Skip to main content
Official casework recordDismissedCurrent release

Appeal 3301417

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the addition of a rear dormer & hip to gable extension to an existing converted loft space.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    At the time of my site visit, I saw that the development has been completed. As such, I have dealt with this appeal on the basis that the proposed development has been completed largely in accordance with the plans, notwithstanding that the setback with the adjacent property appears to be smaller than indicated on the [name] plan (P-005A).

  3. Section 04

    Main Issue

    The main issue is the effect of the development upon the character and appearance of the streetscene and surrounding area.

  4. Section 05

    Reasons

    The application site consists of a two-story semi-detached dwelling situated on a residential street. The development is a dormer which incorporates a hip to gable extension. Prior to the development, the roof was a hip shape, which sloped from the ridge down to the eaves.

    The properties along Village Way and the surrounding area are similar in age and overall design, albeit several of these properties have been enlarged through dormer extensions. Specifically, I observed that no 104 and no [address], possessed dormer extensions, albeit the existing hip to gable structure had been retained for those properties. These dormers are significantly smaller than the development and both are set back from the edge of their respective roofs. None of the dormer extensions which I observed in the vicinity incorporated such a significant part of the existing roof space as the development. Additionally, the majority of properties which I observed along Village Way do not have any dormer extensions. Consequently, dormers of the scale and size of the development are not a common or characteristic feature of the area.

    From a front street scene perspective, the rear facing bulk of the dormer is not significantly visible from the front street scene. However, the hip to gable extension does result in a highly visible alteration to the appearance of the roofline of the appeal site through the loss of the previous hip shape and replacement with a square frontage. From a rear perspective, there is some limited screening of the development in some angles from nearby trees, however, due to the size and scale of the extension it remains clearly visible from [address] and [address], as well as the footway access path alongside [address]. As a result, the development adds considerable bulk to the roof as a whole and would be a visible presence in front and rear views from the surrounding properties, roads and footpaths in the area.

    In reaching this view, I have considered the Council’s calculations that the conversion adds 80m3 of added volume, which is a proportionally significant amount in relation to the scale and form of the original roof. This figure has not been contested by the Appellant, but it observes that the reduction in the width of the dormer down to 7m would produce an unfortunate roof design. No further information has been provided as to why this would be the case. Regardless, the current design of the development adds considerable bulk, massing and volume to the roof, which would be at odds with the prevailing character of the area.

    Without a set down from the ridge line, a very minimal set in from the party wall and the incorporation of a hip to gable extension, the dormer occupies almost the entirety of the rear roof. This has resulted in a box-like and bulky appearance. Consequently, as it would be highly visible from surrounding properties, I find that the proposed development would appear as a prominent and discordant feature which would be out of keeping with, and harmful to, the appearance of the property and the wider terrace.

    The Appellant points out that planning permission has been granted for roof alterations at other properties in the area, in addition to those which I observed at 104 and [address]. However, I am not aware of the particular circumstances of those cases. In any event, I must consider the appeal scheme on its own merits, and in the context of the current policy regime which requires such additions to complement the scale, proportion and form of adjacent buildings. Whilst there are other isolated properties in the area which have been enlarged through dormer extensions, this does not undermine the requirement for the appeal scheme to respect the prevailing local character where such extensions are not a common feature.

    In conclusion, the appeal scheme would harm the character and appearance of the streetscene and surrounding area and would therefore not comply with the requirement for development to reach a high standard of design and layout, contrary to Policy 37 of the Bromley Local Development Framework Local Plan (2019)

  5. Section 06

    Conclusion

    I have found that the appeal scheme conflicts with development plan policy and thus find that it would be contrary to the development plan as a whole. No material considerations have been demonstrated which would outweigh the planning development conflict. Therefore, for the reasons set out above, and having had regard to all other matters raised, I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 3668No official casework-database value to compare
    Extracted decision date · page 1
    26 January 2023Matches the official casework database
    Extracted site visit dates
    11 January 2023 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3301417
Application reference
DC/22/01317/FULL6
Lead case reference
Not recorded
Planning authority
London Borough of Bromley
Planning authority code
E09000006

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
23 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
20 June 2022
Valid date
20 June 2022
Start date
12 July 2022
Planning authority decision date
24 May 2022
Appeal decision date
26 January 2023

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
27087
First seen
20 August 2026 at 14:24
Last seen
20 August 2026 at 16:26
Removed from release
Not recorded
Record created
20 August 2026 at 14:24
Record updated
24 August 2026 at 16:21