compelling justification for the development before me.

    Irrespective of the use of materials to match the host dwelling, I find for these reasons that the development is not high quality design. It does not assimilate well with its surroundings and I conclude that the proposal causes unacceptable harm to the character and appearance of the area. As a consequence, there is conflict with Policy BE1 of the Hillingdon Local Plan: Part 1 – [name] 2012 and [name] 11, DMHB 12, DMHB 14 and DMEI 6 of the Hillingdon Local Plan: Part 2 – Development Management Policies 2020 (‘LPP2’). Together and amongst other things, these policies broadly seek high quality design that respects and is appropriate to local character, that harmonises with the local context taking into account factors including the degree of enclosure in the surrounding streetscape, and that assimilates with adjacent areas of Green Belt.

  5. Section 06

    Pedestrian and [name]

    The gates are positioned on the front boundary of the site, and the Council is concerned that the lack of a set back could result in vehicles blocking the main carriageway while the gates are opening. However, the evidence before me indicates that there have previously been wooden gates to the site that would have needed to be opened manually, while those now proposed can be opened remotely on approach to the site, helping to reduce the likely duration of vehicles waiting on the carriageway.

    I appreciate that this part of [address] is busy and a bus route. Even so, it is relatively straight and vehicles waiting to enter the site would be visible for some distance in both directions. Approaching traffic would therefore be able to adjust speed in good time and, if necessary, stop while the gates opened. Any delays would be likely to be of short duration and fairly low frequency given that the site is occupied as a single dwelling, and having regard to these factors, I do not find that the position of the gates on the boundary results in significant inconvenience or detriment to highway safety.

    Moreover, the appellant has referred to potential for a gate of up to 1m in height to be installed using permitted development rights under Class A, Part 2 of Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). I have no firm reason to conclude that such rights would not be applicable here, and there would appear to be a reasonable prospect of these rights being utilised if the appeal is dismissed. I have therefore taken this fallback position into account, and while I have found that the greater height of the boundary now proposed would harm the character and appearance of the area, it seems to me that there would be no significant difference from the fallback in terms of vehicles waiting on the carriageway.

    Despite the greater height of the boundary, the information before me also indicates that the fence and hedge that were formerly on the boundary of the site would have been likely to present a similar degree of obstruction to visibility towards the north. I therefore consider it unlikely that the potential for conflict with vehicles or pedestrians approaching the site from that direction is increased.

    However, the fence and post that the appellant’s evidence shows were formerly at the boundary closest to [address] were lower than the appeal development, resulting in lesser obstruction to visibility towards the south than would now occur. The appellant comments that pedestrian numbers passing the site are low, and I agree that vehicles exiting the site would be likely to be readily apparent to approaching pedestrians. Based on my observations at my visit though, vehicles would be likely to have traversed some way over the footway and very close to the carriageway, if not onto it, before they would have a full view of the road. I am concerned that the proposal increases potential for conflict or near misses with northbound traffic, particularly where vehicles may be passing the site in the southbound lane as they overtake buses waiting at the bus stop to the opposite side of the road, and so may not be focusing on vehicles that could be leaving the appeal site. Accordingly and in the absence of substantive evidence to demonstrate that suitable standards of visibility could be achieved, I am not satisfied that highway safety is not harmed by the proposal.

    I therefore conclude that the proposal would be detrimental to highway safety resulting in conflict with Policy DMT2 of the LPP2 which includes requirements that development ensures safe and efficient vehicular access to the highway network and that it does not contribute to deterioration of safety for road users and residents.

  6. Section 07

    Other Matters

    The appellant advises that the wall, pillars and gates provide security for parked vehicles and a barrier to prevent children reaching the highway. However, I have not been provided with substantive evidence to demonstrate that a boundary of the height proposed would be necessary to achieve these objectives, and I do not consider that the safety and security benefits identified by the appellant would outweigh the harm that I have found is caused to the character and appearance of the area and to highway safety.

  7. Section 08

    Conclusion

    For the reasons given above, I find that the proposal conflicts with the development plan when it is read as a whole, and material considerations do not indicate that a decision contrary to the development plan should be reached.

    I therefore conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 457No official casework-database value to compare
    Extracted decision date · page 1
    29 July 2022Matches the official casework database
    Extracted site visit dates
    26 July 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3299734
Application reference
36557/APP/2021/4630
Lead case reference
Not recorded
Planning authority
London Borough of Hillingdon
Planning authority code
E09000017

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
25 May 2022
Valid date
26 May 2022
Start date
7 June 2022
Planning authority decision date
19 April 2022
Appeal decision date
29 July 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
18583
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21