Appeal 3301073
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
ground and first floor side extension including conversion of roofspace to habitable use to include a rear dormer and a front roof light and alteration to the rear extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The main issue is the effect of the proposal on the character and appearance of the host dwelling and area.
Section 04
Reasons
The appeal dwelling is located on [address] at its junction with [address]. Nearest to the site, [address] is generally characterised by two-storey semi-detached and terraced buildings of similar designs including catslide roofs that extend out over set-back single-storey side projections. Some extensions and alterations are visible, but the original form of the buildings typically remains readable, and there is a high degree of consistency in their overall appearance which is distinctive.
In accordance with requirements specified within Policy DMHD 1 of the Hillingdon Local Plan: Part 2 – Development Management Policies 2020 (‘LPP2’), the side extension would be set back 1m from the main front elevation of the appeal dwelling and set in 1m from the boundary to the side of the site. However, its width would far exceed half the width of the original property at first-floor and roof levels, in conflict with the requirement at part C)i) of Policy DMHD 1. While the roof of the extension would be slightly set down from the main roof, the increase in the bulk and mass of the upper part of the dwelling would be substantial, and the considerable scale of the extension relative to the host property means that I find it would not be a subordinate addition.
In addition, the rear dormer would be far wider than the original roof at second-floor level in conflict with Policy DMHD 1 of the LPP2 which states that roof extensions should not exceed more than two thirds the average width of the original roof. The appellant asserts that the dormer would be modest scale in comparison to the width of the proposed dwelling. Nevertheless and notwithstanding the set back from the eaves and set in from the sides of the roof, the dormer could not in my judgement reasonably be described as subservient to the scale of the existing roof, and it would further add to the considerable increase in the overall bulk and mass of the building.
Taken together, I find that the dormer and side extension would result in oversized and disproportionate additions that would dominate and overwhelm the appeal building. Moreover, the proposal would result in the wholesale loss of the distinctive catslide roof to the side of the dwelling. In combination with the scale of the development proposed, this would undermine the character and integrity of the building on the appeal site, and the hipped roof over the side extension would stand out against the more typical catslide roofs to this part of [address].
The upper part of the dwelling would further be of much greater overall width than others nearby, and the considerable increase in scale of the building and loss of the catslide roof would unbalance the host terrace as a whole and harmfully erode the visual unity of this part of the street scene. The side extension would also step much closer to [address] than the front of dwellings to the rear of the site. Despite the set back of the extension from the front elevation facing [address], this would result in a significant reduction in space around the corner and would increase the visual impact and prominence of the development, particularly in views along [address].
Irrespective of the external finish of the building, I find for these reasons that the scale and form of the dwelling would be conspicuous, and the development would stand out as an incongruous and poorly integrated addition.
The appellant has drawn my attention to examples of large dormers at [address] and [address] nearby. However, these are typically at first floor level and are set within retained original catslide roofs which helps to reduce the overall increase in the bulk and mass of the buildings and the visual impact of these developments on the host properties and area. These examples are not therefore directly comparable to the appeal proposal, and they do not offer a compelling justification for the harm that I have identified. Nor do I find that the harm would be outweighed by the modest benefits of the development in providing additional living space for occupiers of the dwelling
For these reasons, I conclude that the proposal would cause significant harm to the character and appearance of the host building and area and it would conflict with Policy BE1 of the Hillingdon Local Plan: Part 1 – [name] 2012 and [name] 11, DMHB 12 and DMHD 1 of the LPP2. Amongst other things, these policies together broadly seek good design, development that harmonises with the local context, and subordinate extensions that do not adversely affect the character, appearance or quality of the area.
Section 05
Conclusion
The proposal would conflict with the development plan when it is read as a whole, and material considerations do not indicate that a decision contrary to the development plan should be reached. I therefore conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 457No official casework-database value to compare
- Extracted decision date · page 1
- 5 August 2022Matches the official casework database
- Extracted site visit dates
- 26 July 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3301073
- Application reference
- 17948/APP/2021/3995
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Hillingdon
- Planning authority code
- E09000017
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 14 June 2022
- Valid date
- 14 June 2022
- Start date
- 22 June 2022
- Planning authority decision date
- 25 March 2022
- Appeal decision date
- 5 August 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 18872
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21