Appeal 3301076
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the erection of dormer to rear roof slope and outrigger, 1no rooflight to front slope, revised fenestration to side and rear elevation with associated alterations.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
I use the Council’s description of development which is more precise than the application form; I note the Appellants also use this on the appeal form.
Section 04
[name]
The main issues are the effect of the proposal on a) the character and appearance of the host property and the locality and b) living conditions for neighbours.
Section 05
Character and appearance
The appeal property is a two-storey end of terrace home with a substantial rear box dormer and a two storey flat roofed outrigger. There are many similar dwellings in the locality albeit the property alongside (No 8) is of different design and period and is on an appreciably set back front building line. The area is of established residential character and generally pleasing appearance. The proposal is as described above.
In visual terms the existing arrangement to the rear of the appeal property is not ideal with the somewhat bulky predominant box dormer but a) it mirrors others found locally and b) it is on the main roof slope and not sitting on the outrigger. The planned new projection, effectively adding a dormer to the existing dormer, would not accord with a) or b). The scheme would represent ungainly development, making the upper level top heavy, and awkward in design terms. To my eye this would be a step too far. The top-heavy final structure would lack aesthetic quality in its own right and stand out in the vicinity as an alien and uncomfortable visual form amongst other more subtle arrangements. I recognise that views of the scheme would be limited though many households would see the development and visibility would be clear looking south along [address], largely due to the stepped building line. Indeed, that stepping of No 8 alongside the planned works would make for a very awkward scene with an upper level gap being replaced by built development jarring on the eye. In my assessment the appeal proposal would represent poor quality design.
Policies QD14 of the Brighton and Hove Local Plan (LP), CP12 of the City Plan Part One (CP1) and DM21 of the City Plan Part 2 (CP2) are relevant. Taken together and amongst other matters, these policies seek well designed and suitably scaled development that should protect the character and visual quality of buildings and the local distinctiveness of their wider area and generally have architectural merit. This is reflected in the advice and objectives of the Council’s SPD12 [name] for Extensions and Alterations publication albeit that document is guidance and cannot be expected to cover every eventuality. Given the nature of the planned rear dormer I conclude that the proposal would conflict with the relevant development plan policies and the pertinent aims of the SPD.
Section 06
Living conditions
The Council, and some neighbours, are concerned that the proposed rear dormer extension would have an unacceptable impact through loss of light and outlook, and increased actual and perceived overlooking. Given orientation, distance from boundary, size and location of existing built structures, and relative position of neighbouring glazing and its purposing I am not persuaded on the loss of light and outlook points. Furthermore, as the planned dormer is for a bathroom, obscure glazing could prevent overlooking. I do find from time to time that perceived overlooking can be a determining problem. However, in this instance, given a window is to be replaced, the length of the outrigger without any planned development, the arrangement of gardens locally, and the angles of visibility for the new structure, and the degree of actual overlooking already taking place in this urban area, I would not put a perception of overlooking in the category of determining factors towards any refusal of planning permission.
LP Saved Policy QD27 and CP2 Policy DM20 are relevant. Taken together and amongst other matters they seek to protect the amenities of neighbours. Given the foregoing I would conclude that the appeal scheme would not run contrary to these policies.
Section 07
Other matters
I do understand the Appellants’ wish improve and increase accommodation; I can see how the planned bathroom would be a good asset to help meet 2 changing family needs. I do note that the Appellants have sought to overcome concerns by amending plans during the determination process. I have carefully considered all the points raised by the Appellants but these matters do not outweigh the concerns which I have in relation to one of the main issues identified above.
I confirm that policies in the National Planning Policy Framework have been considered and the development plan policies which I cite mirror relevant objectives within that document.
Section 08
Overall conclusion
For the reasons given above I conclude that whilst the appeal proposal would not have unacceptable effects on living conditions for neighbours there would be an undue negative impact upon the character and appearance of the host property and the locality. Accordingly, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 352No official casework-database value to compare
- Extracted decision date · page 1
- 17 August 2022Matches the official casework database
- Extracted site visit dates
- 4 August 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3301076
- Application reference
- BH2022/00170
- Lead case reference
- Not recorded
- Planning authority
- Brighton and Hove City Council
- Planning authority code
- E06000043
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 5 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 14 June 2022
- Valid date
- 14 June 2022
- Start date
- 29 June 2022
- Planning authority decision date
- 31 March 2022
- Appeal decision date
- 17 August 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 19440
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21