Skip to main content
Official casework recordDismissedCurrent release

Appeal 3300008

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

loft conversion with new dormers and hip to gable extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Appeal Procedure

    The site visit was undertaken by an Appeal Planning Officer whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposal upon the character and appearance of the host dwelling and the surrounding area.

  4. Section 05

    Reasons for the Recommendation

    The appeal property (No.22) is a semi-detached bungalow located on [address] in Acton area of London. It has been extended at the rear, nevertheless, is symmetrically paired with the neighbouring property no.23. They are part of a group of semi-detached bungalows of similar scale and design, which surround a garden square area and are accessed from [address] via a pedestrian path. The surrounding area is residential, and there are other similar groups of semi-detached bungalows grouped in such manner. This creates a neat and unified streetscene.

    The proposal would wrap around the entire rear roof slopes and more than half the north elevation roof slope. This would be contrary to guidance provided in the (2004) Plan for the Environment, Ealing’s unitary development plan Supplementary Planning Documents (the ‘SPD’): SPD 4 [name]. It advises that roof extensions comprising dormer windows should not wrap around two roof slopes1.

    The proposal would appear top heavy by virtue of its mass and despite the proposed use of matching materials, it would not appear as a subordinate addition to the existing dwelling. This would be harmful to the appearance of the host dwelling as with the proposed extensions being of the same height as the ridge of the existing house, it would create the visual effect of a partially flat-roofed two-storey dwelling and present an awkward and obtrusive resultant design. I have had regard to the appellant’s contention that the proposed development would not be visible from [address] as it is mostly at the rear of the property, but whilst this may well be the case, it would nevertheless be visible from a number of private vantage points, and this would not provide acceptable mitigation for the poor design quality of the resultant dwelling.

    The proposal would also significantly imbalance the symmetrical pair with no.23 and detract from the contribution of the pair to the character of the group of bungalows and the streetscene. The sheer bulk of the proposed development would set it at odds with the prevailing character, reinforcing the impression of a two-storey development as demonstrated in the submitted plans, that would represent an incongruous addition to the area.

    The appellant refers to other dormer extensions within the surrounding area. Although each proposal must be assessed on its own individual merits, it is clear that many of these examples are either of a smaller scale than is proposed, do not wrap around more than one roof slope or relate to two-storey properties. Due to the differing circumstances, they do not therefore set a precedent for the proposed development.

    Taking all the above points together, I find that the design, scale and mass of the proposed loft conversion with new dormers and hip to gable extension would harm the character and appearance of the host property and the surrounding area. Accordingly, there would be conflict with the aims and objectives of Policies D4, D5 and D6 of the London Plan (2021) and Policy 7.4 of the Ealing Development Management DPD (2013), the National Planning Policy Framework (2021) as well as the SPD. These seek amongst other things to ensure that new development respects the local character of existing built areas with regard to street sequence, building pattern, scale, materials and detailing.

  5. Section 06

    Other Matters

    I have had regard to the appellant’s desire to improve the overall quality of the property and create additional space for a growing family as well as family visiting from abroad, and furthermore to provide additional space to work from home. However, whilst I recognise these to be benefits of the proposal personal to the appellant, they do not outweigh the harm that would be caused by the proposed development.

  6. Section 07

    Conclusion and Recommendation

    The proposed development conflicts with the development plan taken as a whole and there are no other considerations, including the National Planning Policy Framework, that outweigh this conflict. 1 [name] 6.2 in section 6.0 on page 18

    For the reasons given above and having had regard to all other matters raised, I recommend that the appeal should be dismissed. Ifeanyi Chukwujekwu APPEALS PLANNING OFFICER

  7. Section 08

    Inspector’s Decision

    I have considered all the submitted evidence and the Appeal Planning Officer’s report, and on that basis, I agree with the recommendation and shall dismiss the appeal.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 376No official casework-database value to compare
    Extracted decision date · page 1
    23 August 2022Matches the official casework database
    Extracted site visit dates
    5 July 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3300008
Application reference
220534HH
Lead case reference
Not recorded
Planning authority
London Borough of Ealing
Planning authority code
E09000009

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
28 May 2022
Valid date
28 May 2022
Start date
8 June 2022
Planning authority decision date
5 April 2022
Appeal decision date
23 August 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
19734
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21