Appeal 3301101
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
alterations to roof including roof extension above existing rear hipped gable extension, installation of a roof lantern within the roof space of the main gable, side and rear dormer windows and the insertion of a window at second floor level in the side elevation.
Section 02
Decision
The appeal is allowed and planning permission is granted for alterations to roof including roof extension above existing rear hipped gable extension, installation of a roof lantern within the roof space of the main gable, side and rear dormer windows and the insertion of a window at second floor level in the side elevation at [site address] in accordance with the terms of the application Ref: PL/22/0304/FA dated 26 January 2022 and the plans submitted with it, subject to the following
Section 03
conditions:
The works authorised by this consent shall begin not later than three years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: WNSTNLY_501_[name] [name], WNSTNLY_502_[name] [name], WNSTNLY_505_Elevs [name], WNSTNLY_506_[name]:A, WNSTNLY_510_[name] [name].
Notwithstanding what appears on the approved plans or the reference to roof lantern in the description of development, details at a suitably large scale of all new fenestration, dormers and the proposed rooflight shall be submitted to, and approved in writing by, the local panning authority prior to the manufacture of those items. The details of the rooflight shall include the structure and finish of the roof surrounding it and demonstrate that glazing of the approved rooflight will not be visible except from above. The works shall be completed in accordance with the approved details.
Details of all external finishes for the proposed works shall be submitted to, and approved in writing by, the local panning authority; the works shall be completed in accordance with the approved details.
Section 04
Main Issue:
The main issue is the effect of the proposed development upon (i) the character and appearance of the Chesham Conservation Area and (ii) upon the significance of other heritage assets in the vicinity.
Section 05
Reasons:
[address] is a large, detached building sitting within a tightly-knit part of the Chesham Conservation Area (CCA). The part of the CCA in which the appeal site is located is characterised by an irregular mix of older, mostly terraced dwellings, many of modest size, directly fronting narrow streets around which this part of the CCA has evolved.
The works proposed would extend the southern and eastern roof surfaces of the two-storey element at the rear which currently houses a kitchen at ground floor level, up to the main ridge level creating additional attic floor space, lit by an overhead rooflight. There would also be additional dormers on the rear and side main roof surfaces, replacing one existing roof window, and a small window inserted in the east flank wall.
The roof alterations would introduce change to its appearance but [address] is not itself a designated heritage asset and the Council appear to have little concern about the dormers and window insertion. However, concern is expressed about the glassy surface of the proposed roof lantern and its potential to ‘glow in dark skies’ which would draw attention to what would, in my view, be an otherwise largely unobtrusive change to the roof form. The Council refer to the introduction of a new chimney ‘in an attempt to conceal the roof lantern’ however, my observations confirm that the chimney already exists.
Section 66 of the Planning (Listed Buildings and Conservation Areas) Act 1990 (LBCA Act) imposes a duty to have regard to the ‘desirability of preserving a listed building or its setting’ and Section 72 attaches great weight to the desirability of preserving or enhancing a Conservation Area. [address] is an unlisted building in a Conservation Area I shall first consider whether the proposed development lies in the setting of any listed building such that that duty is engaged, and then whether the proposal would preserve or enhance the character and appearance of relevant parts of the CAA.
There are a number of listed buildings in the locality, however, these are generally separated from the appeal site by other unlisted properties. For instance No.16, adjacent to the appeal site, is an unremarkable twentieth-century detached dwelling sitting between the appeal site and 10, 12 and 14 [name] which are all [name] listed.
The weatherboard-clad ([name] listed) barn to [address] lies opposite these buildings and close to the appeal site but this I note, has been altered by a boldly-designed addition which has significantly changed the relationship of the barn with its surroundings. [address] (3-5) which is also listed [name] is at some distance from the appeal site. Overall, although the proposed works would be glimpsed from [address] across the rear of 3- 5, the distances involved and intervening built form are such as to render the changes proposed insignificant.
Consequently, having regard to the positioning of the proposed works and the constrained physical setting of these listed buildings within discrete, separate, plots and the mix of roof forms and heights and intervening buildings, I do not consider the proposed works would affect the way these listed buildings are experienced. I therefore conclude [address] does not lie within the setting of any of the listed buildings I have mentioned and, having regard to the scale, nature and location of the works proposed, further conclude that no harm would arise to the significance of those heritage assets from what is proposed.
[name] have already indicated, the upward extension of the roof, if carried out with appropriate materials and, with new dormers and window, suitably detailed, would not introduce obtrusive change into the CCA. The roof lantern might be visible from some positions and internal illumination would be caught and reflected by glass at night which would draw inappropriate attention to what would otherwise be a dark roof structure amongst many others. Whilst this weighs against the proposal in what might be a fine balance, it is also appropriate to consider whether the development can be made acceptable in planning terms by a suitably worded condition such that no glass, and therefore no reflected light, is visible above its enclosing roof structure. I consider this can be done without affecting the rights of any party and have proceeded to determine the application accordingly.
I have concluded that the development would not cause harm to, and would therefore preserve, the character and appearance of the CCA, nor would the significance of the identified heritage assets be affected. In consequence there is no conflict with policies CA1 and LB2 of the Chiltern Local Plan 1997 (as amended May 2001 and consolidated 2007 and 2011) which seek to preserve and enhance the character and appearance of Conservation Areas and protect the significance of listed buildings. There being no other harms identified, the proposal would accord with the development plan as a whole1 such that the appeal succeeds subject to necessary conditions.
Section 06
Conditions
In addition to the usual plans and timing conditions, control over the materials used and the detailing of the proposed rooflight is necessary to ensure the development is carried out in accordance with the reasoning of the decision and to make the proposal acceptable in planning terms.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2574No official casework-database value to compare
- Extracted decision date · page 1
- 2 September 2022Matches the official casework database
- Extracted site visit dates
- 22 August 2022 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3301101
- Application reference
- PL/22/0304/FA
- Lead case reference
- Not recorded
- Planning authority
- Buckinghamshire Council - Chiltern Area *
- Planning authority code
- E07000005
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 28 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Yes
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 14 June 2022
- Valid date
- 14 June 2022
- Start date
- 24 June 2022
- Planning authority decision date
- 23 March 2022
- Appeal decision date
- 2 September 2022
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 20150
- First seen
- 20 August 2026 at 14:24
- Last seen
- 20 August 2026 at 16:26
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:24
- Record updated
- 24 August 2026 at 16:21