Skip to main content
Official casework recordDismissedCurrent release

Appeal 3301147

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the erection of a first-floor side extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Procedural Matter

    The application was made retrospectively and at the time of my visit I saw that the first-floor side extension was substantially complete although other works to the property appeared to be unfinished and ongoing.

  3. Section 04

    Main Issue

    The main issue is the effect of the development on the character and appearance of the area.

  4. Section 05

    Reasons

    The appeal property is a substantial, semi-detached house with accommodation over three floors and is one of a row of four similar properties at Nos [address] (odd). These form a distinctive group in a prominent location at the entrance to [address], located between an adjacent roundabout junction and a block of flats known as [address] beyond No 7.

    There is some past planning history to the appeal property including an appeal decision dated 26 November 2021 (Ref: APP/Q5300/W/21/3274439). That appeal considered a proposal for conversion of the property into three self-contained flats including a single-storey rear extension, a part first-floor side extension, and a part second-floor side extension. The Inspector at that time noted that some of the proposed works had already been carried out, including the first-floor side extension. The appeal was dismissed for a number of reasons. With regard to the side extension the Inspector concluded that it created a terracing effect with No 5 by substantially reducing the gap between both properties and by disrupting the symmetry of the group given that none of the other houses in the group had been extended to the side above ground floor level.

    I have been provided with a set of the application plans that was considered as part of the last appeal. There are some differences between the side extension depicted on the 2021 appeal plans and those relevant to the current appeal. The previous appeal’s plans show the side extension square to the flank wall of the original building. The current appeal’s plans show the side extension wider to the front and following more closely, but not exactly, the angled alignment of the boundary between Nos 3 and 5. I have no information to confirm if the side extension has been modified since the previous Inspector visited the site in November 2021. Nevertheless, I observed that the side extension was set away from the side boundary with No 5 by only small margins to the front and rear, appearing to be consistent with the drawings submitted as part of this current appeal.

    Policy DMD 14 of the Council’s Development Management Document (DMD), adopted in 2014, deals with side extensions. It requires, amongst other things, extensions to the side of a property to normally maintain a minimum distance of 1m from the boundary with an adjoining property. Contrary to a suggestion by the appellants that the extension would retain a 1m gap with the boundary, it is evident from the plans and from my own observations on site that the side extension does not maintain the 1m separation from the boundary with No 5 that is required by Policy DMD 14.

    Moreover, regardless of the position of the original ground floor garage, the subservient ridge height of the extension, and the use of matching materials, the extension has clearly and substantially reduced the gap at first-floor level between Nos 3 and 5. In the absence of any first-floor side extension to No 5, I accept that space between these two properties is not entirely lost, but that which does remain is almost solely dependent upon space between the boundary and the side of No 5. Due to the close proximity of the extension to the boundary, consistent with the previous Inspector, I find that the side addition has created a terracing effect between both properties, and one which disrupts the symmetry of the group of four by unacceptably closing the gap and altering the setting of these prominent dwellings. In this regard the side extension is harmful to the character and appearance of the area.

    In addition to the conflict I have identified with DMD Policy DMD 14, by failing to achieve a high-quality design and appropriate regard to its surroundings, the proposal would also conflict with [name] 6, DMD 8 and DMD 37, Core Policy 30 of the Council’s Core Strategy 2010, and Policy D4 of The London Plan 2021. For the same reasons there would be conflict with the National Planning Policy Framework’s (the Framework) objectives for achieving well-designed places. The appellants have argued that the proposal would comply with other policies of The London Plan and parts of the Framework in terms of making best use of the land. I recognise that there can often be tensions between policies that pull in different directions, but when seen in the 2 round, for the reasons explained, I have identified clear conflict with the development plan and the Framework.

    My attention has been drawn to examples nearby and in the wider locality where properties have been extended in ways that unbalance a pair, including directly opposite the appeal site. However, I share the previous Inspector’s view that this set of four form a distinctive group, the character and appearance of which is harmed by the side extension. Paragraph 2 of the Framework states that planning law requires applications for planning permission to be determined in accordance with the development plan unless material considerations indicate otherwise. The developments nearby and within the wider area that have been put to me do not lend sufficient weight in favour of the development to outweigh the harm that I have identified and the conflicts with local and national policy. Neither does the personal circumstances of the property’s owner, which I have noted.

  5. Section 06

    Conclusion

    For the reasons given, and having regard to all other matters raised, I conclude that the development is harmful to the character and appearance of the area. The appeal is therefore dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 286No official casework-database value to compare
    Extracted site visit dates
    27 July 2022 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3301147
Application reference
22/00765/HOU
Lead case reference
Not recorded
Planning authority
London Borough of Enfield
Planning authority code
E09000010

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
15 June 2022
Valid date
15 June 2022
Start date
28 June 2022
Planning authority decision date
28 April 2022
Appeal decision date
10 August 2022

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
19050
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21